Tender Value
₹42.2 L
EMD Value
₹50,000
Closing Date
28 May 2026, 3:00 pmClosed
Executive Engineer
Transmission Division Kazhakuttom
Extension and maintenance of control building at 33kV Substation Kadakkal
2026_KSEB_849956_1
1/EE/TDP/Kadakkal/26-27
Open Tender
Civil Works - Buildings
Percentage
150 days
33kV substation Kadakkal
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,900
₹50,000
10 Sept 2026
13 May 2026
2 Jun 2026
13 May 2026
28 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead: Of area 3 sq. metres and below | - | No | 379.56 | - |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead: of area beyond 3 sq. metres | - | No | 519.85 | - |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | m2 | 56.51 | - |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metresIn cement mortar. | - | m3 | 2,129.84 | - |
| 5 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- harges: | 1 | m3 | 2,542 | ₹2,539.46 |
| 6 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | m2 | 75.87 | - |
| 7 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.{ Total excluding CPOH and Cost index) | - | m3 | 3,671.89 | - |
| 8 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | m2 | 136.23 | - |
| 9 | Providing additional support to existing portion of the control room by propping with jack struts of suitable height / length,providing necessary planks at the ends including all charges for transpoting erection in position and dismantling after the expiry of the period decided by the engineer in charge ( Hire and labour charges only) | - | No | 614.11 | - |
| 10 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m | - | m3 | 359.72 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tenderdoc.pdf
Tender Documents • 1.69 MB
BOQ_1436387.xls
BOQ • 0.39 MB
corrigendumIII.pdf
PDF • 0.26 MB
Corrigendum-2.pdf
PDF • 0.09 MB
corrigendum.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .