| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical AT BHIANPADA PO BAULANGA PS GOP DIST PURI | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹61.0 L
EMD Value
₹61,030
Closing Date
6 Mar 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER, R.W DIVISION, NIM
O/O THE SUPERINTENDING ENGINEER, R.W DIVISION, NIM
Building
2026_CERWI_126729_1
Tender Online Divn.NPR-19/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Nimapara
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹61,030
Yes
5 May 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
27 Feb 2026 - 6 Mar 2026
Fly Ash Brick Work in C.M (1:6) using Fly Ash Bricks of approved quality in superstructure including providing key bricks, splays cutting, circular moulding, champering, chiselling including watering, curing with cost , conveyance , royalty taxes of all materials, labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge. (First Floor)
Second Floor
R.C.C.Work of M-20 nominal mix (1:1/2:3) using 20mm & 10mm H.G stone aggregate with approved quality from approved quarry for cement concrete including centring & shuttering work cost of all materials, labour T&P required for the work with royality etc. Complete in all respect as per direction of the Engineer in charge. (First Floor Column & Roof Beam)
Lintal
Chajja
Roof Slab
Stair Case
Second Floor (Column & Beam)
Second Floor (Chajja)
Second Floor (Roof Slab)
Providing & Supplying of TMT bars confirming to grade Fe - 500D cutting bending, binding, lapping, splicing, welding etc. (conforming to IS 1786/1985 specification & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying in position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge(as to be approved by the Deptt.) etc. complete (weight of binding wire shall not be considered for payment at all which will be borne by the contractor ) standard CO-efficient of different sizes of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC-21/1987 as per direction of the Engineer in charge. (First Floor)
Second Floor
12 mm thick Cement Plaster in C.M. (1 : 6 ) using good coarse river Sand of approved quality finished smooth over Brick Masonary after racking out joints including watering, curing with cost , conveyance , royalty taxes of materials all labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge. (First Floor)
Second Floor
16 mm thick Cement Plaster in C.M. (1 : 6 ) using good coarse river Sand of approved quality finished smooth over Brick Masonary after racking out joints including watering, curing with cost , conveyance , royalty taxes of materials all labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge. (First Floor)
Second Floor
Supplying fitting & fixing of M.S Iron door & windows with grills of approved design including cost of all materials, labour T&P required for the work etc. Complete in all respect as per direction of the Engineer in charge. (First Floor)
Second Floor
Cement washing two coats including watering and curing with cost, conveyance, royalty of all materials, labour charges, T&P etc. required for the work complete as per the specification and direction of the Engineer-in-charge. (First Floor)
Second Floor
Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface including one coat of priming to receive painting including cost & convency of all materials labour T&P required for the work etc. Completed in all respect as per direction of Engineer in-charge
Wall painting two coats to walls with weather coat of approved shade on new work over a coat of Primer to give an even shade including cost of distemper and cost of all materials, labour T&P required for the work etc. Complete in all respect as per direction of the Engineer in charge. (First Floor)
Second Floor
Distempering two coats to walls with distemper of approved shade on new work to give an even shade including cost of distemper and cost of all materials, labour T&P required for the work etc. Complete in all respect as per direction of the Engineer in charge. (First Floor)
Second Floor
Painting two coats with any approved enamel paint over a coat of priming to new wood/ Iron work including cost conveyance, taxes of all materials to site and all labour charges required for the work etc. Complete in all respect as per direction of the Engineer in charge. (First Floor)
Second Floor
Supplying ,fitting & fixing of stainless of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mmx32mm x2mm @ rate 0.90mtr . c/c and stainless square pipe bracing of size 32mmx32mmx2mm in 3 rows in stair case as per approved design and specification, buffing , polishing etc with cost ,conveyance, taxes of all materials , labour, T&P etc. required for the complete in all respect.including all cost of labour, T&P hire charges of drilling machine, labour charges etc. Complete in all respect as per direction of the Engineer in charge.
Fixing Vitified tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing etc complete including cost of all materials, labour, T&P required for the work as per the direction of the Engineer-in-Charge.
Fixing Marble in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the marble including rubbing and polishing etc complete including cost of all materials, labour, T&P required for the work as per the direction of the Engineer-in-Charge.
Fixing Marble in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the marble including rubbing and polishing etc complete including cost of all materials, labour, T&P required for the work as per the direction of the Engineer-in-Charge.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.59 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
DTCN.pdf
Tender Documents • 2.09 MB
BOQ_583463.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .