Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹29.0 L+₹28,686 (1.00%)Rejected-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | L2 | Rejected-Finance L2 | |
| 3 | L3₹29.2 L+₹47,810 (1.67%)Rejected-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | - | Rejected-Technical Non Responsive |
Tender Value
₹31.9 L
EMD Value
₹63,800
Closing Date
2 Jan 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
C/o Link road to Harizan Basti Dhadi village Fatoh km 0/00 to 0/230 SH Formation Cutting in km 0/00 to 0/130,Hume Pipe Culvert at RD 0/010 and Retaining Wall at RD 0/010 to 0/080 and metalling and Tarring at RD 0/00 to 0/130 under DMFT
2025_PWD_124399_10
11772-78 dated 23/12/2025
Open Tender
Civil Works
Percentage
60 days
GHUMARWIN
AS PER SBD
12 documents required · 12 mandatory
₹2,000
₹63,800
Yes
27 Jan 2026
26 Dec 2025
3 Jan 2026
26 Dec 2025
2 Jan 2026
26 Dec 2025
26 Dec 2025 - 2 Jan 2026
Cuting in earth work for road formation in all heights and depths in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary oil ,soft rocks,hard rocks,chiseling/wedging out of rock (where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines,graded with cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-charge at site according to the M.O.R.D. technical specification clause 1603.1 and sorting out useful material and stacking the same in all leads and lifts in acquired width of the road and transportation of unuseful material for filling in road,ways,camber, embankments for grade improvements and disposal of all in useful materials to required width of the road or approved dumping sites by Engineer-in-charge through all modes of transportation including head load or animals transport or mechanical means,along with its leveling fine dressing using machineries,materials, tools equipments and safety measures and incidentals necessary to complete the work by mechanicalmeans and/or labour if required.Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per direction of Engineer-in-charge including carriage of material with in all leads and lifts. The rate are inclusive of octroi,malkana,toll tax,sale tax or other taxes imposed by the Government.A recovery of useful stones shall be affected for 21.35 m3 (Twenty one point thirty five cubic metre) at the rate of Rs.300.00 (Rupees Three hundred only) per cubic metre on pro-rata basis from each running bill for this item.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains(not exceeding 1.5m (one point five metre)in width or 10 sqm (ten square metre) on plan) , including dressing of sides and ramming of bottoms, lift upto 1.5 m (one point five metre), including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m (fifty metre) including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and Laying cement concrete 1:5:10 nominal mix ( One Cement is to five Sand is to Ten graded crushed stone aggregrate.) 40mm ( forty milimetre) nominal size with minimum cement contents 130 kg (One hundred thirty kilogram) per cubic metre and curring complete . including cost of form work for plain /reinforce concrete in retaining walls, breast wall as per drawing and MORD tecnical specification 2014 Clause 800 and 1200 including carriage of material with in all leads and lifts ,shoring and shuttering and curring complete including pumping or bailing out water (surface and sub soil water) up to all depth and any quantum of water including cleaning of slush which may arise out during dewatering and carriage of machinery, material ,tools equipment safety measures and including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes, octroi, Malkana , Toll tax , Goods Service Tax, building and other construction work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:3:6 (one Cement is to three coarse sand is to six graded stone aggregate ) 20 mm (twenty millimetre) nominal size including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (one cement is to two fine sand) including testing of joints etc complete :900 mm (nine hundred millimetre) dia. R.C.C. pipe including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing weepholes in brick masonry/stone masonary/plain reinforced concrete abutment wing wall, return wall with 100mm (one hundred millimetre ) dia PVC pipes extending through the full width of the structures with slope of 1 (v): 20 (H) towards drawing face complete as per drawing and technical specification clauses 709, 1206.6. including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Back filling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 302.3.12,305.3.9,1604.7 of MORD specification, including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Banking excavated earth in layers not exceeding 20 cm (twety centimetre) in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 (eight) tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m (fifty metre) and lift upto 1.5 mtr (one point five metre) . All kinds of soil including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I size range 75 mm to 0.075 mm (seventy five to zero point zero seven five millimetre) having CBR Value-30 (thirty) including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing, laying, spreading and compacting graded stone aggregate [size range 53 mm to 0.075 mm(fifty three millimetre to zero point zero seven five millimetre) ] to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and applying prime using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. On bituminous surface @ 0.25 kg/sqm (at the rate of zero point twenty five kilogram per square metre) including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. On W.B.M / W.M.M. @ 0.25 to 30 kg/sqm (at the rate of zero point twenty five to thirty kilogram per square metre) including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing, laying and rolling of open-graded premix carpet of 20 mm (twenty millimetre) thickness composed of 13.2 mm to 5.6 mm (thirteen point two to five point six millimetre) aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. By Manual Means Bitumen (VG-30) as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 Bitumen (VG-30) as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_182871.xls
BOQ • 0.29 MB
sbd10.pdf
Tender Documents • 8.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .