| 1 | L1₹1.6 LAdmitted-Finance SINGH MAHKAR VILLAGE ANTWARA TEHSIL KHATAULI KHATAULI KHATAULI MUZAFFARNAGAR UTTAR PRADESH 251201 | MUZAFFARNAGAR | UTTAR PRADESH | 251201 | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | ₹1.7 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | ₹1.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S.K. CONTRACTOR AND SUPPLIER L3 | M/S SHAURYA TRADERS L2 | VGS ELECTRIC POWER L1 |
|---|---|---|---|---|---|---|
| 1.00Replacement of Damage 145 KV PT installed on 132KV Bays at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi, 132kv S/S Oyal & 132KV S/S Dhaurahra under ETD-Lakhimpur along with cost of men, misc. consumables, crane T&P etc. required for satisfactory compleion of work with all due care of safety and precautions as per technical specifications and direction of supervising engineer as per details Below. | ||||||
| 1.10Dismantling of Damage 145 KV PT installed on 132KV Bays at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi & 132KV S/S Dhaurahra under ETD-Lakhimpur. The works includes opening of jumpers, disconnecting of base nut and bolts etc. | ||||||
| 1.12 | 132 KV PT/CVT | 12 | JOB | 3,665 ₹43,980 | 3,645 ₹43,740 | 4,550 ₹54,600 |
| 1.20Erection of new 145 KV PT on 132KV Bays at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi, & 132KV S/S Dhaurahra under ETD-Lakhimpur The work includes shifting of new PT/CVT from S/S store to work site, unpacking and erection of the same on the existing structure with the help of crane. Modification of existing base if required, shall be included in the scope of work Proper earthing with MS Flats has to be ensured The work also includes connection and termination of jumpers with proper tightening of clamps and connectors and also Cable termination of protection and metering cables from PT to PT-JB including laying of new cables as per requirement. | ||||||
| 1.21 | 132 KV PT/CVT | 12 | JOB | 4,465 ₹53,580 | 4,350 ₹52,200 | 4,550 ₹54,600 |
| 2.00Replacement of Damage 33KV VCB, 145 KV CT, installed on 132KV & 33KV Bay at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi & 132KV S/S Dhaurahra under ETD-Lakhimpur along with cost of men, misc. consumables, crane T&P etc. required for satisfactory compleion of work with all due care of safety and precautions as per technical specifications and direction of supervising engineer as per details Below. | ||||||
| 2.10Dismantling of following equipment by opening of Nuts & Bolts, Jumper, Cable Connection, earthing & shifting up to Store/designated place in the switchyard as per direction of Engineer Encharge | ||||||
| 2.11 | 132KV CT 800/400/200/1A | 4 | JOB | 1,325 ₹5,300 | 1,210 ₹4,840 | 4,550 ₹18,200 |
| 2.12 | 33KV Circuit Breaker | 2 | JOB | 12,895 ₹25,790 | 12,550 ₹25,100 | 4,550 ₹9,100 |
| 2.20Erection of following equipment as per instruction manual of various equipment & technical specifcation including shifting of material from Central/Substation Store to erection site including all assoriated work to complete the job satisfactorily | ||||||
Tender Value
₹1.7 L
EMD Value
₹2,000
Closing Date
22 May 2026, 12:00 pmClosed
EE ETD Lakhimpur
132 kv upptcl power house lakhimpur kheri beside chaucch canal.
Attending Breakdown and Replacement of Various Type of PT CVT CT CB Circuit Breaker at 132KV SS Lakhimpur 132KV SS Gola 132KV SS Mohammadi and 132KV SS Dhaurahra of ETSD Ist under ETD Lakhimpur
2026_UPTCL_1146267_1
E-Tender No-01/ETD(LMP)/2026-27
Open Tender
Electrical Works
365 days
Lakhimpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No. 105405012212 IFSC Code No. ICIC0001054
₹2,000
Yes
29 May 2026
7 May 2026
22 May 2026
7 May 2026
22 May 2026
7 May 2026
7 May 2026 - 22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Replacement of Damage 145 KV PT installed on 132KV Bays at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi, 132kv S/S Oyal & 132KV S/S Dhaurahra under ETD-Lakhimpur along with cost of men, misc. consumables, crane T&P etc. required for satisfactory compleion of work with all due care of safety and precautions as per technical specifications and direction of supervising engineer as per details Below. | ||||||
| 1.1 | Dismantling of Damage 145 KV PT installed on 132KV Bays at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi & 132KV S/S Dhaurahra under ETD-Lakhimpur. The works includes opening of jumpers, disconnecting of base nut and bolts etc. | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 1.12 | 132 KV PT/CVT | - | JOB | 100 | - | BI01010001010000000000000515BI0100001114 |
| 1.2 | Erection of new 145 KV PT on 132KV Bays at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi, & 132KV S/S Dhaurahra under ETD-Lakhimpur The work includes shifting of new PT/CVT from S/S store to work site, unpacking and erection of the same on the existing structure with the help of crane. Modification of existing base if required, shall be included in the scope of work Proper earthing with MS Flats has to be ensured The work also includes connection and termination of jumpers with proper tightening of clamps and connectors and also Cable termination of protection and metering cables from PT to PT-JB including laying of new cables as per requirement. | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 1.21 | 132 KV PT/CVT | - | JOB | 10 | - | BI01010001010000000000000515BI0100001117 |
| 2Replacement of Damage 33KV VCB, 145 KV CT, installed on 132KV & 33KV Bay at 132KV S/S Lakhimpur, 132KV S/S Gola, 132KV S/S Mohammadi & 132KV S/S Dhaurahra under ETD-Lakhimpur along with cost of men, misc. consumables, crane T&P etc. required for satisfactory compleion of work with all due care of safety and precautions as per technical specifications and direction of supervising engineer as per details Below. | ||||||
| 2.1 | Dismantling of following equipment by opening of Nuts & Bolts, Jumper, Cable Connection, earthing & shifting up to Store/designated place in the switchyard as per direction of Engineer Encharge | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2.11 | 132KV CT 800/400/200/1A | - | JOB | 10 | - | BI01010001010000000000000515BI0100001120 |
| 2.12 | 33KV Circuit Breaker | - | JOB | 10 | - | BI01010001010000000000000515BI0100001121 |
| 2.2 | Erection of following equipment as per instruction manual of various equipment & technical specifcation including shifting of material from Central/Substation Store to erection site including all assoriated work to complete the job satisfactorily | - | - | - | - | BI01010001010000000000000515BI0100001124 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
T01202627TenderformandPQR.pdf
Tender Documents • 3.35 MB
BOQ_2143581.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid