Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.2 LAccepted-AOC AT KANDSAR P O BAHIMAR P S KATKAMSANDI DIST HAZARIBAG JHARKHAND | NA | NA | 835201 | L-1 | Accepted-AOC L-1 | |
| 2 | Rejected-Technical CHURCHA COLLIERY NEAR BHARTIYA VIDYA MANDIR P O CHURCHA COLLIERY DISTT KORIYA C G | CHURCHA COLLIERY | KORIYA | CHHATTISGARH | 497339 | - | Rejected-Technical L-2 BIDDER |
Tender Value
Refer Docs
EMD Value
₹17,300
Closing Date
26 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(Mining) Baikunthpur Area.
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 12 Nos. ventilation stopping to ventilate 87L West proposed depillaring panel in East Block of Churcha Mine (RO).
2022_SECL_249260_1
SECL/BKP/SO(M)/22-23/CE/eT/16 Dt.07.07.2022
Open Tender
Civil Works - Others
Item Rate
365 days
East Block of Churcha Mine (RO)
Please refer Tender document
3 documents required · 3 mandatory
₹17,300
20 Sept 2022
7 Jul 2022
29 Jul 2022
8 Jul 2022
26 Jul 2022
8 Jul 2022
8 Jul 2022 - 15 Jul 2022
Amount
Item Description/ Heading Location : 1 Dip to 12 Dip in between 86L and 87L (Work period - 365 days)
Groove cutting / floor cutting for stopping / Manhole by chisel & hammer. (a) In Hard Stone. (Grove cutting in roof and floor)
Groove cutting / floor cutting for stopping / Manhole by chisel & hammer. (d) In Coal. (Grove cutting in side in coal)
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering : 1:2:4 (1 Cement : 2 Coarse Sand (zone-III) : 4 Graded Stone aggregate 20mm normal size)
12mm cement plaster of mix : 1:6 (1 Cement : 6 Fine sand)
Loading of materials into tub in surface.
Un-loading the materials at destination point in UG.
Lead for transportation of materials by head lead up to 50m. (Average 1 lead awarded).
Mulma cleaning / removal of debris from UG galleries and cleaning of belt roadway and stacking / loading within 50m.
Total impact of GST for the purpose of CTC
M/S D P LAHIRI
stage.html
html • 0.04 MB
techsummary_257526.pdf
PDF • 0.20 MB
finsummary_257526.pdf
PDF • 0.43 MB
AOC33CE16.pdf
PDF • 2.40 MB
finance_257526.pdf
PDF • 0.26 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .