Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr Quoted ₹3.2 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.7 Cr+₹52.9 L (16.8%)Rejected-AOC VPO CHAMBI | CHAMBA | HIMACHAL PRADESH | 176207 | ₹3.7 Cr+₹52.9 L (16.8%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.1 Cr+₹93.2 L (29.6%)Rejected-Finance | ₹4.1 Cr+₹93.2 L (29.6%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.2 Cr+₹1.0 Cr (32.3%)Rejected-Finance | ₹4.2 Cr+₹1.0 Cr (32.3%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | Vineet Sharma L4 | Smt Ganga Devi L3 | durga parasd contruction L1 | Tek Singh Raghav L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in Cutting in soil using Hydraulic excavator and tipper with disposal upto 1000 m in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 1,377.3 | cum | 90 ₹1,23,957 | 77 ₹1,06,052.1 Lowest | 395 ₹5,44,033.5 | 375 ₹5,16,487.5 |
| 2.00 | Earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas ( exceeding 30 cm in depth , 1.5 m in width as well as 10 Sqm on plan ) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m including all leads and lifts as per direction and to the entire satisfaction of Engineer in charge. All kind of soil ( including bailing out of water ) | 2,947.9 | cum | 1,350 ₹39,79,665 | 1,320 ₹38,91,228 | 75 ₹2,21,092.5 Lowest | 495 ₹14,59,210.5 |
| 3.00 | Providing rubble stone behind retaining walls / solling under floor in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 1,499.45 | cum | 2,550 ₹38,23,597.5 | 2,500 ₹37,48,625 | 1,575 ₹23,61,633.75 Lowest | 2,595 ₹38,91,072.75 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -all work upto plinth level 1:4:8 (1cement :4 sand :8 graded stone agg.40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 102.24 | cum | 7,100 ₹7,25,904 | 7,000 ₹7,15,680 | 7,195 ₹7,35,616.8 | 6,395 ₹6,53,824.8 Lowest |
| 5.00 | Prov. Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies , height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in : Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like : | 2,994.19 | Sqm | 611 ₹18,29,450.09 | 599 ₹17,93,519.81 | 195 ₹5,83,867.05 Lowest | 375 ₹11,22,821.25 |
| 6.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand:3 graded stone agg.20mm nominal size)and curing complete excluding cost of form work in walls complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | |||||||
| 6.01 | Walls (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 2,344.09 | cum | 9,100 ₹2,13,31,219 | 9,000 ₹2,10,96,810 | 8,295 ₹1,94,44,226.55 Lowest | 8,695 ₹2,03,81,862.55 |
| 7.00 | Providing and laying cement concrete work 1:3:6 (1 Cement 3 sand 6 graded stone aggrigate 20 mm nominal size & curing complete execulding the cost of form work and reinforcement for reinforced concrete work in : - Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 102.6 | cum | 7,150 ₹7,33,590 | 7,000 ₹7,18,200 | 7,525 ₹7,72,065 | 6,995 ₹7,17,687 Lowest |
| 8.00 | Providing ,Laying tor steel reinforcement for reinforced cement concrete work including bending binding straightening and placing in position complete including the cost of binding wire in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 73,466.7 | Kg | 105 ₹77,14,003.5 | 101 ₹74,20,136.7 | 85 ₹62,44,669.5 Lowest | 95.95 ₹70,49,129.87 |
| 9.00 | Providing and fixing 100 mm dia PVC pipe arrengement in weep hole including PVC Mesh in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 610.35 | Mtr. | 450 ₹2,74,657.5 | 350 ₹2,13,622.5 | 225 ₹1,37,328.75 Lowest | 295 ₹1,80,053.25 |
Tender Value
₹3.9 Cr
EMD Value
₹4.7 L
Closing Date
19 Mar 2026, 11:00 amClosed
Executive Engineer Jal Shakti Division Larji
Executive Engineer Jal Shakti Division Larji
(SH- Providing Retaining wall with skin re-inforcement , RCC Block with boulder filling ) ( Balance work)
2026_HPIPH_131371_1
EE Larji NIT NO-14270-14369 dated 12.03.2026
Open Tender
Civil Works
Item Rate
270 days
Banjar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹4.7 L
6 Aug 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Cutting in soil using Hydraulic excavator and tipper with disposal upto 1000 m in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 1,377.3 | cum | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas ( exceeding 30 cm in depth , 1.5 m in width as well as 10 Sqm on plan ) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m including all leads and lifts as per direction and to the entire satisfaction of Engineer in charge. All kind of soil ( including bailing out of water ) | 2,947.9 | cum | - | - |
| 3 | Providing rubble stone behind retaining walls / solling under floor in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 1,499.45 | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -all work upto plinth level 1:4:8 (1cement :4 sand :8 graded stone agg.40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 102.24 | cum | - | - |
| 5 | Prov. Form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring , shuttering, strutting & propping etc. with wooden battens & ballies , height of propping & centring below supporting floor to ceiling not exceeding 4 mtrs.& removal of the same for insitu reinforced concrete & plain concrete work in : Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like : | 2,994.19 | Sqm | - | - |
| 6Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand:3 graded stone agg.20mm nominal size)and curing complete excluding cost of form work in walls complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | |||||
| 6.01 | Walls (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string courses etc. from top of foundation level up to floor two level complete in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 2,344.09 | cum | - | - |
| 7 | Providing and laying cement concrete work 1:3:6 (1 Cement 3 sand 6 graded stone aggrigate 20 mm nominal size & curing complete execulding the cost of form work and reinforcement for reinforced concrete work in : - Vertical surfaces such as walls (any thickness) partitions & the like I/c attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer in charge | 102.6 | cum | - | - |
| 8 | Providing ,Laying tor steel reinforcement for reinforced cement concrete work including bending binding straightening and placing in position complete including the cost of binding wire in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 73,466.7 | Kg | - | - |
| 9 | Providing and fixing 100 mm dia PVC pipe arrengement in weep hole including PVC Mesh in all leads and lifts as per the entire satisfaction & direction of the Engineer - in - Charge | 610.35 | Mtr. | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
Form6.pdf
Tender Documents • 0.63 MB
Form8.pdf
Tender Documents • 1.30 MB
Terms.pdf
Tender Documents • 0.45 MB
BOQ_194200.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .