Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | L1 | Accepted-AOC Awarded | |
| 2 | L2₹1.1 L+₹7,870 (7.75%)Rejected-Finance AT PHUSBUNGLOW PO BHAGA DIST DHANBAD 828301 | DHANBAD | DHANBAD | JHARKHAND | 828301 | L2 | Rejected-Finance due to higher rate quoted | |
| 3 | L3₹1.1 L+₹8,180 (8.06%)Rejected-Finance | L3 | Rejected-Finance due to higher rate quoted | |
| 4 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
₹96,749
EMD Value
₹1,209
Closing Date
14 Jun 2023, 10:00 amClosed
INCHARGE AAW,KA
office of The GM, Kusunda Area
Repairing of FIP and Nozzle assy., Air compressor, Water pump assy. changing, Hour meter installation and Engine mounting replacement etc of ACE Crane Reg.No-JH10AZ 8314 of DOCP, Kusunda Area
2023_BCCL_280892_1
BCCL/KA-VI/TRPT/E-NIT/23-24/11
Open Tender
Miscellaneous Works
Item Rate
10 days
DOCP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,209
Yes
21 Jun 2023
5 Jun 2023
15 Jun 2023
5 Jun 2023
14 Jun 2023
5 Jun 2023
Amount
Reapir work of ACE Crane
Jobs to be done: 1. Complete water pump assy. removing and new water pump assy. fitting. 2. Engine tappet cover removing, gasket changing, tappet adjusting & setting and fitting. 3. Engine manifold gasket removing, changing and fitting. 4. Complete FIP and Nozzle assy. removing, FIP overhauling and calibration, Nozzle calibration, testing and fitting. 5. Complete Air compressor dismantling and refitting after air compressor cylinder block, cylinder head, Piston with ring & kit removing and changing. 6. Engine mounting with bolt removing, changing and fitting. 7. Stop cable to be replaced. 8. Accelerator cable complete removing, changing and fitting. 9. Diesel, Mobil and hydraulic filter to be replaced. 10. Hour meter supply and installation. Materials required:- Water pump assy. 01 No, Engine tappet cover gasket 01 No, Engine tappet rocket liver 02 Sets, Engine tappet cover bolt 02 No’s, Engine manifold gasket 01 Set, FIP Plunger 04 No’s, FIP Roller bearing 02 No’s, FIP Thrust Bearing 01 No, FIP Service kit 01 Set, FIP fly weight 01 No, Nozzle 04 Sets, FIP Nozzle pipe 02 No’s, Air Compressor repair full kit 01 Set, Air compressor cylinder block 01 No, Air compressor connecting rod with cap 01 No, Air compressor bearing 01 Set, Air compressor bolt nut 04 No’s, Engine mounting with bolt 02 Sets, Diesel & Mobil filter 01 Set, Hydraulic filter 01 No, Stop cable 01 Set, Accelerator cable 01 Set etc. Repairing work should be completed with all required materials and manpower.
Total impact of GST for the purpose of CTC
Naz Automobile and Tyre Repairing Works
R A AUTO WORKS
M/s R.K CASTING AND ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_290813.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .