| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹76.8 LAdmitted-Finance | -34.00% | ₹76.8 L | L1 | Admitted-Finance |
| 2 | L2₹81.1 L+₹4.4 L (5.70%)Admitted-Finance NOT FOUND | NEW DELHI | DELHI | 110001 | -30.24% | ₹81.1 L+₹4.4 L (5.70%) | L2 | Admitted-Finance |
| 3 | L3₹86.7 L+₹9.9 L (12.9%)Admitted-Finance NOT FOUND | -25.50% | ₹86.7 L+₹9.9 L (12.9%) | L3 | Admitted-Finance |
| 4 | L4₹91.9 L+₹15.1 L (19.7%)Admitted-Finance | -21.00% | ₹91.9 L+₹15.1 L (19.7%) | L4 | Admitted-Finance |
| 5 | L5₹1.0 Cr+₹26.6 L (34.7%)Admitted-Finance 184 SHIV NAGAR COLONY BHANPUR BHOPAL M P | -11.11% | ₹1.0 Cr+₹26.6 L (34.7%) | L5 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
27 May 2026, 5:00 pmClosed
GM (PnC)
Parbati-III Power Station, Behali
Restoration-Protection Work of Dumping Site-3 Tareda
2026_NHPC_903487_1
PR11925-239-1-Restoration Protection Work of Dumping Site-3 Tareda
Open Tender
Civil Works
Works
180 days
Parbati-III Power Station, Behali
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
NHPC LIMITED
₹2.3 L
Yes
29 Aug 2026
29 Apr 2026
1 Jun 2026
29 Apr 2026
27 May 2026
29 Apr 2026
29 Apr 2026 - 9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 664.83 | Cum | 146.33 | ₹97,284.57 |
| 2 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc + PVC coated, Mesh wire diameter 2.7/3.7 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2 mm (ID/OD), supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge | 2,389.07 | Cum | 3,600.71 | ₹86,02,348.24 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 351.21 | Cum | 6,648.45 | ₹23,35,002.12 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc | 1,275.15 | Sqm | 459.08 | ₹5,85,395.86 |
| 5 | U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110 mm dia | 62.6 | Meter | 194.21 | ₹12,157.55 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
PUBLISHTENDERDOCUMENTD3.pdf
Tender Documents • 3.26 MB
NHPCSafetyManual.pdf
Additional Documents • 11.10 MB
BOQ_953294.xls
BOQ • 0.33 MB
corrigendum-1.pdf
PDF • 1.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .