Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.6 LRejected-AOC MUNDELA P O THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | ₹11.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹12.0 LRejected-Finance | ₹12.0 L | L3 | Rejected-Finance L3 |
| 4 | L4₹1.2 LRejected-Finance | ₹1.2 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | SYNERGY POWER TECH L1 | AJITH L4 | AJEESH PV L2 | DS3POWERSYSTEMS L3 |
|---|---|---|---|---|---|---|---|
| 1.00SITC of Ground Mounted Grid Tied Solar System | |||||||
| 1.00 | OD206373/2025-2026:Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 18%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. (This includes all necessary fees towards KSEB Inspectorate etc. for the commissioning and for doing all laison works) | 25 | kW | 43,999 ₹11.0 L | 48,000 ₹12 L | 46,219 ₹11.6 L | 47,888 ₹12.0 L |
Tender Value
₹12.7 L
EMD Value
₹31,779
Closing Date
11 Nov 2025, 6:00 pmClosed
AEE
pwd electrical sub division Tvpm
DEPOSIT-SITC of Solar power System-Supply, installation, testing and commissioning of Solar power System in Court complex, Neyyattinkara, Tvpm.-General Electrical Work
2025_PWD_818748_1
ESDT/ET-166/2025-26
Open Tender
Electrical Works
180 days
pwd electrical sub division Tvpm
please refer tender documents
6 documents required · 6 mandatory
₹2,760
₹31,779
30 Dec 2025
4 Nov 2025
13 Nov 2025
4 Nov 2025
11 Nov 2025
4 Nov 2025
Amount
SITC of Ground Mounted Grid Tied Solar System
OD206373/2025-2026:Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity 500 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 18%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories. d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. (This includes all necessary fees towards KSEB Inspectorate etc. for the commissioning and for doing all laison works)
AJEESH PV (BID ID -2435768)
DS3POWERSYSTEMS (BID ID -2435221)
AJITH (BID ID -2434834)
Bidder Name
AJITH
AJEESH PV
SYNERGY POWER TECH
DS3POWERSYSTEMS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1372314.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1372314.xls
BOQ • 0.30 MB
viewsbd.pdf
Additional Documents • 1.63 MB
specialconditionsmodified.pdf
Additional Documents • 0.15 MB
mom.pdf
Additional Documents • 0.82 MB
Download all tender documents and submit your bid