| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC Accepted vide order no .4/ET/AEE/KIP/PLR 2024-25 | |
| 2 | L2₹2.8 L+₹17,175 (6.55%)Rejected-Finance | L2 | Rejected-Finance Higher rate and hence not admitted |
Tender Value
₹3.1 L
EMD Value
₹7,805
Closing Date
29 Oct 2024, 5:00 pmClosed
SUSHA S
The Assistant Executive Engineer, KIP(LB)Subdivision No.1,Punalur
GENERAL-Annual maintenance of canals 2024-25-KIP-RB- RBMC from ch 34320m to 43000m and Enadimangalam distributory from Ch 0m to 6480m Elamannoor -maroor distributory from Ch 0m to 1435m during water distribution for the year 2024-25-General Civil Wor
2024_Irrig_698434_1
4/ET/AEE/KIP/PLR 2024-25
Open Tender
Civil Works - Canal
Item Rate
240 days
Enadimangalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹690
Yes
₹7,805
Yes
3 Feb 2025
21 Oct 2024
2 Nov 2024
21 Oct 2024
29 Oct 2024
21 Oct 2024
Amount
Annual maintenance of canals 2024-25-KIP-RB-Enadimangalam distributory from Ch 0m to 6480m Elamannoor -maroor distributory from Ch 0m to 1435m during water distribution for the year 2024-25-General Civil Work
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD730/2024-2025:Engaging man mazdoor for removal of floating materials waste and other debrises from the canal during water distribution, all as directed by Engineer in charge.
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
JAYAMON JOSEPH
Bidder Name
GEO THOMAS
JAYAMON JOSEPH
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .