Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.8 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L-1 | Accepted-AOC Work Awarded | |
| 2 | L-2₹17.0 L+₹27,131.25 (1.62%)Rejected-Finance 1 10573 GALI NO 2 MOHAN PARK NAVEEN SHAHDARA EAST DELHI DELHI 110032 | SHAHDARA | DELHI | 110032 | L-2 | Rejected-Finance Due to higher rate | |
| 3 | L-3₹17.5 L+₹73,914.75 (4.41%)Rejected-Finance NEAR EAST WEST PUBLIC SCHOOL SHAHABAD GATE RAMPUR U P | L-3 | Rejected-Finance Due to higher rate |
Tender Value
Refer Docs
EMD Value
₹51,000
Closing Date
21 Sept 2024, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Re-innovation and Turfing of 33 KV Yard at 33/11 KV Sub Station, Sector-09, SIDCUL, Pantnagar under EDD-I, Rudrapur
2024_UPCL3_75422_1
EDC(USN)18/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Rudrapur
Pl. refer tender documents
4 documents required · 4 mandatory
₹1,180
EE ETD Rudrapur
₹51,000
18 Jan 2025
6 Sept 2024
23 Sept 2024
6 Sept 2024
21 Sept 2024
6 Sept 2024
Amount
Annexure-A (LABOUR CHARGES)
Charges of P/F Bajaj/Havells/Orient or equivalent make ceiling fan 1200mm dia suitable for 230volts, 50hz, single.
Charges of S/F of Monoblock pump make of Kirloskar/ Bajaj having capacity of 0.5 HP including necessary accessories such as Tee, elbow, socket, reducer.niple what so ever required.
Charges of P/F crompton industrial exhaust fan or equivalent make (multicolour,18-inch) with all fitings labour, material, T&P etc. Including installation, testing and commissioning complete in all respect.
Charges of Excavation in Soil in Hilly Area/ River Bed by Mechanical Means i.e. Backhoe Loader
Charges of Reinforcement for RCC Work Including straightening, cutting, bending, placing in positing and binding all complete. (I) Reinforcement for RCC Work using cold twisted bars.
Charges of Repairing of damage light & fan wiring as per instruction of Engineer in Charge.
CC from Switchyard Ratio 1:4:12 as per instruction of Engineer in Charge.
Fencing of Yard as per instruction of Engineer in Charge.
Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends (distance 0-20 Km)
Fixing of Chemical Earthing of T/F as per instruction of Engineer in Charge.
Annexure-B (SUPPLY ITEMS)
Supply of MCCB 4 Pole 100 Amp
Supply of 9 U Rack Including Fan and PDU
Supply of Earth Electrode
Supply of Rubber Mat (Insulted) 1Mx1M x3 MM
Supply of First Aid Box
M/S GURU NANAK ENTERPRISES
TNK Electricals
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .