| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC VILL P O RANGALIKHATA DIST KOKRAJHAR BTC ASSAM | RANGALIKHATA | KOKRAJHAR | ASSAM | L1 | Accepted-AOC Awarded |
Tender Value
₹21.4 L
EMD Value
₹42,900
Closing Date
29 Jul 2024, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director of Soil Conservation
Bhumi Sangrakshan Bhavan, RG Baruah Road, Ghy - 05
Dangarkuti Gully Control Project, 2022-23 at Village Dangarkuti
2024_SCD_37893_3
Tender/NIT/Pt/2023-24/870
Open Tender
Civil Works
Item Rate
120 days
Kokrajhar
Please Refer Technical Documents
3 documents required · 3 mandatory
₹500
₹42,900
Yes
24 Jan 2025
8 Jul 2024
30 Jul 2024
8 Jul 2024
29 Jul 2024
15 Jul 2024
Amount
Part - A
Clearing & grubbing road land including uprooting rank vegetation,grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides (Above GBL)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides (BELOW GBL)
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specifications
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Turfing with sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.)
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Providing and laying hand tubewell
Providing sign board
Part - B
Clearing & grubbing road land including uprooting rank vegetation,grass, bushes, shrubs, saplings and trees of girth upto 300 mm,
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification
Earthwork in filling for construction of coffer dam with approved materials with all lifts and leads, transporting to site, spreading, grading to required slope and compacting as directed before construction of the RCC structre.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides (Above GBL)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides (BELOW GBL)
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Supplying fitting , fixing of tube well at work site
R.C.C Signboard
stage.html
html • 0.04 MB
techsummary_61577.pdf
PDF • 1.48 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_61577.pdf
PDF • 1.39 MB
Dangarkuti_Kokrajhar_AOC.pdf
PDF • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .