| 1 | L-1₹10.3 LAccepted-AOC | L-1 | Accepted-AOC Work awarded. | |
| 2 | L-2₹13.8 L+₹3.5 L (34.0%)Rejected-Finance | L-2 | Rejected-Finance High quoted | |
| 3 | L-3₹15.7 L+₹5.4 L (52.8%)Rejected-Finance 8 4 372 430 SAI BABA NAGAR SITE 3 BORABANDA BORABANDA HYDERABAD TELANGANA 500018 | MEDCHAL MALKAJGIRI | TELANGANA | 500018 | L-3 | Rejected-Finance High quoted | |
| 4 | L-4₹16.5 L+₹6.2 L (60.6%)Rejected-Finance 218 2ND FLOOR U S COMPLEX 120 MATHURA ROAD NEW DELHI 110076 | SOUTH | DELHI | 110076 | L-4 | Rejected-Finance High quoted | |
| 5 | L-5₹18.3 L+₹8.0 L (77.9%)Rejected-Finance | L-5 | Rejected-Finance abnormally high quoted |
Tender Value
₹17.2 L
EMD Value
₹34,382
Closing Date
21 Jun 2022, 3:00 pmClosed
AGM (Engg Elect)/Incharge(Civil)
AAI, Gondia
Construction of Cooling Pit at Birsi Airport, Gondia
2022_AAI_113911_2
AAI/GONDIA/ENGG-C/COOLING PIT/2022
Open Tender
Civil Works
Item Rate
183 days
Gondia
As per NIT Criteria
4 documents required · 4 mandatory
₹1,180
₹34,382
5 Aug 2022
31 May 2022
22 Jun 2022
1 Jun 2022
21 Jun 2022
1 Jun 2022
1 Jun 2022 - 17 Jun 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size).
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
Brick work with F.P.S. bricks of class designation 3.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supplying and stacking at site. Moorum
Brick work with F.P.S. bricks of class designation 3.5 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement: 6 coarse sand)
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size).
Providing high impact Polypropylene reinforced cement 6 mm thick corrugated sheets (as per IS: 14871) roofing up to any pitch and fixing with polymer coated J, or L hooks, bolts and nuts 8 mm dia. G.I. plain and bitumen washers or with self drilling fastener and EPDM washers etc. complete (excluding the cost of purlins, rafters and trusses), including cutting sheets to size and shape wherever required.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
Providing and fixing in position pre-moulded joint filler in expansion joints.
Providing and laying in position bitumen hot sealing compound for expansion joints etc. Using grade ‘A’ sealing compound.
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of pplying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. (The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.)
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.
prime constructions
FABREKO ENGINEERING PRIVATE LIMITED
CIS GLOBAL INFRATECH PRIVATE LIMITED
Gunje Chinna
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .