| 1 | L1₹1.8 CrAdmitted-Finance KHERKI DAULA POST GURGAON GURGAON HARYANA 122004 | GURUGRAM | HARYANA | 122004 | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹15.8 L (8.78%)Admitted-Finance 301 VARDHAMAN CHAMBER II VIKASPURI NEW DELHI 110018 | WEST | DELHI | 110018 | ₹2.0 Cr+₹15.8 L (8.78%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT OK |
| 4 | Rejected-Technical FIRST FOOR SCF 1 SECTOR 17 FARIDABAD FARIDABAD FARIDABAD HARYANA 121002 | FARIDABAD | HARYANA | 121002 | - | - | Rejected-Technical NOT OK |
| Sl No | Description | Qty | Unit | Arctic Engineering Services L2 | Carrier Airconditioning & Refrigeration Ltd L1 |
|---|---|---|---|---|---|
| 1.00Annual Comprehensive Maintenance Contract 4x600 TR Centrifugal Compressor Water Cooled Carrier Made Chillers Plant including Plate Heat Exchanging Units, Motors, Pumps, cooling towers, Electrical Panels, VFDs etc. chilled water lines, cooling towers and all other machineries installed in the A.C. plant room at ESS-1 all inclusive supply & labour of Spare parts, consumable etc as per detail scope of work as mentioned in tender document terms and conditions for three years from the date of award of contract of respective years. Bidders must note that the cost of refrigerant Charging, top up and leak test with nitrogen, complete process during the contract will be considered inclusive. Cost of 19-25 mm thick closed cell nitrile rubber (Class " O") insulation for equipment cold surface of chillers, PHE, pumps, cleaning material, chemical brushes etc for cleaning condenser coil and cooling towers , plant room etc is considered as inclusive. | |||||
| 1.01 | First (1st) Year from date of Handing Over of Site/Work Order issuance | 12 | Month | 4,26,393 ₹51,16,716 | 4,00,020 ₹48,00,240 Lowest |
| 1.02 | Second (2nd ) Year after successful completion of first year of service (if extended) | 12 | Month | 4,45,774 ₹53,49,288 | 4,18,015 ₹50,16,180 Lowest |
| 1.03 | Third (3 rd ) Year after successful completion of second year of service (if extended) | 12 | Month | 4,66,125 ₹55,93,500 | 4,36,909 ₹52,42,908 Lowest |
| 2.00Annual Comprehensive Maintenance Contract 2x150 TR Screw Compressor Air Cooled Carrier Made Chillers Plant including Motors, Pumps, Electrical Panels, VFDs etc. chilled water lines and all other machineries installed in the A.C. plant room at ESS-3all inclusive supply & labour of Spare parts, consumable etc as per detail scope of work as mentioned in tender document terms and conditions for three years from the date of award of contract of respective years. Bidders must note that the cost of refrigerant Charging, top up and leak test with nitrogen, complete process during the contract will be considered inclusive. Cost of 19-25 mm thick closed cell nitrile rubber (Class " O") insulation for equipment cold surface of chillers, PHE, pumps,valves and other components: cleaning material, chemical brushes etc for cleaning condenser coil and cooling towers , plant room etc is considered as inclusive. | |||||
| 2.01 | First (1st) Year from date of Handing Over of Site/Work Order issuance | 12 | Month | 53,299 ₹6,39,588 | 50,002 ₹6,00,024 Lowest |
| 2.02 | Second (2nd ) Year after successful completion of first year of service (if extended) | 12 | Month | 55,721 ₹6,68,652 | 52,251 ₹6,27,012 Lowest |
| 2.03 | Third (3 rd ) Year after successful completion of second year of service (if extended) | 12 | Month | 58,265 ₹6,99,180 | 54,613 ₹6,55,356 Lowest |
| 3.00 | Repairing, Testing, Commissioning of existing Danfoss made VFD for secondary chilled water pumping Panel with 1 no. Bell & Gossett(xylem brand) Technologic 5500 Series Pump controller, 4 VFDs, differential pressure sensors with all necessary spares , consumable, wiring complete in all along with one year comprehensive warranty . (One time job) | 1 | Complete Job | 14,50,000 ₹14,50,000 | 10,00,000 ₹10,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
14 Jul 2025, 5:00 pmClosed
AEE, ELECTRICAL
IWD
Comprehensive (Fully) annual maintenance contract of higher side HVAC system at IISER Kolkata Mohanpur campus.
2025_IISER_865132_1
IISER-K/IWD/Elect./25-26/15
Open Tender
Electrical Works
Item Rate
365 days
IISER KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
A/C NO. 089301000011530
₹1 L
31 Jul 2025
19 Jun 2025
16 Jul 2025
19 Jun 2025
14 Jul 2025
19 Jun 2025
Amount
Annual Comprehensive Maintenance Contract 4x600 TR Centrifugal Compressor Water Cooled Carrier Made Chillers Plant including Plate Heat Exchanging Units, Motors, Pumps, cooling towers, Electrical Panels, VFDs etc. chilled water lines, cooling towers and all other machineries installed in the A.C. plant room at ESS-1 all inclusive supply & labour of Spare parts, consumable etc as per detail scope of work as mentioned in tender document terms and conditions for three years from the date of award of contract of respective years. Bidders must note that the cost of refrigerant Charging, top up and leak test with nitrogen, complete process during the contract will be considered inclusive. Cost of 19-25 mm thick closed cell nitrile rubber (Class " O") insulation for equipment cold surface of chillers, PHE, pumps, cleaning material, chemical brushes etc for cleaning condenser coil and cooling towers , plant room etc is considered as inclusive.
First (1st) Year from date of Handing Over of Site/Work Order issuance
Second (2nd ) Year after successful completion of first year of service (if extended)
Third (3 rd ) Year after successful completion of second year of service (if extended)
Annual Comprehensive Maintenance Contract 2x150 TR Screw Compressor Air Cooled Carrier Made Chillers Plant including Motors, Pumps, Electrical Panels, VFDs etc. chilled water lines and all other machineries installed in the A.C. plant room at ESS-3all inclusive supply & labour of Spare parts, consumable etc as per detail scope of work as mentioned in tender document terms and conditions for three years from the date of award of contract of respective years. Bidders must note that the cost of refrigerant Charging, top up and leak test with nitrogen, complete process during the contract will be considered inclusive. Cost of 19-25 mm thick closed cell nitrile rubber (Class " O") insulation for equipment cold surface of chillers, PHE, pumps,valves and other components: cleaning material, chemical brushes etc for cleaning condenser coil and cooling towers , plant room etc is considered as inclusive.
First (1st) Year from date of Handing Over of Site/Work Order issuance
Second (2nd ) Year after successful completion of first year of service (if extended)
Third (3 rd ) Year after successful completion of second year of service (if extended)
Repairing, Testing, Commissioning of existing Danfoss made VFD for secondary chilled water pumping Panel with 1 no. Bell & Gossett(xylem brand) Technologic 5500 Series Pump controller, 4 VFDs, differential pressure sensors with all necessary spares , consumable, wiring complete in all along with one year comprehensive warranty . (One time job)
Arctic Engineering Services (BID ID -3247393)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .