Tender Value
₹5.0 Cr
EMD Value
₹5.0 L
Closing Date
12 Aug 2026, 5:00 pm
Head of Department (Civil)
JRDA office, Hatia More, Dhanbad, 826001 (JH)
Construction of Shopping Center including 80 Shops and two halls in different places in Belgaria, Dhanbad
2026_JRDA_116405_1
JRDA/CIVIL/26-27/15/186 DT 15.07.2026
Open Tender
Civil Works - Bridges
Percentage
330 days
Belgaria T/s Dhanbad
As per NIT
8 documents required · 8 mandatory
₹10,000
₹5.0 L
22 Jul 2026
22 Jul 2026
14 Aug 2026
22 Jul 2026
12 Aug 2026
22 Jul 2026
22 Jul 2026 - 5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 1,934.29 | cum | 167.33 | ₹3,23,664.75 |
| 2 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 53.18 | cum | 589.51 | ₹31,350.14 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 | 236.16 | cum | 4,125.41 | ₹9,74,256.83 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 | 266.96 | cum | 5,218 | ₹13,92,997.28 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 85.38 | cum | 6,082.45 | ₹5,19,319.58 |
| 6 | Providing designation 100 A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9"x4.5"x3") in C.M. (1:6) in foundation and plinth with approved uality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 450.55 | cum | 4,375.34 | ₹19,71,309.44 |
| 7 | Providing designation 100 A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9"x4.5"x3") in C.M. (1:3) in superstrure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 0.2 | cum | 4,841.06 | ₹963.37 |
| 8 | Providing 25mm thick first class patent stone flooring (1:2:4) with stone chips in two layers, bottom layers 19mm. Thick (1:2:4)with 12mm to 6mm. Size graded stone chips and top layer 6mm. Thicks (1:2) with 6mm down stone chips, in panels including cost of curing, finishing the surface smooth by rubbing with carborandum stone, taxes and royality with all complete as per building specification and direction of E/I. | 1,276.88 | sqm | 326.6 | ₹4,17,029.01 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 581.48 | cum | 6,308.87 | ₹36,68,481.73 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 84,041.1 | kg | 88.01 | ₹73,96,457.21 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
eNIT15.pdf
Tender Documents • 0.76 MB
BOQ_157325.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].