Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.5 LAdmitted-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | L1 | Admitted-Finance | |
| 2 | L2₹44.8 L+₹8.3 L (22.8%)Admitted-Finance V P O TEHSIL JAWALAMUKHI DISTT KANGARA HP | L2 | Admitted-Finance | |
| 3 | Rejected-Technical VILLAGE PO AND TEHSIL DEHRA DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | - | Rejected-Technical Contractor Registration class eligibility and Non submission ITR and turnover | |
| 4 | Rejected-Technical | - | Rejected-Technical Contractor Registration class eligibility and work experience |
| Sl No | Description | Qty | Unit | Vijay kumar kushwaha L2 | sanjeev kumar L1 |
|---|---|---|---|---|---|
| 1.01 | Exacation in foundation trtenches etc. lift up to 1.5 mtrs. Stacking the excaveted soil not mote then 3 mtrs clear from the edge of the excavtion and the returining the stacked soil in 15cm layers when required into plinth sides of foundation etc. consloidating eaach deposited layers by ramming and watering and then disposing of all surplus excaveted earth with in all leads and lifts. Pick works 10%, Jumper work 40 % & Chiesslling work in soft rock& Hard rock 50% | 319.26 | Cum | 1,299 ₹4,14,718.74 | 751 ₹2,39,764.26 Lowest |
| 2.01 | Providing & Laying cement Concrete 1:4:8 (1 Cement : 4 Sand : 8 graded Stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth level | 31.98 | Cum | 5,299 ₹1,69,462.02 | 4,650 ₹1,48,707 Lowest |
| 3.01 | Providing form work with steel plates 3.15 mm thick welded iron in frame 30x30x5 mm So as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies , height of proping and centring below supporting floor to celling not exceeding 4 mtr. and removal of the same for insitu- reinforced concerte and plain concrete work in: vertical surface such as walls of any thickness partion and the like including attached pilasterrs buttresses, plinth and string courses and the like | 903.3 | Sqm | 380 ₹3,43,254 | 250 ₹2,25,825 Lowest |
| 4.01 | Edges of slabs and breaks in floors and walls : under 20 cm wide | 85.75 | Rmt | 105 ₹9,003.75 | 90 ₹7,717.5 Lowest |
| 5.01 | Providing & Laying cement Concrete 1:1.5:3 (1 Cement : 1.5 Sand : 3 graded Stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work reinforcement for rainforced concrete work in foundation , footings basis of coloumn etc and mass concrete | 29.3 | Cum | 6,999 ₹2,05,070.7 | 6,451 ₹1,89,014.3 Lowest |
| 6.01 | Wall ( any thicknesss but not lessthen 0.10 mtrs thickness) attached pillasters, butteresses, plinth and string courses etc. from top of foundation level upto floor two level | 138.45 | Cum | 6,999 ₹9,69,011.55 | 6,451 ₹8,93,140.95 Lowest |
| 7.01 | Providing & Laying cement Concrete 1:5:10 (1 Cement : 5 Sand : 10 graded Stone aggregate 40 mm nominal size) awith 15% plum & curing complete excluding the cost of form work in retaining walls/Breast walls, the size of plums shall useally be 150mm to 300mm , as per HPPWD specification | 209.74 | Cum | 4,899 ₹10,27,516.26 | 4,351 ₹9,12,578.74 Lowest |
| 8.01 | Providing & Laying cement Concrete 1:3:6 (1 Cement : 3 Sand : 6 graded Stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth level | 20.08 | Cum | 5,699 ₹1,14,435.92 | 5,150 ₹1,03,412 Lowest |
| 9.01 | Providing & Laying cement Concrete 1:2:4 (1 Cement :2 Sand : 4 graded Stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth level | 26.77 | Cum | 6,599 ₹1,76,655.23 | 6,251 ₹1,67,339.27 Lowest |
| 10.01 | Providing for steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level. | 5,032.41 | Kg | 89 ₹4,47,884.49 | 70 ₹3,52,268.7 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
19 Jan 2022, 5:00 pmClosed
DPO IDP
Kangra at Dharamshala
C/O Cement Concreate ( at Across Jamthad Nallah Vill. Jamthad Dhar Ward No. 3 in GP Kallar under APO-Dehra
2022_CPD1_55497_1
DR-8/PWHS/2021-22
Open Tender
Civil Works - Water Works
Item Rate
60 days
GP Kallar
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
DPO IDP
₹1 L
Yes
25 Feb 2022
7 Jan 2022
20 Jan 2022
8 Jan 2022
19 Jan 2022
8 Jan 2022
Amount
Exacation in foundation trtenches etc. lift up to 1.5 mtrs. Stacking the excaveted soil not mote then 3 mtrs clear from the edge of the excavtion and the returining the stacked soil in 15cm layers when required into plinth sides of foundation etc. consloidating eaach deposited layers by ramming and watering and then disposing of all surplus excaveted earth with in all leads and lifts. Pick works 10%, Jumper work 40 % & Chiesslling work in soft rock& Hard rock 50%
Providing & Laying cement Concrete 1:4:8 (1 Cement : 4 Sand : 8 graded Stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth level
Providing form work with steel plates 3.15 mm thick welded iron in frame 30x30x5 mm So as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies , height of proping and centring below supporting floor to celling not exceeding 4 mtr. and removal of the same for insitu- reinforced concerte and plain concrete work in: vertical surface such as walls of any thickness partion and the like including attached pilasterrs buttresses, plinth and string courses and the like
Edges of slabs and breaks in floors and walls : under 20 cm wide
Providing & Laying cement Concrete 1:1.5:3 (1 Cement : 1.5 Sand : 3 graded Stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work reinforcement for rainforced concrete work in foundation , footings basis of coloumn etc and mass concrete
Wall ( any thicknesss but not lessthen 0.10 mtrs thickness) attached pillasters, butteresses, plinth and string courses etc. from top of foundation level upto floor two level
Providing & Laying cement Concrete 1:5:10 (1 Cement : 5 Sand : 10 graded Stone aggregate 40 mm nominal size) awith 15% plum & curing complete excluding the cost of form work in retaining walls/Breast walls, the size of plums shall useally be 150mm to 300mm , as per HPPWD specification
Providing & Laying cement Concrete 1:3:6 (1 Cement : 3 Sand : 6 graded Stone aggregate 40 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth level
Providing & Laying cement Concrete 1:2:4 (1 Cement :2 Sand : 4 graded Stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth level
Providing for steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level.
Providing in RCC work smooth finishing of the exposed surface with cement mortor 1:3 ( one cement three sand)
Providing laying jointing and testing bevelled ended MSERW pipe 250mm dia ( L-210) with circumfrential butt welded joints whever required electrical aurch welding ( Welding thickness shall be equal to pipe wall thickness) and testing of MSERW pipe of following dia meters confirming to IS-3183-2007 ( Part-II) having wall thickness as specified below capable of with standing required test pressure in all respect within all leads and lifts as per direction of Engineer i Charge
Providing & Fixing of CI sluice valve 250mm dia Leader/Kirloskar of Class PN-1 with MSERW pipe with 250 mm dia including flanges as per tabel 5 with nuts and bolts , 3 mm thick asbestos insertation, two layers of welding from inside and outside of the pipe complete i all respect
Designing , Surveving, detailed hydronlic and structual and drwaing including soil testing complete in all respect
Vijay kumar kushwaha
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .