Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
30 Sept 2026, 4:00 pm7d left
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Completion of Balance Works, including Construction of Intake Chamber at Headsite, Constt of Pre-Settling Tank with Washout/Sluice Chamber, 0.05 MGD Slow Sand Filtration Plant, 0.25 Lac Gallons SR with Sluice Chamber, Staff Quarter including Laying a
2026_PWDJK_325550_1
3rd Call PHE E-NIT No 18 of 2026-27 EE-Hyd-Grz-888-94 E-tendering Dated-21-09-2026
Open Tender
Civil Works - Water Works
Percentage
360 days
Gurez
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,600
Executive Engineer Hydraulic Division Gurez
₹2.9 L
Executive Engineer Hydraulic Division Gurez
22 Sept 2026
22 Sept 2026
1 Oct 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil): | 489.91 | Cum | 592.9 | ₹2,90,469.12 |
| 1.01 | Ordinary rock | 5.51 | Cum | 940.3 | ₹5,183.4 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 1,645.43 | Cum | 479.3 | ₹7,88,654.6 |
| 2.01 | Ordinary rock | 396.09 | Cum | 924.8 | ₹3,66,304.03 |
| 3 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.
65mm Dia GI | 1,134 | RM | 80.3 | ₹91,060.2 |
| 3.01 | 50mm Dia GI | 1,300 | RM | 44.85 | ₹58,305 |
| 3.02 | 40mm Dia GI | 1,200 | RM | 44.85 | ₹53,820 |
| 3.03 | 25mm Dia GI | 1,000 | RM | 33.7 | ₹33,700 |
| 3.04 | 20mm Dia GI | 1,250 | RM | 22.25 | ₹27,812.5 |
| 3.05 | 15mm Dia GI | 1,100 | RM | 22.25 | ₹24,475 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1100420.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .