| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC 04 CHANDRABANI DEHRADUN UTTARAKHAND 248002 | DEHRADUN | UTTARAKHAND | 248002 | ₹1.6 Cr Quoted ₹1.9 Cr | L1 | Accepted-AOC lowest rate |
| 2 | L2₹2.0 Cr+₹6.7 L (3.50%)Rejected-Finance | ₹2.0 Cr+₹6.7 L (3.50%) | L2 | Rejected-Finance higher |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technical proposal improper |
| 4 | Rejected-Technical ADD NEAR POLICE CHOWKI DHALWALA P O MUNI KI RETI DISTT TEHRI GARHWAL | - | - | Rejected-Technical Technical proposal and bidder qualification improper |
| 5 | Rejected-Technical 09 02 | TEHRI GARHWAL | UTTARAKHAND | 249001 | - | - | Rejected-Technical Technical proposal improper |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
14 Mar 2023, 6:00 pmClosed
superintending engineer circle Dehradun
.E. RWD circle Dehradun, Tapowan road Raipur Dehradun
Const. of Rural motor road (Stage I) from Purwalgaon SC basti to Saundhar under bhilangna block of tehri (with 5year maintenance)
2023_RES_55516_1
RWD_Ghl_17a(1)_2023
Open Tender
Civil Works - Roads
Item Rate
270 days
bhilangna block of tehri
As per S.B.D. of the work and tender notic
4 documents required · 4 mandatory
₹5,900
As per tender notice and SBD
₹3.4 L
S.E. RWD Circle Dehradun
17 May 2023
27 Feb 2023
15 Mar 2023
27 Feb 2023
14 Mar 2023
27 Feb 2023
10 Mar 2023
Amount
hill road (hill side cutting/ filling):- Excavation in hilly area for construction of raod in all type of siols & rocks with E&B and BLB as met at site true to lines as per plan, X-section, L- Section camber, super elevation as required also including uprooting & Cutting of bushess dressing lifts and safe disposal of surplus excavated material at suitable dumping places by mechanical means / manual means including in the drawing with out damaging forest and forest land including slip clearance during hill side cutting as directed by Engineer-in-charg.e.. Earth & Boulder,Ordinery Rock,Hard Rock etc complete in all respect as per direction given by Engg. in charge.
Excavation in Soil with Dozer with lead upto 100 m :Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. for Super Elevation.
Random Rubble stone masonary in Coolie walling including supply of all material, cu.m labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications)
Excavation in foundation for retaining & breast walls in all types of soils and rocks ncluding lead, lift and disposal of surplus material as per direction of engineer - in -charge
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&Pand royaltiies etc.(As per PWD Uttarakhand specifications)
Random Rubble Masonary laid dry in breast wall,retainingwall, parapets,scupper cu.m etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications)
H.P stone filling in back of wallls including cost of all materials ,royality.t&p etc. complete.
Providing edge stones on valley side of formation as per drawing and Technical metre Specification Clause 1608.2.6
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 120311-4-3-1 Nominal mix (1:2:4)
Cement plaster 15 mm thick 1:4 on stone masonry
Pointing with cement mortar (1:3) on brick work as per technical specification clause 613.3
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203R.C.C grade M 20
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6
Longitudinal katcha drain C/O of katcha drain per m
Gravel/Soil-Aggregate Base (Table 400.2) Grading Construction of gravel/soil-aggregate base by providing well graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402
8-2-1 Construction of reference pillars as per Fig. 1600.1 (b) as per drawing and Technical Specification Clause 1602.1 Construction of reference pillars (burjee) @ 20 m on both sides and @ 8.33 m interval on curves
Construction of Back pillars as per Fig. 1600.1 (c) as per drawing and Technical Specification Clause 1602.3 Construction of Back Pillar in frot of eatch reference pillars
Construction of Job pillers as per Fig. 1600.1 (d) and Technical Specification Clause 1602.4
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 Ordinary Kilometer Stone (Precast)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 200 m stone (precast)
Providing and Fixing Title Information Board Project each Providing and fixing of typical informatory sign board as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1
Providing and fixing of semi reflective cautionary, mandato and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2
Removal of Unsuitable Soil with Disposal Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
1-7 Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS:280&IS:4826 in150mmx 150mm meshlaid withstone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) 1-7-1 GI wire 10 gauge BWG
ROUTINE MAINTENANCE Routine maintenance.The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. mord 15-7-2 Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909 , Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910, Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 , Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 , Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 1ST YEAR
Same as item no 27 but for 2ND YEAR
Same as item no 27 but for 3RD YEAR
Same as item no 27 but for 4TH YEAR
Same as item no 27 but for 5TH YEAR
MNR Construction Co.
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .