Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAdmitted-Finance NOT AVAILABLE | ₹14.4 L | L1 | Admitted-Finance |
| 2 | L2₹15.1 LAdmitted-Finance | ₹15.1 L | L2 | Admitted-Finance |
| 3 | L3₹15.2 LAdmitted-Finance | ₹15.2 L | L3 | Admitted-Finance |
| 4 | L4₹15.3 LAdmitted-Finance | ₹15.3 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical HARDAHA BALUWA VARANASI CHANDAULE | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | R.A.V. BUILDERS AND CONSULTANT L3 | M/S M W CONSTRUCTIONS L2 | S S CONSTRUCTION COMPANY L1 | Shah Alam L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 110.67 | CUM | 40 ₹4,426.80 | 57.12 ₹6,321.47 | 52.93 ₹5,857.76 | 57.8 ₹6,396.73 |
| 2.00 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 16.26 | CUM | 4,500 ₹73,170 | 5,008.75 ₹81,442.28 | 4,642.03 ₹75,479.41 | 5,068.32 ₹82,410.88 |
| 3.00 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 7.5 | CUM | 4,000 ₹30,000 | 4,849.99 ₹36,374.93 | 4,494.9 ₹33,711.75 | 4,907.73 ₹36,807.98 |
| 4.00 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 77.55 | CUM | 5,850 ₹4.5 L | 4,970.99 ₹3.9 L | 4,438.38 ₹3.4 L | 5,030.17 ₹3.9 L |
| 5.00 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 62.72 | SQM | 100 ₹6,272 | 86.85 ₹5,447.23 | 80.49 ₹5,048.33 | 87.89 ₹5,512.46 |
| 6.00 | Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | 66.18 | SQM | 250 ₹16,545 | 575.4 ₹38,079.97 | 533.27 ₹35,291.81 | 582.25 ₹38,533.31 |
| 7.00 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 7.31 | CUM | 6,800 ₹49,708 | 6,072.99 ₹44,393.56 | 5,628.36 ₹41,143.31 | 6,145.28 ₹44,922 |
| 8.00 | Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 6.2 | CUM | 7,000 ₹43,400 | 6,254.13 ₹38,775.61 | 5,796.24 ₹35,936.69 | 6,328.59 ₹39,237.26 |
| 9.00 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 5.7 | SQM | 30 ₹171 | 34.98 ₹199.39 | 32.42 ₹184.79 | 35.4 ₹201.78 |
| 10.00 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work | 15.4 | RM | 1,500 ₹23,100 | 1,571.76 ₹24,205.10 | 1,456.69 ₹22,433.03 | 1,590.45 ₹24,492.93 |
Tender Value
₹18.6 L
EMD Value
₹37,200
Closing Date
2 Apr 2026, 5:00 pmClosed
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
Construction Of V.R.B At Km. 7.940 Of Dhakiya Dy. under Project M.G.C. Stage-II IN DIST MORADABAD
2026_UPIDC_1130901_12
09/EE/2025-26
Open Tender
Civil Works - Canal
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹37,200
21 May 2026
27 Mar 2026
3 Apr 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | |||||
| 2Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | |||||
| 3Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 4Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | |||||
| 5Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | |||||
| 6Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | |||||
| 7Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 8Laying of reinforeced cement concrete in M25 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | |||||
| 9S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | |||||
| 10Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.93 MB
TD12.pdf
Tender Documents • 2.70 MB
BOQ_2109878.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid