| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC CHIEF ENGINEER DRAINAGE CUM MINING AND GEOLOGY 2 | ₹1.5 Cr | L1 | Accepted-AOC low |
| 2 | L2₹1.7 Cr+₹14.6 L (9.54%)Rejected-AOC PUNJAB | HOSHIARPUR | PUNJAB | 144105 | ₹1.7 Cr+₹14.6 L (9.54%) | L2 | Rejected-AOC high |
| 3 | Rejected-Technical | - | - | Rejected-Technical insufficient bid capacity |
| 4 | Rejected-Technical LUDHIANA | - | - | Rejected-Technical insufficient bid capacity |
Tender Value
₹3 Cr
EMD Value
₹6 L
Closing Date
10 Dec 2024, 10:00 amClosed
Executive Engineer
EXECUTIVE ENGINEER ROPAR CANAL DIVISION WRD PUNJAB
Construction of Khanpur Distributary from RD 77000 to 80200 and 90300 to 99520 including raising from 72500-77000
2024_WR_129354_1
45/22A/2024-25
Open Tender
Civil Works - Canal
Item Rate
90 days
MULLAPUR DAKHA LDH
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
₹6 L
Yes
Ropar
17 May 2025
1 Nov 2024
10 Dec 2024
5 Nov 2024
10 Dec 2024
5 Nov 2024
8 Nov 2024
Amount
Ordinary jungle clearance of both banks of running distributaries,minors and drains with dischargege upto 1.5 cum/s
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metbottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Excavation of soil( any type ) using hydraulic excavator CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 60 mtr.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (a) Disposal/carraige from 0 upto 450m
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (b) Disposal/ carraige additional beyond 450m upto 1Km (Katcha) (Note: Payment for pucca portion of lead will be made @ 80%of quoted rates and payment for kutcha portion of lead will be made at full quoted rates against the item)
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (c) Disposal/carraige for every additional Km upto 10Km (Katcha) (Note: Payment for pucca portion of lead will be made @ 80%of quoted rates and payment for kutcha portion of lead will be made at full quoted rates against the item)
Carriage of Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone boulders, Kankar and building rubbish, Earth. (katcha) each Km beyond 10 Km
Carriage of Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone boulders, Kankar and building rubbish, Earth. (pucca) each Km beyond 10 Km
Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowance leads and dressing( as per earth work statement) (a) 0-1.5mt. depth
Dressing of Earth work ( NEW )
Dressing and preparation of sub grade for side slopes.
Providing and laying Cement concrete (M-15) sleepers in bed and side slopes below the joints of concrete lining mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications IN SLEEPERS
Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete
Cement concrete lining 60mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
Providing and laying Cement concrete (M-15) for coping mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply ,carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications IN COPING
Filling of construction joints with sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight-10 mm depth
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications : a) For 60 mm thick Slab of lining
Providing and laying LDPE 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
Applying Bitumen Primer on side of Lining and top of sleeper for construction joint,etc. complete in all respects
Laying of Lean Concrete M-7.5
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. (Depth 3 m to 6 m)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 With Batching Plant, Transit Mixer and Concrete Pump RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 With Batching Plant, Transit Mixer and Concrete Pump
RCC/PSC Grade M40 for t-beam & SlabWith Batching Plant, Transit Mixer and Concrete Pump height upto 5m
Applying priming coat with cement primer in all shade on newly plastered or concrete exterior surface
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade.
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other matter, dressing of sides and bottom and backfilling with excavated surplus soil Depth 0-3 mtr
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 With Batching Plant, Transit Mixer and Concrete Pump RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entiresurface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
compensation of earth
Laying R.C.C. 1:2:4 (M-15) batch mixed with stone ballast or shingle.
Bending binding and placing in position steel reinforcement 10 mm dia bars.
Extraforwatering theearth/flyash laid in20cm layers as per specifications for compaction.
Extra for rolling to specifications.
PCC Grade M30 Using Concrete Mixer
Water Bound Macadam Grading I (without screening for low volume Roads/undersigned Providing, laying, spreading and compacting stone aggregates of Grading I towater bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheeled roller 8-10 tonnes in stages to propergradeandcamber,applyingandbrooming requisite typeof bindingMaterials to fill up the interstices of coarse aggregate, watering and compacting to the requireddensity completeas per technical specifications
Water Bound Macadam Grading II Providing, laying, spreading and compacting stone aggregates of Grading II towater bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheeled roller 8-10 tonnes in stages to propergradeandcamber,applyingandbrooming requisitetypeofscreening/bindingMaterialstofill up the interstices of coarseaggregate, watering andcompacting to therequireddensitycomplete as per technical clause 404 of MORT&H specifications
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 in superstructure
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
10 mm thick cement plaster 1:3
Any Other Items
BALJIT SINGH GILL (BID ID -602129)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .