| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | L1 | Accepted-Finance Lowest rate and hence the work is awarded to this contractor | |
| 2 | L2₹3.8 L+₹38,758.95 (11.4%)Accepted-Finance | L2 | Accepted-Finance Second bidder and hence kept in alliance till the agreement execution of the 1st bidder. |
| Sl No | Description | Qty | Unit | HARIDAS PANTHAPLACKAL MADHAVANPILLAI L1 | JAYAKRISHNAN P R (J K ASSOCIATES) L2 |
|---|---|---|---|---|---|
| 1.00Desiltation | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 480 | cum | 230 ₹1,10,400 Lowest | 257.63 ₹1,23,662.4 |
| 1.00 | OD17767/2026-2027:Hire and running charges of tipper | 10 | Day | 5,662.6 ₹56,626 Lowest | 6,291.71 ₹62,917.1 |
| 1.00 | OD17768/2026-2027:Hire and running charges for Hydraulic excavater for loading the de-silted sand or soil obtained to tipper, for unloading and levelling of the dumping yard, for additional cleaning of the bathing ghat just before the starting of mandala maholsavam season and for the removal of the stone, bounders from various locations on the u/s of checkdam
including cost of services of operating staff, cost of lubricating oil, disel/petrol and other
consuables for running the machinary. | 69 | hour | 1,322 ₹91,218 Lowest | 1,468 ₹1,01,292 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 120 | sqm | 16.5 ₹1,980 Lowest | 18.19 ₹2,182.8 |
| 1.00 | OD17766/2026-2027:Engaging coolie | 30 | Day | 975 ₹29,250 Lowest | 1,082.18 ₹32,465.4 |
| 1.01 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 320 | sqm | 121 ₹38,720 Lowest | 134 ₹42,880 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.75 | cum | 8,000 ₹6,000 Lowest | 9,235 ₹6,926.25 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 7.5 | sqm | 756 ₹5,670 Lowest | 839.6 ₹6,297 |
Tender Value
₹3.8 L
EMD Value
₹9,467
Closing Date
19 Sept 2026, 3:00 pmClosed
Nisha Das A
Irrigation Subdivision changanasserry
GENERAL-Sabarimala pilgrimage 2026-27- De-siltation and Cleaning of Erumely veliyathodu near Check dam in front of Erumely temple in Erumely Panchayath-General Civil Work
2026_Irrig_868876_1
IRR/IA/TR/5091/2026_5_2_1/1
Open Tender
Civil Works - Others
Item Rate
Erumely
Please refer Tender documents.
8 documents required · 8 mandatory
₹835
Yes
₹9,467
Yes
22 Sept 2026
10 Sept 2026
22 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Desiltation | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 480 | cum | - | - |
| 1.002 | OD17767/2026-2027:Hire and running charges of tipper | 10 | Day | - | - |
| 1.003 | OD17768/2026-2027:Hire and running charges for Hydraulic excavater for loading the de-silted sand or soil obtained to tipper, for unloading and levelling of the dumping yard, for additional cleaning of the bathing ghat just before the starting of mandala maholsavam season and for the removal of the stone, bounders from various locations on the u/s of checkdam
including cost of services of operating staff, cost of lubricating oil, disel/petrol and other
consuables for running the machinary. | 69 | hour | - | - |
| 1.004 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 120 | sqm | - | - |
| 1.005 | OD17766/2026-2027:Engaging coolie | 30 | Day | - | - |
| 1.006 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 320 | sqm | - | - |
| 1.007 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.75 | cum | - | - |
| 1.008 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 7.5 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1471688.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1471688.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 3.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .