Office of the Executive Engineer, Bhavnagar Irrigation Division, Bhavnagar
Shetrunji Irrigation Scheme - Improvement of Existing VRB At Ch.83615 mt, 84601 mt & 85030 mt. of SLBMC
313435
4 For 2026-27
Open
Civil Works - Water Works
Works
Bhavnagar
7 documents required · 6 mandatory · 1 optional
₹1,500
EXECUTIVE ENGINEER, BHAVNAGAR IRRIGATION DIVISION BHAVNAGAR
₹30,000
11 Jun 2026
11 Jun 2026
11 Jun 2026
25 Jun 2026
11 Jun 2026
e Quantit In
specification and reference to book of Unit Amt.
m y figure
specifications)
ITEM NO.01
Dismantling of RCC work viz. slab, beam, lintel,
barrel, staircase, etc. including removing the steel
1 from the dismantled portion without damage to 34.90 Cum 1362.00
reinforcement sorting and stacking of useful and
unuseful material from the dismantled material as
directed etc comp.
ITEM NO.02
Dismantling stone/brick masonry & stacking of
2 useful and unuseful material from the dismantled 49.30 Cum. 616.00
materials as directed etc complete.
(a) In cement mortar
ITEM NO.03
Excavation in all sort of strata and formations incl.
depositing the unuseful excavated stuff as and
where directed incl sorting and stacking useful
materials as directed upto 30 mt lead etc.
complete incl. dewatering. ( Depth 0 TO 3.0 mt )
(For all type canal & foundation trenches of C.D.
ITEM NO.04
Prov. & Laying in position "NOMINAL MIX' cement
concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C. work
incl. necessary formworks centering scaffolding
compaction by mechanical vibrator,curing as
directed with all lead & lift etc complete FOR
GENERAL PURPOSE
A) Concrete 1:3:6 and MSA-40mm
(cement level 220 kg/cum)
ITEM NO.05
Back filling with appropriate excavated material
behind the structures or refilling the trenches
5 with excavated useful material including watering 18.30 Cum 84.00
ramming, consolidation etc complete with all lead
ITEM NO.06
Prov. & Laying in position "NOMINAL MIX' cement
concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C. work
6 incl. necessary formworks centering scaffolding 30.10 Cum. 3816.00
compaction by mechanical vibrator,curing as
directed with all lead & lift etc complete
FOR GENERAL PURPOSE
C) Concrete 1:2:4 and MSA-40mm
ITEM NO.07
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed
aggregate bymass and machine mix for R.C.C/CC
work including necessary formworks centering
scaffolding compaction bymechanical
vibrator,curing as directedwith all lead& lift etc
complete Excluding the cost of reinforcement FOR
SOLID SLAB OF ROAD BRIDGE , C) Concrete grade
M-25 and MSA-20mm
ITEM NO.08
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed
aggregate by mass and machine mix for R.C.C/CC
work including necessory formworks centering
scaffolding compaction by mechanical
vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement
FOR SOLID SLAB OF ROAD BRIDGE
A) Concrete grade M-20 and MSA-20mm
ITEM NO.09
Providing and laying dry rubble stone pucca
pitching without base , inverted filter and header
stone but with 10 cms thick murrum layer ( for
base ) incl.hand packing and trimming & dressing
slopes etc complete.
c) 30 cms thick stone pitching with pointing in
ITEM NO.10
Providing,cutting,bending,binding and fixing in
position as per drawing .TMT BAR , reinforcement
10 for R.C.C. works and anchor bars incl cost of black 15.40 M.T. 76574.00
annealed 16 to 18 BWG M.S. Wire etc.complete
with all lead and lift.
ITEM NO.11
Providing & filling in contraction joints with
11 12mm thick bitumen sheet of approved quality as 5.60 Sqmt. 702.00
ITEM NO.12
Informatory Signs:-Providing and fixing sing
boards made out of 2mm aluminium sheet; size
x 60cms, rectangle as per the design of IRC-67-
1977 pre treated with phospheting process & acid
teching: coated with one coat of epoxyprimer and
two coats of best quality epoxy paint;
reflectorised with retro reflective sheeting as per
latest M.O.S.T. Specifications; 3.1m long stand
12 postand frame fabricated from suitable sizeiron 1.00 Nos. 3856.90
angle of 35 x 35 x 3mm 75x75x6mm as required;
painted with best qualityepoxy coatings in black
and whitebends. the details of symbol for each
board shall details of symbol for eachboard shall
be as per the instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CC block of size
x45 x 60cms. for each leg. including excavation
curing tec complete under the supervision of
engineerin charge (A) Engineer Grade(VR)...
ITEM NO.13
White washing with lime on wall surface (one
coats) to give an even shade including thoroughly
booming the surface to remove all dirt, dust;
mortar drops and loose scales of lime wash and
other foreign matter.
ITEM NO.14
Type - A, "W" : Metal Beam Crash Barrier
(Providing and erecting a "W" metal
beam crash barrier comprising of 3 mm thick
corrugated sheet metal beam rail,
cm above road/ground level, fixed on ISMC series
channel vertical post, 150 x 75 x
14 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m 10.00 Rmt 3468.34
below ground/road level, all
steel parts and fitments to be galvanised by hot
dip process, all fittings to conform
to IS:1367 and IS:1364, metal beam rail to be fixed
on the vertical post with a spacer
of channel section 150 x 75 x 5 mm, 330 mm long
complete as per clause
ITEM NO.15
Providing Photography and Drone Videography of
the work as per the instruction of engineer in
Item No:-16
Construction of Granular Sub Base (GSB) by
providing Well graded material of grading-II,
16 spreading in uniform layers on prepared surface, 28.70 Cum 677.71
mixing, watering and compacting etc. complete as
per specification or as directed.
ITEM NO.17
Care & diversion of river/creek incl. required
dewatering during construction of earthen dam, 3.00 1%of Estimate
17 C.O.T. and allied works as prescribed and directed
etc. complete.
I/Weam/are willing to carry out the work at… ....................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(A)For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(in words)………………………………………………….………………………………………………...
(C)Net Tendered Amount (A-B) (in figure) ………………………………
(in words)………………………………………………….………………………………………………...
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labor cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
i.e 5449.00 /M.T mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Shetrunji Left Bank Canal Sub Division Bhavnagar Irrigation Division
Talaja Bhavnagar
Signature of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD- Improvement of Existing VRB.pdf
BOQ VRB Koliyak.pdf
Tender Notice No.04 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .