| 1.00 | Upgradation of the road from (MRL-13) Thirupanjeeli-Silaiyathi via Sunaipuganallur Km 0/0-3/8Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 4,055.94 | m2 | - | - |
| 2.00 | PICKING BT Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.n Km. 0/0 - 3/800 | 4,694.38 | m2 | - | - |
| 3.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3'KM.0/000-1/000 | 81.33 | m3 | - | - |
| 4.00 | KM.1/000-2/000 | 27.15 | m3 | - | - |
| 5.00 | KM.2/000-3/000 | 51.98 | m3 | - | - |
| 6.00 | KM.3/000-3/800 | 58.45 | m3 | - | - |
| 7.00 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth) | 81.33 | m3 | - | - |
| 8.00 | KM.1/000-2/000 | 27.15 | m3 | - | - |
| 9.00 | KM.2/000-3/000 | 51.98 | m3 | - | - |
| 10.00 | KM.3/000-3/800 | 58.45 | m3 | - | - |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
11 Jun 2020, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Up gradation of 1 road in Mannachanallur Block in Tiruchirappalli District under PMGSY III Batch I 2019-20 Package No.TN22-156
2020_RDTN_92410_1
TN22156
Open Tender
Civil Works - Roads
270 days
Tiruchirappalli
As per schedule
5 documents required · 5 mandatory
₹0
₹2.5 L
DRDA Tiruchirappalli
24 Jun 2020
14 May 2020
11 Jun 2020
14 May 2020
11 Jun 2020
14 May 2020
27 May 2020
Amount
Upgradation of the road from (MRL-13) Thirupanjeeli-Silaiyathi via Sunaipuganallur Km 0/0-3/8Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
PICKING BT Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.n Km. 0/0 - 3/800
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3'KM.0/000-1/000
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 'KM.0/000-1/000
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)'KM.0/000-1/000
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
PRIMER COAT Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 'KM.0/000-1/000
TACK COAT Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.KM.0/000-1/000
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.'KM.0/000-1/000
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 'KM.0/000-1/000
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 0.60 X 3.75 X 0.25 = 2.81 'KM.0/000-1/000
Providing and Fixing 'Logo' of PMGSY project
Providing and Fixing 'Citizen information Board' of PMGSY project
Providing and fixing 'Maintanence information Board' of PMGSY Project
Providing and Fixing Name board of PMGSY project
Providing and fixing of cautionary, mandatory and in formatory sign Board Providing and fixing of Retro Reflectorised Cautionary, Mandatory signs with definition plate made out of high intensity Grade prismatic sheeting coiformation to IRC-67:2010 & ASTM D, Type IVspecification and fixed over 1.5mm thick Aluminium sheet fixed on back support frame of 25mm x 25mm x3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm below ground level etc complete including 7years warrenty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 specification(as per MORT & spec. No. 801) 90CM Equilateral Trainagle (Cautinary) Sign Board
60CM Circular (Mandatory) Sign Board
Chevron Signs 90Cm Octagon (Curves)
Reflector
Kilometre stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification Clause 1703
ii) 200m Stone
Protective works arrangements CH 1100 LHS,RHS Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.Protective works @ Ch. 1100 LHS
Protective works @ Ch. 1100 RHS
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.Protective works @ Ch. 1100 LHS
Protective works @ Ch. 1100 RHS
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.Protective works @ Ch. 1100 LHS
Protective works @ Ch. 1100 RHS
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing Protective works @ Ch. 1100 LHS
Protective works @ Ch. 1100 RHS
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall Protective works @ Ch. 1100 LHS
Protective works @ Ch. 1100 RHS
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7 Protective works @ Ch. 1100 LHS
Protective works @ Ch. 1100 RHS
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RENGASAMY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
TechnicalBid156.pdf
Tender Documents • 0.64 MB
PriceBid156.pdf
Additional Documents • 0.13 MB
BOQ_158452.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid