Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.9 LAdmitted-Finance | -21.77% | ₹32.9 L | L1 | Admitted-Finance |
| 2 | L2₹33.6 L+₹74,435.37 (2.26%)Admitted-Finance | -20.00% | ₹33.6 L+₹74,435.37 (2.26%) | L2 | Admitted-Finance |
| 3 | L3₹35.7 L+₹2.8 L (8.65%)Admitted-Finance | -15.00% | ₹35.7 L+₹2.8 L (8.65%) | L3 | Admitted-Finance |
| 4 | L4₹41.6 L+₹8.7 L (26.4%)Admitted-Finance | -1.10% | ₹41.6 L+₹8.7 L (26.4%) | L4 | Admitted-Finance |
| 5 | L5₹41.9 L+₹9.0 L (27.4%)Admitted-Finance | -0.30% | ₹41.9 L+₹9.0 L (27.4%) | L5 | Admitted-Finance |
Tender Value
₹42.0 L
EMD Value
₹84,100
Closing Date
24 Jul 2026, 4:00 pmClosed
Executive Engineer
Kotranka
Road from Renthe to Jamia Masjid Hr. Sec. School Prori Gujjaran (2nd call)
2026_PWDJK_316046_8
NIT No. 17 of 2026-27 dated 14.07.2026
Open Tender
Civil Works
Percentage
Kotranka
Please refer Tender documents.
4 documents required · 4 mandatory
₹600
Executive Engineer PWD RnB Division Kotranka
₹84,100
1 Aug 2026
14 Jul 2026
25 Jul 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:AKS | 232 | Cum | 256.85 | ₹59,589.2 |
| 2 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 900 | Cum | 153 | ₹1,37,700 |
| 3 | Supplying,Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.53mm to 22.4mm | 135 | Cum | 2,237.21 | ₹3,02,023.35 |
| 4 | Providing and laying in position cement concrete of 1:4:8 mix including curing but excluding the cost of centring and shuttering. All work upto plinth level. | 159 | Cum | 5,202.9 | ₹8,27,261.1 |
| 5 | Providing and laying in position cement concrete of 1:3:6 mix including curing but excluding the cost of centring and shuttering. All work upto plinth level. | 108 | Cum | 5,733.6 | ₹6,19,228.8 |
| 6 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory
compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 16.94.1 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern | 900 | Sqm | 929.85 | ₹8,36,865 |
| 7 | Providing and laying in position cement concrete of 1:3:6 mix including curing but excluding the cost of centring and shuttering. All work upto plinth level. With 20% boulders | 95 | Cum | 4,774.46 | ₹4,53,573.7 |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 40mm | 50 | Sqm | 510.25 | ₹25,512.5 |
| 9 | Providing and Laying hand packed stone filling NSI | 60 | Cum | 937.9 | ₹56,274 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 440 | Sqm | 286.35 | ₹1,25,994 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_1028362.xls
BOQ • 0.30 MB
corrigendu.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .