| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 CrAccepted-AOC | L1 | Accepted-AOC successful bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical Does not Satisfy the required qualifying criteria | |
| 3 | Rejected-Technical | - | Rejected-Technical Does not Satisfy the required qualifying criteria |
Tender Value
₹15.4 Cr
EMD Value
₹15.4 L
Closing Date
28 Nov 2023, 5:00 pmClosed
Chief Construction Engineer,KIP,Basudevpur
office of the CCE,KIP,Basudevpur,Keonjhar
Construction of Minors of Rengalgoda Distributary and Phulakanlei Distributary including their all structures of Kanupur Irrigation Project
2023_KPRIP_96989_1
CCE,KIP(KCD-II)-17/2023-24
National Competitive Bid
Civil Works - Canal
Percentage
330 days
Chief Construction Engineer, KIP, Basudevpur
please refer tender documents
3 documents required · 3 mandatory
₹10,000
₹15.4 L
Yes
office of the CCE,KIP,Basudevpur,Keonjhar
24 Apr 2024
14 Nov 2023
29 Nov 2023
14 Nov 2023
28 Nov 2023
14 Nov 2023
21 Nov 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungles, uprooting stumps and small bushes and trees below 1.00M girth on pre-measurement including disposing off the debris clear of the work site with supply of all equipments, tools and plants, labour required for the work including all taxes, royalties,cess etc. all complete as per the direction of the Engineer-in-charge. | 5,14,620 | 100 Sqm | 27.2 | ₹1,39,97,664 |
| 2 | Triangular or square section trench cutting 0.15m. deep for alignment and demarcation purpose and dug belling 10cm to 15 cm including marking lines with cost of all labour, cess and T&P etc. complete as per the direction of the Engineer-in-charge. | 2,00,130 | Mtr. | 6.6 | ₹13,20,858 |
| 3 | Excavation of canal / drain in both wet and dry condition by mechanical means in all kinds of soil (This shall include ordinary soil, sand, silt, slushy soil, hard soil, gravelly soil, stoney earth mixed with gravels, pebbles, stone boulder not exceeding 1/2cum by volume, moorum, etc.) including dewatering, rough dressing and levelling the excavated canal slopes and bed to design section and depositing the useful approved excavated earth in the canal embankments in filling section in layers not exceeding 22.5cm. in depth and breaking clods to maximum 5cm to 7cm size and depositing the un-useful surplus materials in spoil banks or on any other specified space with proper section, as directed, by mechanical means, including cost of all leads, lifts and de-lifts, loading and unloading, handling and re-handling, with all cost for site illumination, mobilisation and demobilisation, diversion road, coffer dam, and all taxes, royalties,cess, T&P etc. complete, with all cost incidental to the work as per the specification and direction of the Engineer-in-charge.(Measurement will be taken on finished level section.) | 1,17,612.3 | Cum | 81.9 | ₹96,32,447.37 |
| 4 | Excavation of canal / drain by mechanical means in DI rock, laterite rock and soft rock not requiring blasting, removable by pick-axe and crow bars, in both wet and dry condition, including cost of all incidental charges etc. and depositing the excavated materials either in spoil bank or in any other specified space, as directed, by mechanical means, including cost of all leads, lifts and de-lifts etc. including dewatering with all cost and running charges of pumps and accessories, cofferdams, dressing and levelling the bed and sides to design section, with all cost for site illumination, mobilisation, demobilisation and all taxes, royalties,cess, T&P etc. complete as per the specification and direction of the Engineer-in-charge. (Measurement will be taken on finished level section) | 36,548.7 | Cum | 104.8 | ₹38,30,303.76 |
| 5 | Earthwork in canal embankments including specified proud for all height using approved earth excavated by mechanical means from borrow area (to be arranged by the contractor observing all statutory acts / rules such as PESA/OMMC Rule -2004 etc.) including cost of loading into and transportation by mechanical means, unloading the earth in canal embankments/ canal beds on properly prepared and scientifically approved surface with cost of all leads, lifts, de-lifts, handling and re-handling charges etc., spreading and levelling the earth in layers not exceeding 22.5cm. in depth, removing the undesirable materials, breaking clods to maximum 5cm to 7cm size, and make it ready for watering and compaction with vibratory roller as per the canal section but excluding the cost of spreading , watering and compaction and including the cost of lighting borrow areas, construction of approach roads to borrow areas, diversion roads, site illuminations, mobilisation, demobilisation, royalties, taxes,cess, T&P and all other cost incidental to the work etc. complete as per the direction of the Engineer-in-Charge within lead of 3 km. (Measurement of earthfill to be taken on finished compacted level section under OMC condition) | 1,16,139.3 | Cum | 172.1 | ₹1,99,87,573.53 |
| 6 | Cost of royalty and cess of useful excavated earth from cutting zones to be carried and utilised in filling reaches, including spreading & levelling the earth in layers and removal of the undesirable materials, breaking clods to maximum 5cm to 7cm size, to make ready for watering and compaction with Vibratory Roller but excluding watering and compaction, etc. complete, as directed by the Engineer-in-charge. | 65,350.8 | Cum | 40 | ₹26,14,032 |
| 7 | Fine dressing and turfing the slopes of the canal embankments with approved quality of compact dub grass including cost of collection and supplying the same from the approved site, loading, unloading, conveyance charges, royalty,cess, all other taxes on all materials, all leads, lifts, and de-lifts, and as per approved design, drawing, specification, as per the direction of the Engineer-in-charge including cost of mobilisation, demobilisation charges and all incidental charges to complete the item of work, with cost of supplying all machineries and equipments, their running and maintenance charges, all materials, labour required for the work, supervision charges, cost of watering and cost of making all arrangements for survival of the turf till its full growth, etc. complete in all respect. (Measurement will be taken after full survival of the growth of grass) | 1,55,708.34 | Sqm | 28.5 | ₹44,37,687.69 |
| 8 | Excavation of foundation of structures by manual/ mechanical means in all kinds of soil ( This shall include ordinary soil, sand, silt, slushy soil, hard soil, gravelly soil, stoney earth mixed with gravels, pebbles, stone boulder not exceeding 0.014cum by volume, moorum, etc.) in both wet and dry condition, including cost of dewatering of foundation, coffer dam, dressing, levelling the foundation bed and sides as per drawing and specification, all leads, lifts, de-lifts etc, depositing the useful approved excavated earth in the canal embankments in filling section in layers not exceeding 22.5cm. in depth, breaking clods to maximum 5cm to 7cm size and depositing the un-useful surplus materials in spoil banks or on any other specified space with proper section as directed, by manual/mechanical means, with cost of all leads, lifts, de-lifts, loading and unloading, handling and re-handling, with all cost for site illumination, mobilisation, demobilisation, diversion road, and all taxes, royalties,cess, T&P etc. complete, with all cost incidental to the work as per the specification and direction of the Engineer-in-charge. | 32,351.68 | Cum | 81.9 | ₹26,49,602.59 |
| 9 | Excavation of foundation of structures by manual/ mechanical means in DI rock, laterite rock and soft rock not requiring blasting, removable by pick-axe and crow bars, in both wet and dry condition including cost of all incidental charges etc., depositing the excavated materials either in spoil bank or in any other specified space,as directed, by manual/ mechanical means, all leads, lifts, de-lifts etc., dewatering with all cost and running charges of pumps and accessories, coffer dams, dressing and levelling the bed and sides, with all cost for site illumination, mobilisation, demobilisation, all taxes, royalties,cess, and T&P etc. complete as per the specification and direction of the Engineer-in-charge. | 8,087.92 | Cum | 104.8 | ₹8,47,614.02 |
| 10 | Filling foundation and plinth with selected excavated materials by mechanical/ manual means and lying in layers, duly compacted, including watering, ramming, with all leads, lifts, de-lifts including all cost incidental to the work etc. complete as per the direction of the Engineer-in-charge. | 12,703.67 | Cum | 62.2 | ₹7,90,168.27 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_473202.xls
BOQ Document • 0.29 MB
133402505.pdf
Tender Document • 0.33 MB
BidDocument.pdf
Tender Document • 1.59 MB
133402507.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .