Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | -29.10% | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 LAdmitted-Finance | -28.79% | ₹5.3 L | L2 | Admitted-Finance |
| 3 | L3₹6.3 LAdmitted-Finance | -16.10% | ₹6.3 L | L3 | Admitted-Finance |
| 4 | L4₹6.8 LAdmitted-Finance | -10.00% | ₹6.8 L | L4 | Admitted-Finance |
| 5 | L5₹7.4 LAdmitted-Finance | -1.00% | ₹7.4 L | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15,020
Closing Date
30 Dec 2025, 4:00 pmClosed
EXECUTIVE ENGINEER ED RAJOURI JPDCL
RAJOURI
EDR/76 OF 2025-26
2025_PDD_298330_2
EDR/76 OF 2025-26
Open Tender
Civil Works
RAJOURI
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
EXECUTIVE ENGINEER ED-RAJOURI JPDCL
₹15,020
3 Feb 2026
16 Dec 2025
31 Dec 2025
16 Dec 2025
30 Dec 2025
16 Dec 2025
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER, ELECTRIC DIVISION, JPDCL, RAJOURI
Name of Work: 1. UPGRADATION OF DIVISONAL WORKSHOP AT ED-RAJOURI UNDER UT CAPEX 2025-26. (All the items should be as per latest specifications and drawing adopted/Approved by Department)
e-NIT No:EDR/ 76 of 2025-26 Dated 16-12-2025
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description * Bidders are requested to quote the rates for all items which must be inclusive of Supply, Erection, Testing and commissioning of all items including Taxes, Labour charges, Overhead Charges etc. ** Before quoting the rates bidders are requested to visit the site *** Material should be in accordance to latest IS and IEC Standards Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Name of Work:UPGRADATION OF DIVISONAL WORKSHPP AT ED-RAJOURI (DRAIN) 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
2 Eart work in excavation by manual means in all kind of soil 15.12 cum 256.85 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
3 Providing laying in position cement cincerate of 1:5:10 crushed stone agg.All work upto plinth level 1x24x1.05 3.78 cum 4826.25 Excess(+) Full Conversion INR 4 Construction of chamber for 100mm sluice plates item5 10 Nos
4 Providing /Laying in position cement concrete of specified grade & excluding cost of centering and shuttering all work upto plinth level in 1:3:6 with crushed stone agg. 2x24x.3x.45plinth M10 6.48 cum 5733.6 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
5 Providing & Laying 40mm thick cement concrete flooring in 1:2:4 mix Drain:24x.45M10 10.8 cum 510.25 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
6 Centering/Shuttering including shuttering propping etc. and removal of form work for foundation,footing,base of colimns.2x2x24x.45 43.2 cum 286.35 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
7 12mm thick cement plaster in 1:4 mix 2x24x.45 21.6 cum 283.8 Excess(+) Full Conversion INR 4 Construction of chamber for 100mm sluice plates item5 10 Nos
8 Carriage of Sand/Aggragrates by 40km MT 100m Ht/AT 5.31 cum 875.1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
9 Carriage of Aggragrates above (40mm) by an average distance of by 38km MT. 3.36 cum 875.1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
10 Carriage of Aggragrates (20mm) by an average 6.14 cum 875.1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
11 Name of Work:UPGRADATION OF DIVISONAL WORKSHOP AT ED-RAJOURI. (RAMP) 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
12 Eart work in excavation by manual means in all kind of soil 25x7.6x.45=85.61cum 85.61 cum 256.85 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
13 Providing laying in position cement cincerate of 1:5:10 crushed stone agg.All work upto plinth level 25x7.6x.15=28.5 28.5 cum 4826.25 Excess(+) Full Conversion INR 4 Construction of chamber for 100mm sluice plates item5 10 Nos
14 Providing /Laying in position cement concrete of specified grade & excluding cost of centering and shuttering all work upto plinth level in 1:3:6 with crushed stone agg. 25x7.6x.15=28.50plinth M10 28.5 cum 5733.6 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
15 Providing & Laying 40mm thick cement concrete flooring in 1:2:4 mix Drain: 12.5x.7.6=95 95 cum 510.25 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
16 Centering/Shuttering including shuttering propping etc. and removal of form work for foundation,footing,base of colimns.25x7.6x1.05=199 199 cum 286.35 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
17 12mm thick cement plaster in 1:4 mix 2x(5+3.6)x.30=5.16sqm 5.16 sqm 283.8 Excess(+) Full Conversion INR 4 Construction of chamber for 100mm sluice plates item5 10 Nos
18 Carriage of Sand/Aggragrates by 40km MT 100m Ht/AT 55.48 cum 875.1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
19 Carriage of Aggragrates above (40mm) by an average distance of by 38km MT. 25.19 cum 875.1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
20 Carriage of Aggragrates (20mm) by an average 79.46 cum 875.1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
21 Repaiiring of washroom by way of installation 7 fixing of Gyser 30/25ltr complete and fixing of pvc/GI pipes for gyser,valva,tap,washbasin.seat tanky,exhuast fan,repairing of Tiles,painting water pvc Drain pipe,Water tanky 1000ltr capacity & repairing of electrification etc. 1 ls 85000 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
SBD_2025.pdf
Other Document • 0.69 MB
BOQ_967016.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid