| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.0 CrAccepted-AOC | ₹15.0 Cr | 1 | Accepted-AOC REASONABLE RATE |
Tender Value
₹15.6 Cr
EMD Value
₹31.2 L
Closing Date
6 Mar 2023, 3:00 pmClosed
The EE, TUDA
TUDA office Agartala
Sabroom Panisagar Sonamura Santirbazar Jirania Amarpur Kamalpur and Bishalgarh Towns eight towns in total in Tripura
2023_TUDA_36481_1
05_EE_TUDA_2022_23
Open Tender
Civil Works
730 days
8 towns
Please refer Tender documents.
9 documents required · 9 mandatory
₹10,000
TUDA Settlement Account
₹31.2 L
TUDA office Agartala
17 Aug 2023
10 Jan 2023
6 Mar 2023
10 Jan 2023
6 Mar 2023
30 Jan 2023
10 Jan 2023 - 21 Jan 2023
21 Jan 2023
Amount
For Sabroom Town Construction and repairing of Nalla
Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
For Panisagar Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
For Sonamura Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
For Santirbazar Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
For Jirania Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
For Amarpur Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
For Kamalpur Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
For Bishalgarh Construction and repairing of Nalla Design and construction of RCC Drain for the required size ( minimum 1.0 m width and 1.20 m depth) for accommodating the Insitu Nalla treatment components in the drain including clearing of the site, demolishing the existing damaged drains including cost of RCC of mix M25 with centering and shuttering, earth work excavation, refilling the sides after construction, dewatering, removal of surplus earth etc and providing the Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates & Providing FRP sheets in gates as rectangular notch as specified and guided by Engineer-In- Engineer in 4 Nos of Drains.
Coirvel treatment units (CTUs) Providing, fabricating, installation of Coirvel treatment units in mild steel and providing epoxy anti rust and water proof coating to the framework with mesh in between frames, complete done under guidance of SINE IIT Bombay Company-EEPL on payment by the contractor with single unit having tentative rectangular mesh frame of dimensions of 1.0 m width, 0.5 m length, and 1.2 m depth and top and bottom framing plates of 0.5 m length and 1.0 m width, etc and plantation in CTU as complete in 4 Drains (DBO Item)
Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL Providing, loading, unloading, and fixing of Heatlon sheet frame of 4' x 6' or available sizes and fixing in sections, Providing, supplying, and application of tie locks as required at the time of plantation, Providing, loading, unloading, and fixing of Plastic Mesh as required at the time of plantation, Providing, loading, unloading, and fixing of Cocunut Coir and coir ropes and fixing in sections, Providing, loading, unloading Plants (Canna indica) and plantation of the same in the Nallah Treatment will be done by EEP on payment by the contractor and Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in 4 Drains (DBO Item)
Providing and application of growth hormone etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor) and Providing and application of bio media, etc. complete as required at the time of commissioning. (Will be provided by SINE IIT Bombay Company on payment by the contractor ) including the royalty charges etc complete in the 4 Drains (DBO Item)
Coarse bubble Air Diffusers Pipe coarse air bubble diffusers, diffuser lines and accessories as required in Aeration unit with confirmation from EIC and and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor including the royalty charges etc complete in the drains (DBO Item)
Disinfection and solar panels Design and providing the Disinfection mixing set, including agitator shafts, mechanical units, sockets, plugs, Solar panels , Electric board, wires, LED indicator, fuse, battery, motor etc. complete) as required with confirmation from EIC and as approved by SINE IIT Bombay Company- EEPL on payment by the contractor (DBO Item)
Operation & Maintenance O & M Fee for 5 year Operation Service Period for cleaning and maintaining for new In-situ Nall Treatment unit proposed in 4 Drains for a total capacity of 1.0 MLD conforming to the relevant Service Levels including all necessary tasks, activities and obligations as necessary for operations, maintenance and management of waste water and all related infrastructure comprising of RCC drains, Coirvel treatment unit, Biomats, Biocurtains, CTU filing, Flo-rafts, plantation done by SINE IIT Bombay Company EEPL , Bubbled air Diffusers and disinfection arrangement and solar panels and necessary electric boards etc including the periodical cleaning of screens, removal of floating materials collected in the screens and removal of sludges in the drains and cleaning of the coir mats, Bio curtains, CTU units, Flo-rafts plantation etc and periodical remedial measures for repairing the diffusers and all the electical and mechanical parts and replacement of the spares etc complete including collection of the ULB’s revenue, customer services including recording and redressing customer complaints, including all administrative tasks, management tasks and all services to be provided as a prudent etc., as well as cost of management, wages, incentives, operations, maintenance, spares, administration, equipment, transport, taxes and levies, including all necessary preventive and reactive maintenance of all civil, mechanical, electrical and instrumentation units, administration, transport, communications, management information systems, reporting, including cost of all wages, chemicals, electricity*, consumables, administration, transport, spares, insurance, taxes levies etc., complete but excluding statutory payments. *Electricity: Bidders shall note the arrangements for pricing and payment of electricity charges will be borne by ULB's. The bidder shall separately provide the break-up of salaries and wages, consumables, electricity, preventive maintenance for civil, mechanical, electrical and instrumentation, insurance and all other costs in a separate sheet for analysis by Employer I) 1st Year
ii) 2nd Year
iii) 3rd year
IV) 4th year
v) 5th year
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF