| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | L1 | Accepted-AOC Competent committee rejected the file due to higher rates | |
| 2 | L2₹21.6 L+₹2.7 L (14.0%)Rejected-AOC | L2 | Rejected-AOC Competent committee approved the tender in favour of Ist Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹18,940
Closing Date
1 Dec 2023, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
For Increasing Capacity of 39 Nos Existing DT and Installation of 16 Nos New Distribution Transformer of Various Capacity at Various Places under System Augmentation/Strengthening Works in Defferent Districts scheme under EDD-II, Bareilly
2023_MVVNL_858487_1
61/EDCB/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Work
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
SE, EDC, Bareilly
₹18,940
14 May 2024
2 Nov 2023
2 Dec 2023
2 Nov 2023
1 Dec 2023
2 Nov 2023
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-II Bareilly Approx. distance upto 60 Km. Including safe loading and unloading.
PCC Pole 8.5 Mtr
ACSR Weasal Conductor
AB Cable 3x95 sqmm
AB Cable 3x50 sqmm
AB Cable 1x16 sqmm
11/0.4 KV 3 Phase 400 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 25 KVA T/F
LT Cable 1x400 sqmm
LT Cable 3.5x150 sqmm
LT Cable 3.5x70 sqmm
Other Line material
Dismentaling of 250 KVA Transformer as per norms complete in all respect
Dismentaling of 16 KVA Transformer as per norms complete in all respect
Dismentaling of 10 KVA Transformer as per norms complete in all respect
Mounting of 400 KVA T/F Transformers as per norms complete in all respect -
Mounting of 100 KVA T/F Transformers as per norms complete in all respect -
Mounting of 25 KVA T/F Transformers as per norms complete in all respect -
Fabrication & Installation of 11 KV Fuse set unit to be installed on midway of 11 KV Double Pole Structure. Material Detail for complete the work given below :- 1. MS Channel 100x50x2028mm) - 1 Nos (Provided by Contractor) 2. Iron Strip (50x5x305mm) - 3 Nos (Provided by Contractor) 3. 200 mm Fuse wire of required capacity - 3 lenght (Provided by Contractor) 4. Holding Clamps - 2 Nos (Provided by Contractor) 5. Aluminium Lug 70 sqmm - 4 Nos (Provided by Contractor) 6. Off Size Nut & Bolt - As Required (Provided by Contractor) 7- 11 KV Composite Pin Insulator - 6 Nos (Provided by Department) (Manpower & T &P would be provided by the contrator at his own cost)
Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Laying of LT Cable 1x400 sq mm complete in all respect
Laying of LT Cable 3.5x150 sq mm complete in all respect
Laying of LT Cable 3.5x70 sq mm complete in all respect
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
AB Cable 3x95 sqmm
AB Cable 3x50 sqmm
AB Cable 1x16 sqmm
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Fixing of 3 Pahse Distribution Box complete in all respect
Fixing of 1 Pahse Distribution Box complete in all respect
Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost)
Stone Pad 300x300x75 mm
Distribution Box Clamp
Cross Arm Holding Clamp
F Bracket
Danger Board With Clamp
Barbed Wire
Aluminium Lug 400 sqmm with Nut&Bolt
P G Clamp
Holding Clamp for S/s
Holding Clamp for LT T-Off
LT Clamp With Nut & Bolt
Stay Insulator
LT Shackle Insulator
Nut & Bolt for Shackle Insulator
Piercing Connector
Safe back carriage of Following item (if any) from work site to C.B. Ganj store Bareilly approx distance upto 60 Km including loading & unloading.
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 16 KVA T/F
11/0.4 KV 3 Phase 10 KVA T/F
M/S SAMAR ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .