Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.2 LAdmitted-Fee/PreQual/Technical/Finance ERNAKULAM 682025 | ERNAKULAM | ERNAKULAM | KERALA | 682025 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹28.3 L+₹5,000 (0.18%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | INFRA ELEVATORS INDIA PVT LTD L1 | ATLAS ELEVATOR INDIA PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00Replacement of damaged Lift No: 1 ( D&E) | |||||
| 1.00 | OD157065/2024-2025:Supply, Installation, Testing and Commissioning of 24 Passenger Bed cum passenger Hospital lift, with the following specification including all required standard features. as per relevant IS, with latest amendments, 1, Type of passenger lift -Gear less, Machine room type 2,Load / Persons 1632 kg / 24 persons 3,Rated speed 1 Mtr /Sec. 4,Travel 15 Mtr ( Approx. ) 5, No. of floor and entrance served , Ground to fourth floor - 5 openings 6 , No. of floors served - Five floors 7, Method of control Micro processor based V3F with ARD system. 8, Position of machine room -above lift well 9, Size of lift well 2000mm W x 3300mm D 10, Size of car platform As per IS 11, Car entrance 1200 mm authomatic telescopic opening 3 panel 12, Leveling accuracy As per IS 13 ,Car door opening ( customized )As per IS 14 ,Drive Variable voltage variable frequency (V3F) 15 ,Operation Simplex full selective collective control with load weighing device 16 ,Construction of design and furnishing of car body work Scratch proof Stainless steel finish cabinet with Scratch proof Stainless steel door, Stainless steel mat finish ceiling, Stainless steel anti skid flooring, fan with timer cut-off, push to talk, LED display, LED light, hand rails and floor announcement system. All buttons in car and all landings should have Braille sign. 17, Landing entrance Automatic telescopic opening 3 panel Scratch proof stainless steel sliding door as per ISS with provision for mechanical opening key for emergency with full length infra red light curtains and Stainless Steel framed 1/2 glass door, fire proof. 18 ,Call and position indicators Up/down direction & position Dot Matrix / LED indication shall be provided at all landings 19 ,Electric supply 1) Light 230/50 C/s single phase 2 wire system, Power 415 V 50 C/s 3 phase 4 wire system. 20, Automatic Rescue Device Provide automatic rescue device with an electronic controller powered by 4 Nos. 12V 24 AH dry free maintenance batteries. The rescue operation should act within 10 seconds of power failure 21, Regulation 340V- 480V (SMPS based) b. Call indicator (inside the car) c. Push buttons for door close & door open (inside the car) d. Emergency stop button (inside the car) e. Flush mounted switch for fan and light (inside the car) f. Non stop button (inside the car) g. Emergency lamp with UPS / Inverter back up (inside the car) h. Alarm bell with UPS / Inverter back up i. Push & talk j. Fireman' s switch at main lobby k. Auto / attendant control (inside the car) 22, Winding handle Manual winding provision for car in case of an emergency. 23, Safeties a) Over speed governor b) Safety gears & IS approved Buffers c) Motor over load protection d) Phase reversal protection e) Single phase precentor f) Final limit switch g) Door pressure limit switch h) Other safeties as per ISS 24, Leveling Automatic leveling at all landing as per IS 25, Guarantee - Company shall carry out free maintenance during warranty period of 36 months which shall also includes 1. Cleaning lift equipment 2. Lubricating all required machinery / equipment 3. Replacing of Lubricating Oil when required 4. Replacing fusible items, alarm etc 5. Recharging/replacing batteries in case of such requirements 6. Replacing /Rewinding motor if required 7. Replacing/renewing all defective part of the lift including V3F unit if found necessary 26, Control panel Control panel will be dust and vermin proof of sheet metal enclosure 27, Announcement System to provide lift announcement system 29,Tests At site tests as per relevant IS to be carried out before Handing over. 30, Additional features: - a. Cloud based elevator monitoring system with email trigger for elevator fault/ complaints. b. Elevator lock switch panel at main floor to keep the elevator locked without switch off the power supply. c. Smart emergency alarm/ Rescue call unit with SIM based intercom to 3 phone numbers and rescue SMS functions. d. Parking function at main floor. e. Car call password protection for floors as required. f. Automatic brake force test function as per BIS. g. Rescue landing function during the mechanical struck of any landing door. h. Automatic Rescue Device with low battery protection function. i. 1 nos of CCTV with recording function at lift cabin. 31,Scope of work:- 1)Dismantling of existing elevator & buy back a) Supply of lift materials & installation b)Minor civil works such as removal of temporary brick work in the lift entrance without affecting the building structure, finishing/ altering civil works including core cutting necessary for ropes to pass through, minor civil works for the lift entrance/ pit by providing brick work & plastering if necessary including minor civil works such as construction of buffer block in the pit machine foundation in the machine room, cutting pockets and grounding brackets for the guide rails, grouting boxes for control units, correction of wall opening in the front side of the wall, Including core cutting at machine room floor, Providing iron hook / beam. c) Scaffolding d) Door frames e) Supporting steel f) Temporary electric supply for installation of lift. Electric supply for testing and commissioning of lift is to be arranged by the firm on their own account. g) Obtaining scheme approval as well as energization Certificate from the electrical Inspectorate including preparation of necessary drawing for the same. Necessary fee shall be remitted to the Inspectorate by the firm for which no refund will be made from the department including taking insurance for one year as per new lift rule. h) Supply of book let with complete details of maintenance schedule and control diagram. i) Giving training to department staff for attending trouble shooting j) Free servicing for 36 months after handing over (k) Dismantling & Buyback of old lift | 1 | each | 28,23,000 ₹28,23,000 Lowest | 28,28,000 ₹28,28,000 |
Tender Value
₹35.4 L
EMD Value
₹50,000
Closing Date
5 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer, PWD Electrical Division, Civil station, Alappuzha-688001
DEPOSIT-Govt. T D Medical College Hospital,Vandanam ,Alappuzha-Replacement of damaged Lift -D and E Lift No. 1, 24 passenger bed lift-Electrical Lift Work
2026_PWD_882971_1
PWD/BLDG/TR/10053/2024_15_4_3
Open Tender
Electrical Works
Item Rate
300 days
Vandanam MCH
Please refer tender documents
11 documents required · 11 mandatory
₹2,760
₹50,000
7 Nov 2026
27 Oct 2026
7 Nov 2026
27 Oct 2026
5 Nov 2026
27 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replacement of damaged Lift No: 1 ( D&E) | |||||
| 1.001 | OD157065/2024-2025:Supply, Installation, Testing and Commissioning of 24 Passenger Bed cum passenger Hospital lift, with the following specification including all required standard features. as per relevant IS, with latest amendments, 1, Type of passenger lift -Gear less, Machine room type 2,Load / Persons 1632 kg / 24 persons 3,Rated speed 1 Mtr /Sec. 4,Travel 15 Mtr ( Approx. ) 5, No. of floor and entrance served , Ground to fourth floor - 5 openings 6 , No. of floors served - Five floors 7, Method of control Micro processor based V3F with ARD system. 8, Position of machine room -above lift well 9, Size of lift well 2000mm W x 3300mm D 10, Size of car platform As per IS 11, Car entrance 1200 mm authomatic telescopic opening 3 panel 12, Leveling accuracy As per IS 13 ,Car door opening ( customized )As per IS 14 ,Drive Variable voltage variable frequency (V3F) 15 ,Operation Simplex full selective collective control with load weighing device 16 ,Construction of design and furnishing of car body work Scratch proof Stainless steel finish cabinet with Scratch proof Stainless steel door, Stainless steel mat finish ceiling, Stainless steel anti skid flooring, fan with timer cut-off, push to talk, LED display, LED light, hand rails and floor announcement system. All buttons in car and all landings should have Braille sign. 17, Landing entrance Automatic telescopic opening 3 panel Scratch proof stainless steel sliding door as per ISS with provision for mechanical opening key for emergency with full length infra red light curtains and Stainless Steel framed 1/2 glass door, fire proof. 18 ,Call and position indicators Up/down direction & position Dot Matrix / LED indication shall be provided at all landings 19 ,Electric supply 1) Light 230/50 C/s single phase 2 wire system, Power 415 V 50 C/s 3 phase 4 wire system. 20, Automatic Rescue Device Provide automatic rescue device with an electronic controller powered by 4 Nos. 12V 24 AH dry free maintenance batteries. The rescue operation should act within 10 seconds of power failure 21, Regulation 340V- 480V (SMPS based) b. Call indicator (inside the car) c. Push buttons for door close & door open (inside the car) d. Emergency stop button (inside the car) e. Flush mounted switch for fan and light (inside the car) f. Non stop button (inside the car) g. Emergency lamp with UPS / Inverter back up (inside the car) h. Alarm bell with UPS / Inverter back up i. Push & talk j. Fireman' s switch at main lobby k. Auto / attendant control (inside the car) 22, Winding handle Manual winding provision for car in case of an emergency. 23, Safeties a) Over speed governor b) Safety gears & IS approved Buffers c) Motor over load protection d) Phase reversal protection e) Single phase precentor f) Final limit switch g) Door pressure limit switch h) Other safeties as per ISS 24, Leveling Automatic leveling at all landing as per IS 25, Guarantee - Company shall carry out free maintenance during warranty period of 36 months which shall also includes 1. Cleaning lift equipment 2. Lubricating all required machinery / equipment 3. Replacing of Lubricating Oil when required 4. Replacing fusible items, alarm etc 5. Recharging/replacing batteries in case of such requirements 6. Replacing /Rewinding motor if required 7. Replacing/renewing all defective part of the lift including V3F unit if found necessary 26, Control panel Control panel will be dust and vermin proof of sheet metal enclosure 27, Announcement System to provide lift announcement system 29,Tests At site tests as per relevant IS to be carried out before Handing over. 30, Additional features: - a. Cloud based elevator monitoring system with email trigger for elevator fault/ complaints. b. Elevator lock switch panel at main floor to keep the elevator locked without switch off the power supply. c. Smart emergency alarm/ Rescue call unit with SIM based intercom to 3 phone numbers and rescue SMS functions. d. Parking function at main floor. e. Car call password protection for floors as required. f. Automatic brake force test function as per BIS. g. Rescue landing function during the mechanical struck of any landing door. h. Automatic Rescue Device with low battery protection function. i. 1 nos of CCTV with recording function at lift cabin. 31,Scope of work:- 1)Dismantling of existing elevator & buy back a) Supply of lift materials & installation b)Minor civil works such as removal of temporary brick work in the lift entrance without affecting the building structure, finishing/ altering civil works including core cutting necessary for ropes to pass through, minor civil works for the lift entrance/ pit by providing brick work & plastering if necessary including minor civil works such as construction of buffer block in the pit machine foundation in the machine room, cutting pockets and grounding brackets for the guide rails, grouting boxes for control units, correction of wall opening in the front side of the wall, Including core cutting at machine room floor, Providing iron hook / beam. c) Scaffolding d) Door frames e) Supporting steel f) Temporary electric supply for installation of lift. Electric supply for testing and commissioning of lift is to be arranged by the firm on their own account. g) Obtaining scheme approval as well as energization Certificate from the electrical Inspectorate including preparation of necessary drawing for the same. Necessary fee shall be remitted to the Inspectorate by the firm for which no refund will be made from the department including taking insurance for one year as per new lift rule. h) Supply of book let with complete details of maintenance schedule and control diagram. i) Giving training to department staff for attending trouble shooting j) Free servicing for 36 months after handing over (k) Dismantling & Buyback of old lift | 1 | each | - | - |
stage.html
html • 0.02 MB
finance_1503364.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1503364.xls
BOQ • 0.26 MB
sbd10053.pdf
Tender Documents • 1.92 MB
AMCLift10053.pdf
Other Document • 0.12 MB
SpecificConditionLift.pdf
Additional Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .