Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 55 SURYA SEN STREET ROOM NO 307 KOLKATA 700009 | KOLKATA | WEST BENGAL | 700009 | ₹1.0 Cr | L1 | Accepted-AOC The Agency is lowest quoted amount. |
| 2 | L2₹1.2 Cr+₹15.3 L (14.6%)Rejected-Finance | ₹1.2 Cr+₹15.3 L (14.6%) | L2 | Rejected-Finance The bidder is L2 |
| 3 | L3₹1.5 Cr+₹43.7 L (41.6%)Rejected-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹1.5 Cr+₹43.7 L (41.6%) | L3 | Rejected-Finance The bidder is L3 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
23 Jul 2020, 6:00 pmClosed
AGME E IV
NSCBI Airport Kolkata
RMO other Electrical and Mechanical Installations at NSCBI Airport Kolkata during 2020 2022 O and M of Lagoons and CMC of IRP STP Lagoons Colony Electrical Installations etc First Re Call
2020_AAI_52426_1
AAC/EMD-II/Lagoon/NIT
Open Tender
Electrical Works
Works
730 days
NSCBI Airport Kolkata
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,120
Airports Authority Of India
₹3.2 L
3 Jun 2022
10 Jul 2020
31 Jul 2020
11 Jul 2020
23 Jul 2020
11 Jul 2020
11 Jul 2020 - 14 Jul 2020
Amount
Package-A;-(AMC & Comprehensive Maintainance of Lagoons) Operation & periodical maintainance of self priming diesel operated pumps units of Lagoon No. 1 & 2 having discharge capacity of 1000 Cumtr/Hr involving operations, repairs and maintenance, attending to complaints / faults / breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the systems, carrying-out preventive maintenance, maintenance of records / documents etc by providing manpower in three shift including Sundays and holidays as per tender specifications, terms & conditions.
1st Year
2nd Year
Operation of Self priming centrifugal pumps units having discharge capacity of 800 Cumtr/Hr installed at Lagoon- 4 /watch tower no-2 pump room in one shift with 8 hours per shift by proving one operator (skilled) as on required as per the instruction of Engg-in- Charge.
1st Year
2nd Year
Periodical preventive maintenance of 7 Nos 38 HP deisel engine installed in operational area by OEM's i. e M/s Kirloskar i/c visit as on when required basis , attending breakdown maintenance calls (excluding spares ) and submission of service report etc. complete required.
1st Year
2nd Year
Breakdown maintainance/ overhauling charges of 38 HP deisel engine by OEM i.e M/s Kirloskar but excluding spares as on when required as per instructions of Engg-in-Charge.
1st Year
2nd Year
Breakdown maintainance/ overhauling charges but of 38 HP pump model no-APM 350/40 by OEM i.e M/s Kirloskar but excluding spares as on when required as per instructions of Engg-in-Charge.
1st Year
2nd Year
Supply of following spares suitable for 38 HP Kirloskar make pump motor set with model no-APM 350/40for as on when required as per instructions of Engg-in-Charge.(1st Year)
Vaccum Unit (Part No -SYSYEMPP1)
Set of Filter for auto priming vaccum unit
Pump Shaft (Part No-180)
Supply of following spares suitable for 38 HP Kirloskar make pump motor set with model no-APM 350/40for as on when required as per instructions of Engg-in-Charge.(2nd Year)
Vaccum Unit (Part No -SYSYEMPP1)
Set of Filter for auto priming vaccum unit
Pump Shaft (Part No-180)
Package-B;-( Comprehensive Maintainance of IRP & Borewells) Complete re-winding/repairing of burnt out 3 Phase 40 HP Pump induction motor of following capacity by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper.
1st Year
2nd Year
Complete re-winding/repairing of burnt out 3 Phase 30 HP Pump induction motor of following capacity by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper.
1st Year
2nd Year
Complete re-winding/repairing of burnt out 3 Phase 20 HP Pump induction Motors of following capacity by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper.
1st Year
2nd Year
Complete repairing/rectification of 3 Phase 40 HP Pump centrifugal pump of following capacity by providing/replacement of necessary spares and lathe works as per site requirement and condition etc.complete as required.
1st Year
2nd Year
Complete repairing/rectification of 3 Phase 30 HP Pump centrifugal pump of following capacity by providing/replacement of necessary spares and lathe works as per site requirement and condition etc.complete as required.
1st Year
2nd Year
Complete repairing/rectification of 3 Phase 20 HP centrifugal pump of following capacity by providing/replacement of necessary spares and lathe works as per site requirement and condition etc.complete as required.
1st Year
2nd Year
Lowering and lifting of following capacity submersible pump motors set from existing deep tube well i/c dismentalling and reinstalltion of the same etc. complete . as required. a) 15 HP to 30 HP
1st Year
2nd Year
Lowering and lifting of following capacity submersible pump motors set from existing deep tube well i/c dismentalling and reinstalltion of the same etc. complete . as required. b) 10 HP to 12.5 HP
1st Year
2nd Year
Lowering and lifting of following capacity submersible pump motors set from existing deep tube well i/c dismentalling and reinstalltion of the same etc. complete . as required. c) 2 HP to 7.5 HP
1st Year
2nd Year
Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. a) 25 HP
1st Year
2nd Year
Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. a) 20 HP
1st Year
2nd Year
Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. b) 15 HP
1st Year
2nd Year
Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. c) 12.5 HP
1st Year
2nd Year
Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. d) 10 HP
1st Year
2nd Year
Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. e) 7.5 HP
1st Year
2nd Year
Dismantling the damaged Sub-mersible pump-motor and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. f) 2 to 5 HP
1st Year
2nd Year
Dismantling complete overhauling, repairing, remetaling, machining, balancing of impeller, shaft, housing cover etc. for following capacity Booster pump painting and reassembling etc. a) 40 HP
1st Year
2nd Year
Dismantling complete overhauling, repairing, remetaling, machining, balancing of impeller, shaft, housing cover etc. for following capacity Booster pump painting and reassembling etc. a) 30HP
1st Year
2nd Year
Dismantling complete overhauling, repairing, remetaling, machining, balancing of impeller, shaft, housing cover etc. for following capacity Booster pump painting and reassembling etc. b) 20 HP
1st Year
2nd Year
Replacement of pump shaft i/c metaling machining of impeller, housing cover etc. as reqd., for the following pumps: a) 40 HP
1st Year
2nd Year
Replacement of pump shaft i/c metaling machining of impeller, housing cover etc. as reqd., for the following pumps: a) 30 HP
1st Year
2nd Year
Replacement of pump shaft i/c metaling machining of impeller, housing cover etc. as reqd., for the following pumps: b) 20 HP
1st Year
2nd Year
Complete re-winding of burnt out following capacity motor suitable for Air Blower meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 5 HP
1st Year
2nd Year
Complete re-winding of burnt out following capacity motor suitable for Air Blower meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 1.5 HP
1st Year
2nd Year
Complete re-winding of burnt out following capacity motor suitable for Air Compressor meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 10HP to 12.5HP
1st Year
2nd Year
Complete re-winding of burnt out following capacity motor suitable for Air Compressor meant for IRP plant of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 7.5HP
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of the following size gate valve suitable for water pipe line i/c providing necessary accessories (if required) complete as reqd. a) 6 inch dia Gate Valve
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of the following size gate valve suitable for water pipe line i/c providing necessary accessories (if required) complete as reqd. a) 5 inch dia Gate Valve
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of the following size gate valve suitable for water pipe line i/c providing necessary accessories (if required) complete as reqd. b) 4 inch dia Gate Valve
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of the following size gate valve suitable for water pipe line i/c providing necessary accessories (if required) complete as reqd. c) 3 inch dia Gate valve.
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of the following size butterfly valve suitable for water pipe line i/c providing necessary accessories (if required) complete as reqd. a) 6 inch dia Butterfly Valve
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of the following size butterfly valve suitable for water pipe line i/c providing necessary accessories (if required) complete as reqd. b) 5 inch dia butterfly valve
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of the following size butterfly valve suitable for water pipe line i/c providing necessary accessories (if required) complete as reqd. c) 4 inch dia butterfly valve
1st Year
2nd Year
Complete dismantling, Repairing, Overhauling and re-installation of all damage Gate valve and Non-retun valve for various boewell of Submarsible pump and Booster pump of IRP i/c providing necessary accessories (if required) complete as reqd. d) 3 inch dia butterfly valve
1st Year
2nd Year
Rectification of borewell star-delta/DOL starter panel by replacing the following spares as on required basis and as per the instruction of Engg-in-Charge etc. complete as required.(1st Year)
a) 4P MNX-40/MNX-50 Power Contactor
b) 4P ML-2/ML-3 Power Contactor
c) ML-2/ML-3 relay
d) Timer switch suitable to site requirement.
e) Over load relay as suitable to site requirement.
f) Rotary Switch as suitable to site requirement
g) 3 Phase Ammeter as suitable to site requirement.
h) 3 Voltmeter as suitable to site requirement.
Rectification of borewell star-delta/DOL starter panel by replacing the following spares as on required basis and as per the instruction of Engg-in-Charge etc. complete as required.(2nd Year)
a) 4P MNX-40/MNX-50 Power Contactor
b) ML-2/ML-3 Power Contactor
c) ML-2/ML-3 relay
d) Timer switch as suitable to site requirement.
e) Over load relay as suitable to site requirement.
f) Rotary Switch as suitable to site requirement
g) 3 Phase Ammeter as suitable to site requirement.
h) 3 Voltmeter as suitable to site requirement.
PACKAGE - C (Comprehensive maintenance of STP) Dismantling the damaged Sub-mersible pump-motor suitable for raw sewage and Complete rewinding and overhauling of following rated Sub-mersible motor set i/c varnishing of drive motor winding, cleaning, discaling of pumps, change of all bearings, re-assembling the set and painting with synthetic enamel painting testing commissioning etc. as reqd. a) 12.5 HP
1st Year
2nd Year
Complete re-winding of burnt out Motors for following capacity suitable for raw sewage ariation tank by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 25 HP
1st Year
2nd Year
Complete re-winding and overhauling of burnt out Raw Sewage Centrifugal pump motor set for following capacity of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 20 HP Pump
1st Year
2nd Year
Complete re-winding and overhauling of burnt out Raw Sewage Centrifugal pump motor set for following capacity of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 10 HP Pump
1st Year
2nd Year
Complete re-winding and overhauling of burnt out Raw Sewage Centrifugal pump motor set for following capacity of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 7.5 HP Pump
1st Year
2nd Year
Complete re-winding and overhauling of burnt out Raw Sewage Centrifugal pump motor set for following capacity of by providing new super enamel coated copper wire with heat varnishing, backing, fitting etc. as reqd. for the following capacity of motors i/c less credit for the burnt copper. a) 5 HP Pump
1st Year
2nd Year
Dewatering of sewage water from scrapper unit, screen chamber, Areator chamber, wet well of filter pump, inlet chamber of raw sewage pump house etc as required.
1st Year
2nd Year
Removal of sludge from drying bed, scrapper chamber, Aerator chamber, wet well of filtrate pump, inlet chamber of raw sewage pump house etc as required.
1st Year
2nd Year
Filling of filler media (sand) of different size in drying bed etc as required. a) Fine sand
1st Year
2nd Year
Filling of filler media (sand) of different size in drying bed etc as required. b) Course sand
1st Year
2nd Year
Dismantling the damage cage portion of the scraper unit and fabricating the same with MS angle of size 75mm X 75mm X 10mm, MS plate of size 6000mm X 250mm X 10mm and MS strip of size 30mm X 5mm X 100mm by welding i/c supply & fixing of special type neoprine rubber, Nut, Bolt and Washer etc as required.
1st Year
2nd Year
Supply & Fixing of 150mm dia double flanged butterfly valve (KIRLOSKAR/AAI approved make) to the discharge line of drying beds etc as required.
1st Year
2nd Year
Supply & Fixing of 200mm dia double flanged butterfly valve (KIRLOSKAR/AAI approved make) to the discharge line of drying beds etc as required.
1st Year
2nd Year
Package-D (Comprehensive Maintainance of Colony) Disconnecting,dismantling & removing of different sizes of burnt-out/defective fans from existing location and then rewinding with suitable size of super enamelled copper wire, varnishining,baking & re-assembling the fan i/c painting the fan,overhauling, re-installation,testing etc. i/c replacement of G. M Bush,Ball Bearing, complete as required.
i) 12" to 18" sweep, AC 230 V Exhaust Fan
1st Year
2nd Year
ii) 48"/56" sweep, AC 230 V ceiling fan
1st Year
2nd Year
iii) 12" to 18" sweep, AC 230 V Exhaust Fan i/c replacement of Static Shaft.
1st Year
2nd Year
iv) 48"/56" sweep, AC 230 V ceiling fan i/c replacement Static Shaft.
1st Year
2nd Year
Replacement of old resistance type defective ragulator by new ragulator as per requirment.
1st Year
2nd Year
Reparing of existing Gysers of different capacity by replacing the following with new spare i/c dismantaling, re-installtion, disconnection & re-connection of power supply i/c testing, commissioning etc complete as required.
i) Heating element
1st Year
2nd Year
ii) Thermostat
1st Year
2nd Year
iii) Indicator lamp
1st Year
2nd Year
iv) Connecting tube
1st Year
2nd Year
The execution of Delhi Schedule of Rates (E&M) 2018 of estimated amount of Rs 1,00,000.00 Items mentioned in Chapter 1 to Chapter 17 including Appendix-I & II as when required basis for repair/maintenance/ addition / alteration etc.of internal and External Electrical installations. [Quoting in the Rate 10% below the Estimated amount of Rs 1,50,000.00 means amount will be Rs.1,35,000/-. Similarly Quoting in the Rate 10% above the Estimated amount of Rs 1,00,000.00 means amount will be Rs. 1,65,000/- (Note: Payment of DSR rate will be made after deduction of GST considered in the Rate of DSR-2018) (For 1st Year)
The execution of Delhi Schedule of Rates (E&M) 2018 of estimated amount of Rs 1,00,000.00 Items mentioned in Chapter 1 to Chapter 17 including Appendix-I & II as when required basis for repair/maintenance/ addition / alteration etc.of internal and External Electrical installations. [Quoting in the Rate 10% below the Estimated amount of Rs 1,60,000.00 means amount will be Rs.1.34,,000/-. Similarly Quoting in the Rate 10% above the Estimated amount of Rs 1,00,000.00 means amount will be Rs. 1,,66,000/- (Note: Payment of DSR rate will be made after deduction of GST considered in the Rate of DSR-2018) (For 2nd Year)
SOM ENGINEERING WORKS
Sterling And Wilson Pvt. Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .