| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.3 L+₹21,614.16 (1.08%)Rejected-AOC ARADHANA KOLAM PANMANA P O KOLLAM | PATHANAMTHITTA | KERALA | 689694 | L2 | Rejected-AOC L2 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
12 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/o The Executive Engineer Irrigation Division, Kollam
FD-Protecting the eroded R/B of Chaliyakara River near Valliyaiyam in Piravanthoor Panchayath
2022_Irrig_504593_1
IRR/IA/TR/3262/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Valliyaiyam in Piravanthoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
12 Oct 2022
23 Aug 2022
15 Sept 2022
23 Aug 2022
12 Sept 2022
23 Aug 2022
60 days
Amount
detail estimate
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
RAMACHANDRAN J
Bidder Name
M R PUSHPAKUMAR
RAMACHANDRAN J
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_722734.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .