Sri Seetha Rama & Sri Venugopala Swamy Temple, Pi
Sri Seetha Rama & Sri Venugopala Swamy Temple, Pinnelli(V), Machavaram(M), Palnadu District
Re-Construction of Sri Seetha Rama & Sri Venugopala Swamy Temple, Pinnelli(V), Machavaram(M), Palnadu District
917554
P/COE/495/2026
OPEN - NCB
Civil Works
PALNADU
14 documents required · 13 mandatory · 1 optional
₹2,879
₹81,319
24 Apr 2026
25 Mar 2026
25 Mar 2026
( Re-Construction of Sri Seetha Rama & Sri Venugopala Swamy Temple at Pinnelli(V), Machavaram(M), Palnadu(Dt). )Earth work excavation for foundation and depositing at site with intial lead of 10m and lift of 2m in mixture of gravel and ordinary gravel including all operational,incidental,labour charges etc.,complete for finished item of work as per SS. For Foundation
Filling with sand in foundations & basement from approved source to site including cost and conveyance of all materials and all labour charges etc., for finished item of work as per SS
PCC (1:4:8) for foundation levelling courses and below flooring beds using 40mm size hard Granite metal upto Plinth level from approved quarry including cost and conveyance of all materials to site and all labour charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as per SS
R.R. Stone masonry in CM (1:6) using Hard Granite stones from available at site including cost and conveyance of all materials and all labour charges at site etc., complete for finished item of work as per SS
Stone masonry using Granite Stone including labour charges for jointing and all labour charges etc., complete for finished item of work as per SS(Cost of stone)
Rough Dressing-Chitravanam
Upapeetam jagati
Upapeetam Kantam
Upapeetam Kapathakam
Adhistana Jagati
Adhistana Kumudukam
Adhistana Kantam Pattika
Prastaram Uttaram Eludukam
prastaram Kapothakam
Palmana dressing-Chitravanam
Upapeetam jagati
Upapeetam Kantam
Upapeetam Kapathakam
Adhistana Jagati
Adhistana Kumudukam
Adhistana Kantam Pattika
Prastaram Uttaram Eludukam
prastaram Kapothakam
Cost of Tool making Material like Chisels, Charcoal for furnace etc .
Labour Charges for Jointing
VRCC M20 Nominal mix using 20mm size hard granite m/c graded metal(coarsed aggregate)including cost andconveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site with all steel centering,shuttering,machine mixing,laying ,vibrating, lifting,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS (Column Footing).
For Plinth beam
For Beams (L,T,Rec)
For 5'' thick roof slab of M.M
For 3'-0'' wide half bell shape
Providing High Yield Strength Deformed (HYSD) (Fe 415/500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work in all floors.( APSS No.126)
Ornamental Brick work with C.M(1:5) using 2nd class bricks from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site and labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work as per SS(Above Sthambavargam (1st storey))
Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" in CM (1:3) and top finishing 1/2" thick with C.M(1:2) to bring the required ornamentation,fine rendering with neat cement including cost and conveyance of all materials,labour charges, all operational and incidental charges,curing etc.,complete to the required shape and size as per the approved drawings and as per Silpi Norms for finished item of work.(Above Sthambavargam level(1at storey))
Supply of granite stone including fine dressing and polishing to the shape and dimensions as per the approved drawing including cost and conveyance of all labour charges etc.,complete ((A) Cost of Stone for Door Frame for Garbhalayam,Ardha mandapam & Sub Temples )(Upto 7'-0''ht)
(B) Dressing charges for Door Frame for Garbhalayam,Ardha mandapam & Sub temples
(C)Fixing Charges (upto 7'-0''ht)
Supplying and fixing of scaffolding including cost & conveyance of all materials such as casurina poles,bamboos,bamboos mats and coir rope etc.,including all labour charges complete for finished item of work(Up to 20.0ht)
up to 20.0 ht to 40.0 ht
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Document.docx
TENDER_DOCUMENT • 0.18 MB
Adm Sanction.pdf
TENDER_DOCUMENT • 3.76 MB
BOQItems.xls
TENDER_DOCUMENT • 0.59 MB
Scan0033.pdf
TENDER_DOCUMENT • 7.76 MB
Scan0034.pdf
TENDER_DOCUMENT • 3.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .