| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.2 LAdmitted-Fee/PreQual/Technical/Finance NO 9 OFFICERS COLONY AYYA DWARAGA 100 FEET BYE PASS ROAD VELACHERY CHENNAI 600 042 | CHENNAI | CHENNAI | TAMIL NADU | 600042 | ₹5.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.3 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.5 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Sakthi Developments Coy L9 | ENGINEERS DIAGNOSTIC CENTRE PRIVATE LIMITED L8 | SWAYIN ENGINEERING ASSOCIATES Pvt. Ltd. L6 | PRASANNA C M L7 | MKN ENGINEERING LLP L10 | GREEN WORLD SOFT TECH L4 | VGeotech Experts Pvt. Ltd L5 | DCM Test Labs L1 | GEOBUILD ENGINEERING INDIA PVT LT L3 | JOSMAR CONSULTING ENGINEERS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00GEOTECHNICAL INVESTIGATION FOR NEW 110 KV SUBSTATION PROJECT AT FACT UDYOGMANDAL COMPLEX, KOCHI. | |||||||||||||
| 1.01 | Mobilisation of all necessary equipment and personnel at the proposed location including setting up of equipment at various test locations, shifting from one location to the next location and dismantling, demobilising the same after completion of work. | 1 | LS | 40,000 ₹47,200 | 25,000 ₹29,500 | 1,00,000 ₹1,18,000 | 1,50,000 ₹1,77,000 | 2,00,000 ₹2,36,000 | 15,000 ₹17,700 Lowest | 30,000 ₹35,400 | 34,999 ₹41,298.82 | 40,000 ₹47,200 | 1,00,000 ₹1,18,000 |
| 1.02 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: From Ground level up to 10m depth. | 80 | M | 80,000 ₹94,400 | 1,12,000 ₹1,32,160 | 1,44,000 ₹1,69,920 | 40,000 ₹47,200 Lowest | 1,12,000 ₹1,32,160 | 64,000 ₹75,520 | 1,04,000 ₹1,22,720 | 79,920 ₹94,305.6 | 80,000 ₹94,400 | 1,28,000 ₹1,51,040 |
| 1.03 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: From 10m up to 20m depth. | 80 | M | 80,000 ₹94,400 | 96,000 ₹1,13,280 | 1,44,000 ₹1,69,920 | 16,000 ₹18,880 Lowest | 1,28,000 ₹1,51,040 | 1,28,000 ₹1,51,040 | 1,04,000 ₹1,22,720 | 79,920 ₹94,305.6 | 80,000 ₹94,400 | 56,000 ₹66,080 |
| 1.04 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: Beyond 20m depth. | 40 | M | 40,000 ₹47,200 | 40,000 ₹47,200 | 72,000 ₹84,960 | 8,000 ₹9,440 Lowest | 72,000 ₹84,960 | 88,000 ₹1,03,840 | 1,04,000 ₹1,22,720 | 39,960 ₹47,152.8 | 44,000 ₹51,920 | 14,000 ₹16,520 |
| 1.05 | Drilling through hard rock/ boulders using Rotary Drilling and collection of core samples with Nx size coring bits including preservation of core samples in standard core boxes as specified. | 16 | M | 28,800 ₹33,984 | 88,000 ₹1,03,840 | 64,000 ₹75,520 | 32,000 ₹37,760 | 16,000 ₹18,880 Lowest | 48,000 ₹56,640 | 64,000 ₹75,520 | 56,000 ₹66,080 | 32,000 ₹37,760 | 52,800 ₹62,304 |
| 1.06 | Determination of ground water level and collection of water samples as specified or as directed by the Engineer-in-charge. | 8 | M | 800 ₹944 Lowest | 800 ₹944 Lowest | 800 ₹944 Lowest | 8,000 ₹9,440 | 4,000 ₹4,720 | 2,400 ₹2,832 | 2,400 ₹2,832 | 1,200 ₹1,416 | 800 ₹944 Lowest | 2,000 ₹2,360 |
| 1.07 | Collection of undisturbed soil samples including sealing the sampling tube, handling, transportation, etc. complete. | 32 | EA | 25,600 ₹30,208 | 3,200 ₹3,776 Lowest | 3,200 ₹3,776 Lowest | 32,000 ₹37,760 | 20,800 ₹24,544 | 6,400 ₹7,552 | 3,200 ₹3,776 Lowest | 16,000 ₹18,880 | 3,200 ₹3,776 Lowest | 6,400 ₹7,552 |
| 1.08 | Conducting Electrical Resistivity tests as specified | 4 | EA | 40,000 ₹47,200 | 30,000 ₹35,400 | 4,000 ₹4,720 Lowest | 40,000 ₹47,200 | 34,000 ₹40,120 | 24,000 ₹28,320 | 4,000 ₹4,720 Lowest | 20,000 ₹23,600 | 32,000 ₹37,760 | 28,000 ₹33,040 |
| 1.09 | Natural moisture content | 32 | EA | 9,600 ₹11,328 | 1,600 ₹1,888 Lowest | 1,600 ₹1,888 Lowest | 16,000 ₹18,880 | 8,000 ₹9,440 | 6,400 ₹7,552 | 3,200 ₹3,776 | 1,600 ₹1,888 Lowest | 3,200 ₹3,776 | 2,400 ₹2,832 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
11 Jun 2026, 4:00 pmClosed
AGM(Projects and Planning) UC
AGM(Projects and Planning) FACT-UC,Udyogamandal, Kochi, Kerala
GEOTECHNICAL INVESTIGATION FOR NEW 110 KV SUBSTATION PROJECT AT FACT UDYOGMANDAL COMPLEX, KOCHI.
2026_FACT_909604_1
3009/2026-2027/E33537
Open Tender
Civil Works
Item Rate
60 days
Udyogamandal
Refer Tender Documents
6 documents required · 6 mandatory
₹0
₹12,000
Yes
16 Jun 2026
21 May 2026
12 Jun 2026
21 May 2026
11 Jun 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1GEOTECHNICAL INVESTIGATION FOR NEW 110 KV SUBSTATION PROJECT AT FACT UDYOGMANDAL COMPLEX, KOCHI. | |||||
| 1.01 | Mobilisation of all necessary equipment and personnel at the proposed location including setting up of equipment at various test locations, shifting from one location to the next location and dismantling, demobilising the same after completion of work. | 1 | LS | - | - |
| 1.02 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: From Ground level up to 10m depth. | 80 | M | - | - |
| 1.03 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: From 10m up to 20m depth. | 80 | M | - | - |
| 1.04 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: Beyond 20m depth. | 40 | M | - | - |
| 1.05 | Drilling through hard rock/ boulders using Rotary Drilling and collection of core samples with Nx size coring bits including preservation of core samples in standard core boxes as specified. | 16 | M | - | - |
| 1.06 | Determination of ground water level and collection of water samples as specified or as directed by the Engineer-in-charge. | 8 | M | - | - |
| 1.07 | Collection of undisturbed soil samples including sealing the sampling tube, handling, transportation, etc. complete. | 32 | EA | - | - |
| 1.08 | Conducting Electrical Resistivity tests as specified | 4 | EA | - | - |
| 1.09 | Natural moisture content | 32 | EA | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_956015.xls
BOQ • 0.26 MB
COMPE33537.pdf
Additional Documents • 4.02 MB
TERMSE33537.pdf
Tender Documents • 15.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].