| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L Quoted ₹11.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.4 LRejected-AOC | ₹11.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MUHAMMED BASHEER L1 | MUHAMMAD ALI T K L2 |
|---|---|---|---|---|---|
| 1.00App A - Construction of Boat Jetty | |||||
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 77.85 | sqm | 420.91 ₹32,767.84 | 433.54 ₹33,751.09 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 17.1 | sqm | 1,047.75 ₹17,916.53 | 1,079.18 ₹18,453.98 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 20.03 | sqm | 831.54 ₹16,654.08 | 856.49 ₹17,153.78 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 6.98 | sqm | 1,099.32 ₹7,675.45 | 1,132.3 ₹7,905.72 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.42 | cum | 11,432.76 ₹1.6 L | 11,775.74 ₹1.7 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,357.22 | kilogram | 122.55 ₹2.9 L | 126.23 ₹3.0 L |
| 1.01 | OD23444/2025-2026::Conveying, lifting, handiling, hoisting, aligning and fixing R.C.C pile 300 mm square, 6 m in<br>length from the place of casting to placing site driving plant up to a distance of 150 m including hire charges<br>for planks, wooden scantiling, coire rope,crow bars, etc. complete | 84 | metre | 1,255.63 ₹1.1 L | 1,293.3 ₹1.1 L |
| 1.01 | OD23446/2025-2026:Driving down RCC piles 300 to 400mm square 9m to 12m in length to lines and
levels<br>through various strata from bed level till refusal with monkey weighing not less than 2 T with the
aid of pile<br>Driving plant with winch barg and accessories, wire rope manila rope etc for including labor
and hire<br>charges for all machinery and material required and cost of lubricant oils pay of staff etc
complete(9m to 12m)length ).(Taking that 2 piles can be driven in a day for 9 m average depth) | 60 | metre | 685.92 ₹41,155.20 | 706.5 ₹42,390 |
| 1.01 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.54 | cum | 4,002.36 ₹2,161.27 | 4,122.43 ₹2,226.11 |
Tender Value
₹10.2 L
EMD Value
₹25,383
Closing Date
6 Nov 2025, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER IRRIGATION SUB DIVISION ALAPPUZHA
Construction of C type RCC Boat Jetty at Swami chirayil in Nehru trophy ward of Alappuzha Municipality-General Civil Work
2025_Irrig_813842_2
IRR/IA/TR/3850/2025_5_1_1/1
Open Tender
Civil Works - Others
120 days
Alappuzha Municipality
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹25,383
Yes
13 Jan 2026
3 Nov 2025
10 Nov 2025
3 Nov 2025
6 Nov 2025
3 Nov 2025
Amount
App A - Construction of Boat Jetty
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD23444/2025-2026::Conveying, lifting, handiling, hoisting, aligning and fixing R.C.C pile 300 mm square, 6 m in<br>length from the place of casting to placing site driving plant up to a distance of 150 m including hire charges<br>for planks, wooden scantiling, coire rope,crow bars, etc. complete
OD23446/2025-2026:Driving down RCC piles 300 to 400mm square 9m to 12m in length to lines and levels<br>through various strata from bed level till refusal with monkey weighing not less than 2 T with the aid of pile<br>Driving plant with winch barg and accessories, wire rope manila rope etc for including labor and hire<br>charges for all machinery and material required and cost of lubricant oils pay of staff etc complete(9m to 12m)length ).(Taking that 2 piles can be driven in a day for 9 m average depth)
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
OD23448/2025-2026:Hire and labor for 3rd class country boat witth two boat man for arranging the form<br>work for beam & slabs<br>Code
60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
OD23447/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accesibility to hydraulic excavator through land and water bodies having minimum width greater than 10 metre
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
OD23449/2025-2026:Providing and fixing 15cm wide, 45 cm overall semi circular PVC Gutter pipe with iron<br>brackets 40x3mm size bolts,nuts and washers etc.including making necessary connections with rain water<br>pipes complete.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
11.37:Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete
OD23445/2025-2026:Providing and laying exterior floor tiles of size 300x300 mm (thickness to be specified<br>by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in colours such as White,<br>Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), including pointing the joints with white cement and matching pigment etc., complete.
13.53.1:Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to given an even shade:New work (two or more coats) including coat of approved steel primer but excluding a coat of mordant solution.
OD30841/2025-2026:Providing and fixing a name board of size 100 cm x 60 cm, fabricated from sheet metal, and installed at an appropriate location visible to the public. The board shall display the name of the boat jetty and other details as directed by the departmental officers at site, complete in all respects, including all labour, materials, and accessories required for the work
Reataining wall
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
MUHAMMAD ALI T K (BID ID -2430689)
Bidder Name
MUHAMMED BASHEER
MUHAMMAD ALI T K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1371903.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1371903.xls
BOQ • 0.27 MB
sbd.pdf
Tender Documents • 3.59 MB
nit.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid