| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 CrAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KKB PROJECTS PVT LTD L1 |
|---|---|---|---|---|
| 1.00Item Description | ||||
| 1.01 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. | 209.3 | Cu mt. | 300 ₹62,790 Lowest |
| 1.02 | Removing all types of Hume pipes and stacking within all lead and lift including Earthwork and Dismantling of Masonry Works as per Technical Specification (Above 600 mm to 900 mm) | 200 | Rmt | 100 ₹20,000 Lowest |
| 1.03 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a with all lead & lift as per Technical Specification | 37,762.5 | Sq mt. | 8 ₹3,02,100 Lowest |
| 1.04 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material | 13.5 | Ha | 25,000 ₹3,37,500 Lowest |
| 1.05 | Construction of Sub-grade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement with all lead as per Technical Specification | 32,807.1 | Cu mt. | 250 ₹82,01,775 Lowest |
| 1.06 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per Technical Specification | 26,387.48 | Cum. | 65 ₹17,15,186.2 Lowest |
| 1.07 | Construction of embankment with approved material obtained from borrow pits with a lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement with with all lead & lift as per Technical Specification | 55,573.03 | Cum. | 250 ₹1,38,93,257.5 Lowest |
| 1.08 | Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 30 per cent copper slag ,grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification . | 24,516 | Cum. | 400 ₹98,06,400 Lowest |
| 1.09 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification . (GSB-II) (Including Hard Shoulder) | 17,977.13 | Cum. | 1,250 ₹2,24,71,412.5 Lowest |
Tender Value
₹16.0 Cr
EMD Value
₹34.1 L
Closing Date
31 May 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Panchayat,RnB Division,Bharuch
DPIU and Executive Engineer, R and B P Division, BHARUCH,Railway Station Road opp. SBI, BHARUCH 392001
Widening and Strengthening of Rajgadh to Bhagha Road Ch.0.000 to 12.370 to Gundhiya to kamaliya Road Ch.0.000 to 17.600,Ta Valia, Dist Bharuch
2021_SRRDA_109679_1
GJ0505P3 3rd Call
Open Tender
Civil Works - Roads
Item Rate
335 days
Bharuch
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,000
DPIU and Executive Engineer Panchayat R and B Divi
₹34.1 L
VADODARA
11 Jun 2021
19 May 2021
2 Jun 2021
19 May 2021
31 May 2021
19 May 2021
24 May 2021
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. | 209.3 | Cu mt. | 100 | ₹20,930 |
| 1.02 | Removing all types of Hume pipes and stacking within all lead and lift including Earthwork and Dismantling of Masonry Works as per Technical Specification (Above 600 mm to 900 mm) | 200 | Rmt | 100 | ₹20,000 |
| 1.03 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a with all lead & lift as per Technical Specification | 37,762.5 | Sq mt. | 10 | ₹3,77,625 |
| 1.04 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material | 13.5 | Ha | 10 | ₹135 |
| 1.05 | Construction of Sub-grade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement with all lead as per Technical Specification | 32,807.1 | Cu mt. | 10 | ₹3,28,071 |
| 1.06 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per Technical Specification | 26,387.48 | Cum. | 10 | ₹2,63,874.8 |
| 1.07 | Construction of embankment with approved material obtained from borrow pits with a lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement with with all lead & lift as per Technical Specification | 55,573.03 | Cum. | 10 | ₹5,55,730.3 |
| 1.08 | Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 30 per cent copper slag ,grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification . | 24,516 | Cum. | 10 | ₹2,45,160 |
| 1.09 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification . (GSB-II) (Including Hard Shoulder) | 17,977.13 | Cum. | 10 | ₹1,79,771.3 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_177886.xls
BOQ Document • 0.29 MB
77470359.pdf
Tender Document • 0.07 MB
TenderDocumentValia0505Part013rdCall.rar
Tender Document • 15.79 MB
TenderDocumentValia0505Part023rdCall.rar
Tender Document • 11.05 MB
TenderDocumentValia0505Part033rdCall.rar
Tender Document • 12.16 MB
77470361.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .