| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.7 LAccepted-Finance 6 | ₹60.7 L | L1 | Accepted-Finance Quoted L1 Rate |
| 2 | L2₹65.6 LRejected-Finance AGR ILLAM NO 5 LINGAM NAGAR KULUMANI ROAD WORAIYUR TRICHY 620003 | TIRUCHIRAPPALLI | TAMIL NADU | 620003 | ₹65.6 L | L2 | Rejected-Finance Quoted L2 Rate |
| Sl No | Description | Qty | Unit | G R AND SONS L2 | P BALASUBRAMANIAN L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening to the Road from Karumalai to D.Puthupatty Road KM 0/0-1/500 (R-84) VPR. Clearing the light jungle including al labour charges for cutting, burring, buried etc. complete. | 1,560 | Sqm | 6.5 ₹10,140 | 5.9 ₹9,204 |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 2,106 | Cum | 150 ₹3.2 L | 131.2 ₹2.8 L |
| 3.00 | Picking 5 cm to 10 cm old Metalled surface and Sectioning 1 Sq.m | 1,625 | Sqm | 30 ₹48,750 | 21.6 ₹35,100 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 150 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 731.25 | Cum | 2,800 ₹20.5 L | 2,564.3 ₹18.8 L |
| 5.00 | Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 4,875 | Cum | 25 ₹1.2 L | 19.7 ₹96,037.50 |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it. | 4,875 | Cum | 100 ₹4.9 L | 83.4 ₹4.1 L |
| 7.00 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 146.25 | Cum | 12,500 ₹18.3 L | 12,045 ₹17.6 L |
| 8.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0 -1/0 | 144 | Cum | 350 ₹50,400 | 336 ₹48,384 |
| 9.00 | KM 1/00-1/500 | 90 | Cum | 400 ₹36,000 | 349.7 ₹31,473 |
| 10.00 | Cautionary Sign Board | 2 | Nos | 5,500 ₹11,000 | 4,999 ₹9,998 |
Tender Value
₹64.6 L
EMD Value
₹65,000
Closing Date
4 Jul 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
strengthening the road from Karumalai to D. Pudupatty Road,Marungapuri Block,Tiruchirappalli District under NABARD XXXI 2025-26,Pkg30
2025_RDTN_567880_30
DIPR/2866/Tender/2025 dt 06.06.2025
Open Tender
Civil Works - Roads
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹65,000
DRDA Tiruchirappalli
7 May 2026
14 Jun 2025
4 Jul 2025
14 Jun 2025
4 Jul 2025
14 Jun 2025
17 Jun 2025
Amount
Strengthening to the Road from Karumalai to D.Puthupatty Road KM 0/0-1/500 (R-84) VPR. Clearing the light jungle including al labour charges for cutting, burring, buried etc. complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking 5 cm to 10 cm old Metalled surface and Sectioning 1 Sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 150 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0 -1/0
Cautionary Sign Board
60 Cm Equilateral Triangle Cautionary SignBoard
60 Cm Circle Mandatory Sign
Chevron Sign 90 Cm Octogon (Curves)
Reflector (Near Culvert & Trees) - Star Sign Sticker
HM Stone
KM Stone
Road Marker/ Road Stud With Lens Reflector
Towards the charges for routline maintenance of the road work executed under NABARD XXXI including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
G R AND SONS (BID ID -1389593)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.86 MB
TechBid30.pdf
Tender Documents • 0.77 MB
BOQ_679875.xls
BOQ • 0.24 MB
PriceBid30.pdf
Additional Documents • 0.29 MB
Download all tender documents and submit your bid