Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | UNIQUE SHIP REPAIR AND ENGINEERING WORKS | 5 | ₹39,000 |
| 2 | Schedule 2 | UNIQUE SHIP REPAIR AND ENGINEERING WORKS | 5 | ₹23,150 |
| 3 | Schedule 3 | UNIQUE SHIP REPAIR AND ENGINEERING WORKS | 5 | ₹46,000 |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
28 May 2026, 2:00 pmClosed
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS Vishwast; E 263 DA No 3 Heat exchanger to be removed and pressure tested for finding out of leaking tubes and if tubes found leaking tubes to be blanked as per pro..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS Vishwast; E 264 Leakage observed from FER educator suction pipeline Pipeline to be repaired and proved for satisfactory operation including pressure testing upto 8 ..
and Installation of Plant Systems/Equipments (Version 2) - ICGS Vishwast; E 265 High refrigerant pressure observed on AC condenser No 1 Suspect scale formation in condenser tubes Condenser to be chemical cleaned and proved for s..
9277766
GEM/2026/B/7493582
Two Packet Bid
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS Vishwast; E 2
South Andamans, Andaman And Nicobar Islands
Item wise evaluation
SERVICE
3 documents required · 3 mandatory
1 yrs
₹1 L
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS Vishwast; E 263 DA No 3 Heat exchanger to be removed and pressure tested for finding out of leaking tubes and if tubes found leaking tubes to be blanked as per pro.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS Vishwast; E 264 Leakage observed from FER educator suction pipeline Pipeline to be repaired and proved for satisfactory operation including pressure testing upto 8 .. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS Vishwast; E 265 High refrigerant pressure observed on AC condenser No 1 Suspect scale formation in condenser tubes Condenser to be chemical cleaned and proved for s.. | - | - | - |
Exempted
Yes
28 May 2026
16 May 2026
28 May 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9277766.pdf
GEM_BID • 0.11 MB
1777566206.pdf
GEM_OTHER • 0.25 MB
1778675333.pdf
GEM_OTHER • 0.45 MB
ATC_ac729db7-b45b-4505-a39d1778675410666_EOVISHWAST.pdf
GEM_OTHER • 0.45 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .