Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VILLAGE BANAS P O JAON TEHSIL ANNI DISTT KULLU HP | SHIMLA | HIMACHAL PRADESH | 172001 | Admitted-Finance |
| 2 | Admitted-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹56.0 L
EMD Value
₹88,550
Closing Date
17 Jul 2023, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH ROFD between Km. 0.000 to 5.500 and C.O R.wall in wire crate and PCC at various RD between Km. 0.000 to 5.550
2023_PWD_76091_1
PW/RMP/TA/2023-3642-44 dated 10.07.2023
Open Tender
Civil Works - Roads
Item Rate
EE B and R Division HPPWD Rampur
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,000
Yes
EE Rampur
₹88,550
Yes
8 Aug 2023
11 Jul 2023
17 Jul 2023
11 Jul 2023
17 Jul 2023
11 Jul 2023
11 Jul 2023 - 17 Jul 2023
Amount
Excavation in earthwork in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification clause 1603.1 & 1603.2 to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal and dumping to be arranged by the contractor of unsuitable cut materials in specified manner , trimming, filling of unevenness, blindage and finishing of the road to specified dimensions or as directed by the Engineer-in charge for smooth riding. The recovery for useful stones, for 1829.06 (One Thousand Eight Hundred Twenty Nine Point Zero Six) cum. @ Rupees 300/= only (Rupees three hundred only) per cubic metre shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases.
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Excavation for structures:- Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone 40mm agregate nominal size) for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803, 1202 and 1203.including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
P/L cement concrete 1:4:8 (1 cement :4 sand :8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in breast and R/wall etc. including carriage with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge.
Providing weep holes in brick masonry/stone masonry/plin reinforced concrete abutment, wing wall, return wall with 100mm dia PVC Pipe extending thourgh the full width of the structure with stop of 1 (V) 20 (H) toward drawing face complete as per drawing face complete as per drawing and technical specification s clauses 614, 709, 1204.3.7 including haulage of material with in all leads and lifts and as per direction of Engineer-in-charge.
Providing and laying of boulder apron laid in wire crates with 4mm dia G.I. wire conforming to IS:280 and IS: 4826 in 100mmx100mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25Kg each as per drawing and technical specifications Clause 1301 including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 in a width of 600mm including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
contractor
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .