Loading…
Loading…
Tender Value
₹5.6 Cr
EMD Value
₹11.3 L
Closing Date
10 Aug 2026, 4:00 pm
Dy. Comdt.(Er.)
Office of the DIG SHQ SSB Muzaffarpur
Construction of permanent building at BOP Jankinagar of 48th Bn, SSB, Jaynagar under SHQ Muzaffarpur
2026_SSB_919093_1
45/2026-27/SHQ MZPR
Open Tender
Construction Works
Percentage
365 days
BOP Jankinagar
please refer tender doc
2 documents required · 2 mandatory
₹0
₹11.3 L
SHQ SSB Muzaffarpur
27 Jul 2026
27 Jul 2026
12 Aug 2026
28 Jul 2026
10 Aug 2026
1 Aug 2026
29 Jul 2026 - 29 Jul 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | .Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 357.08 | CUM | 296.33 | ₹1,05,813.52 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 267.81 | CUM | 223.13 | ₹59,756.45 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.All kinds of soil | 73.63 | CUM | 144.35 | ₹10,628.49 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming,consolidating and dressing complete. | 35.01 | CUM | 2,417.7 | ₹84,643.68 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 132.46 | CUM | 797.46 | ₹1,05,631.55 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.72 | CUM | 10,297.77 | ₹1,51,583.17 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zoneIII)derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 85.56 | CUM | 7,754.85 | ₹6,63,504.97 |
| 8 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 43.93 | SQM | 467.72 | ₹20,546.94 |
| 9 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. | 12 | per 50kg cement | 20.66 | ₹247.92 |
| 10 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 43.93 | SQM | 166.38 | ₹7,309.07 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.01 MB
BOQ_965856.xls
BOQ • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].