| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 603 605 PRABHAT CENTRE ANNEXE SECTOR 1A CBD BELAPUR NAVI MUMBAI 400 614 | NAVI MUMBAI | THANE | MAHARASHTRA | 400614 | ₹1.5 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.5 Cr+₹12,684 (0.09%)Rejected-AOC | ₹1.5 Cr+₹12,684 (0.09%) | L2 | Rejected-AOC not L1 |
| Sl No | Description | Qty | Unit | ARHAM CONSTROTECH PVT LTD L2 | K.Daniels Projects (India) Pvt. Ltd. L1 |
|---|---|---|---|---|---|
| 0.001. The Quoted rates shall not be less than the minimum wages of minimum manpower required including ESI/Health insurance (Health insurance is mandatory if labour is not eligible for ESI), EPF and GST thereon. Bids less than the above value shall be treated as invalid and will not be considered as lowest bid. 2. All the contract workers/engineers engaged shall compulsorily be covered by ESI/Health insurance & EPF. 3. In cases where ESI is zero, health insurance equivalent to ESI charges @3.25% of minimum Rs.21,000 only shall be provided by the Contractor. | |||||
| 1.00Carrying out works viz. site supervision, taking measurements of work done, assistance in preparation of bills, preparation and maintaining work & site related documents etc. and works related to Civil Engineering, Electrical Engineering, Mechanical/HVAC Engineering, Administration, structural, HVAC & architectural drawings etc. overall as directed by Engineer-in-Charge. 1. Reduction shall be made from the bills as below per day basis on respective items on requirement as per BOQ:- (a) In the event of less requirement by the Department: Proportionately in measurements/payments (b) In the event of deficiency in deployment by the agency: Proportionately in measurements/payments and penalty will be imposed as per Appendix V to NIT 2. Manpower shall be deployed within 15 days from the date of request by EIC/issue of letter of award. 3. Police Verification Certificate and valid medical certificate from registered MBBS doctor shall be obtained by the contractor for the deployed staff. 4. For measurement purposes, manpower deployed for 26 days-8 hours shift per day shall be considered as one month. 5. In case of emergency works/exigencies, the manpower has to stay longer (more than 8 hours shift) ocassionally as per the instructions of EIC. No additional payment shall be made to the contractor on this account. 6. The manpoower shall be deployed in general shift, round the clock shift including sundays, holidays as decided by EIC. 7. Contractor shall provide maximum one week (or any other period as directed by NFC) break to the deployed manpower in staggered manner over a period of time as per NFC policy. No payment/compensation/penalty shall be made to the contractor in this regard. | |||||
| 1.01 | Carrying out civil engineering works as per requirement of A.1(i) of Annexure-'A'. | 12 | Month | 6,92,277 ₹83,07,324 Lowest | 6,95,300 ₹83,43,600 |
| 1.02 | Carrying out electrical engineering works as per requirement of A.1(ii) of Annexure-'A'. | 12 | Month | 81,444 ₹9,77,328 Lowest | 81,800 ₹9,81,600 |
| 1.03 | Carrying out HVAC/Mechanical engineering works as per requirement of A.1(iii) of Annexure-'A'. | 12 | Month | 1,22,166 ₹14,65,992 Lowest | 1,22,700 ₹14,72,400 |
| 1.04 | Carrying out Structural drawing/draughting works as per requirement of A.1(iv) of Annexure-'A'. | 12 | Month | 1,62,889 ₹19,54,668 Lowest | 1,63,600 ₹19,63,200 |
| 1.05 | Carrying out Architecture drawing/draughting works as per requirement of A.1(v) of Annexure-'A'. | 12 | Month | 40,722 ₹4,88,664 Lowest | 40,900 ₹4,90,800 |
| 1.06 | Carrying out HVAC/draughting works as per requirement of A.1(vi) of Annexure-'A'. | 12 | Month | 40,722 ₹4,88,664 Lowest | 40,900 ₹4,90,800 |
| 1.07 | Carrying out Administrative works as per requirement of A.2 (i) of Annexure-'A'. | 12 | Month | 75,437 ₹9,05,244 | 69,400 ₹8,32,800 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
27 Mar 2026, 2:00 pmClosed
Chief Engineer and DCE (CED, PD and EP)
Civil Engineering Division, Nuclear Fuel Complex, Hyderabad-500062
Assistance for supervision, draughting etc. of civil , electrical and HVAC jobs for various works in NFC at Hyderabad.
2026_NFC_901887_1
C/1421/2026
Open Tender
Civil Works
Item Rate
365 days
NFC, Hyderabad
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹2.9 L
30 Apr 2026
10 Mar 2026
28 Mar 2026
10 Mar 2026
27 Mar 2026
13 Mar 2026
10 Mar 2026 - 12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 01. The Quoted rates shall not be less than the minimum wages of minimum manpower required including ESI/Health insurance (Health insurance is mandatory if labour is not eligible for ESI), EPF and GST thereon. Bids less than the above value shall be treated as invalid and will not be considered as lowest bid. 2. All the contract workers/engineers engaged shall compulsorily be covered by ESI/Health insurance & EPF. 3. In cases where ESI is zero, health insurance equivalent to ESI charges @3.25% of minimum Rs.21,000 only shall be provided by the Contractor. | |||||
| 1Carrying out works viz. site supervision, taking measurements of work done, assistance in preparation of bills, preparation and maintaining work & site related documents etc. and works related to Civil Engineering, Electrical Engineering, Mechanical/HVAC Engineering, Administration, structural, HVAC & architectural drawings etc. overall as directed by Engineer-in-Charge. 1. Reduction shall be made from the bills as below per day basis on respective items on requirement as per BOQ:- (a) In the event of less requirement by the Department: Proportionately in measurements/payments (b) In the event of deficiency in deployment by the agency: Proportionately in measurements/payments and penalty will be imposed as per Appendix V to NIT 2. Manpower shall be deployed within 15 days from the date of request by EIC/issue of letter of award. 3. Police Verification Certificate and valid medical certificate from registered MBBS doctor shall be obtained by the contractor for the deployed staff. 4. For measurement purposes, manpower deployed for 26 days-8 hours shift per day shall be considered as one month. 5. In case of emergency works/exigencies, the manpower has to stay longer (more than 8 hours shift) ocassionally as per the instructions of EIC. No additional payment shall be made to the contractor on this account. 6. The manpoower shall be deployed in general shift, round the clock shift including sundays, holidays as decided by EIC. 7. Contractor shall provide maximum one week (or any other period as directed by NFC) break to the deployed manpower in staggered manner over a period of time as per NFC policy. No payment/compensation/penalty shall be made to the contractor in this regard. | |||||
| 1.01 | Carrying out civil engineering works as per requirement of A.1(i) of Annexure-'A'. | 12 | Month | - | - |
| 1.02 | Carrying out electrical engineering works as per requirement of A.1(ii) of Annexure-'A'. | 12 | Month | - | - |
| 1.03 | Carrying out HVAC/Mechanical engineering works as per requirement of A.1(iii) of Annexure-'A'. | 12 | Month | - | - |
| 1.04 | Carrying out Structural drawing/draughting works as per requirement of A.1(iv) of Annexure-'A'. | 12 | Month | - | - |
| 1.05 | Carrying out Architecture drawing/draughting works as per requirement of A.1(v) of Annexure-'A'. | 12 | Month | - | - |
| 1.06 | Carrying out HVAC/draughting works as per requirement of A.1(vi) of Annexure-'A'. | 12 | Month | - | - |
| 1.07 | Carrying out Administrative works as per requirement of A.2 (i) of Annexure-'A'. | 12 | Month | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
declaration.pdf
Tender Documents • 0.15 MB
Biddocument5TECHFORMSATOH.xls
Tender Documents • 0.08 MB
GCCSCC.pdf
Tender Documents • 1.19 MB
Biddocument7_AERBControlofWorks.pdf
Tender Documents • 0.27 MB
BOQ_947970.xls
BOQ • 0.38 MB
FinBidDocument.pdf
Tender Documents • 0.31 MB
Corringendum.pdf
PDF • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .