| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.9 LAccepted-AOC | ₹49.9 L | L1 | Accepted-AOC LOWEST QUOTED AMOUNT |
| 2 | L2₹50.7 L+₹86,020.91 (1.72%)Rejected-AOC | ₹50.7 L+₹86,020.91 (1.72%) | L2 | Rejected-AOC 2ND LOWEST QUOTED AMOUNT |
| 3 | L3₹50.8 L+₹91,110.90 (1.83%)Rejected-AOC VILLAGE KUMRADI MANGLOUR ROORKEE HARIDWAR 247656 | HARIDWAR | UTTARAKHAND | 247656 | ₹50.8 L+₹91,110.90 (1.83%) | L3 | Rejected-AOC 3RD LOWEST QUOTED AMOUNT |
| 4 | L4₹51.9 L+₹2.0 L (4.07%)Rejected-Finance | ₹51.9 L+₹2.0 L (4.07%) | L4 | Rejected-Finance QUOTED AMOUNT MORE THEN ESTIMATED COST |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
18 Jun 2026, 2:00 pmClosed
General Manager Bhartiya Co-Operative Gramin Vikas
General Manager Bhartiya Co-Operative Gramin Vikas Evam Nirman Ltd.
Construction of field expansion at GIC Manch Block Champawat
2026_BCGN1_96007_1
291 /BCGVENL/TENDER/2026-27 Dated 26/05/2026
Open Tender
Construction Works
Percentage
365 days
Champawat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
GM, BHARTIYA COOPERATIVE GRAMIN VIKAS EVAM NIRMAN
₹1.0 L
4 Jul 2026
28 May 2026
18 Jun 2026
28 May 2026
18 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NEW WORK | - | - | - | - |
| 2 | EARTH WORK | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 10.87 | Cum | 632.95 | ₹6,880.17 |
| 4 | FILLING | - | - | - | - |
| 5 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 9.87 | Cum | 700.5 | ₹6,913.93 |
| 6 | P.C.C | - | - | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.03 | Cum | 6,812 | ₹7,016.36 |
| 8 | D.P.C | - | - | - | - |
| 9 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). | 2.62 | Sqm | 410.85 | ₹1,076.43 |
| 10 | REINFORCED CEMENT CONCRETE | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_113483.xls
BOQ • 0.57 MB
GICMANCHCHAMPAWATMINIST.pdf
Tender Documents • 4.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .