Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | ₹17.8 L | L1 | Accepted-AOC AAccept |
| 2 | L2₹17.8 LRejected-Finance | ₹17.8 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | CHIDAMBARAM L2 | G K Guna Bhala Sekar L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work: CONSTRUCTION OF 30000 LITRES CAPACITY OHT WITH 12.00M STAGING @ NADAYANUR H/O THIRUKKADUTHURAI PANCHAYAT | |||||
| 2.00Earthwork excavating and depositing on bank with an initial lead of 10 metres and initial lift of 2 metres in hard stiff clay, black cotton, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., SS 20B and as directed by TWAD Board Officers for foundation | |||||
| 3.00First depth of 2m | |||||
| 4.00 | For foundation | 54.08 | M3 | 264.48 ₹14,303.08 | 263.38 ₹14,243.59 |
| 5.00 | Second depth of 1m | 10.82 | M3 | 264.48 ₹2,860.62 | 263.38 ₹2,848.72 |
| 6.00 | Supply, Delivery and Filling with clean M. sand complying with standard specification including watering ramming and consolidation etc.. complete and as directed by TWAD Board Officers-for foundation. | 4.06 | M3 | 1,798.13 ₹7,293.22 | 1,797.03 ₹7,288.75 |
| 7.00 | Levelling coarse in cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing, placing, ramming, curing, finishing etc., complete and as directed by TWAD Board Officers. (Beyond 1.5 m to 4.5 m below GL) | 4.06 | M3 | 5,446.23 ₹22,089.91 | 5,445.13 ₹22,085.45 |
| 8.00Reinforced Cement Concrete using M30 Design mix with required cement, sand and 20 mm and 10 mm Machine crushed HBG stone including the cost of all materials, labour charges, mixing by using mechanical mixer machine, placing in position, lifting, vibrating by using mechanical vibrator, finishing & curing but excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges etc., TWAD Board Officers. complete and as directed by TWAD Board Officers | |||||
| 9.00Raft Beam | |||||
| 10.00 | For items 0 to 1.50m below GL | 2.41 | M3 | 9,199.07 ₹22,178.96 | 9,198.47 ₹22,177.51 |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
3 Mar 2026, 3:00 pmClosed
BDO(V.Pt), Karur
BDO(V.Pt), Karur
CONSTRUCTION OF 30000 LITRES CAPACITY OHT WITH 12.00M STAGING at NADAYANUR H/O THIRUKKADUTHURAI PANCHAYAT
2026_RDTN_666675_1
CONSTRUCTION OF 30000 LITRES CAPACITY OHT WITH 12.00M STAGING at NADAYANUR H/O THIRUKKADUTHURAI
Open Tender
Civil Works - Others
180 days
Karur Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,000
Yes
10 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
Name of the Work: CONSTRUCTION OF 30000 LITRES CAPACITY OHT WITH 12.00M STAGING @ NADAYANUR H/O THIRUKKADUTHURAI PANCHAYAT
Earthwork excavating and depositing on bank with an initial lead of 10 metres and initial lift of 2 metres in hard stiff clay, black cotton, hard red earth, shales, murrams, ordinary gravel stoney earth mixed with small sized boulders etc., SS 20B and as directed by TWAD Board Officers for foundation
First depth of 2m
For foundation
Second depth of 1m
Supply, Delivery and Filling with clean M. sand complying with standard specification including watering ramming and consolidation etc.. complete and as directed by TWAD Board Officers-for foundation.
Levelling coarse in cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing, placing, ramming, curing, finishing etc., complete and as directed by TWAD Board Officers. (Beyond 1.5 m to 4.5 m below GL)
Reinforced Cement Concrete using M30 Design mix with required cement, sand and 20 mm and 10 mm Machine crushed HBG stone including the cost of all materials, labour charges, mixing by using mechanical mixer machine, placing in position, lifting, vibrating by using mechanical vibrator, finishing & curing but excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges etc., TWAD Board Officers. complete and as directed by TWAD Board Officers
Raft Beam
For items 0 to 1.50m below GL
For items 0m to 4.5m above GL
For items 4.51m to 7.32 m above
For items above 7.32 m & up to 10.98 m from GL
For items above10.98 m & up to 14.64 m from GL
For items above14.64 m & up to 18.30 m from GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 5. 25 X 25 X 3mm for boarding laid over I type M.S. Truss of size 25x25x3 mm space at about 90cm c/c and supported by 40 mm Gl pipe (Medium) spaced at 75cm c/c etc., complete and as directed by TWAD Board Officers.
PLANE SURFACES
Below G.L.
CURVED SURFACE
Curved Surface - 0.00m to 3.30m
Curved Surface 11.85 to 12.09
CURVED SURFACE 14.75 to 14.91m
SQUARE COLOUMN
Below G.L.
Applying two coats using approved cement paint including cost of one coat of white washing, cost of all materials, labour charges, etc.,
Supplying, fabricating and placing in position of Steel rods for reinforcement including cost of steel and binding wire and labour charges etc complete for RCC works and as directed by TWAD Board Officers
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS angle for both sides and for steps at 30cm C/C welded jointed etc., for I staging from GL to 1st level brace (weight 4.5kg/m) IInd and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level-1No. and above Ground Level-4Nos. Supply and fixing of 32mm Gl pipe medium for hand rails for the Landing slab. Supplying and fixing of MS Base plate of 100mm X 100mm X 6mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers
Providing and fixing of RCC inside access ladder in RCC 1:15.3 (One cement, one and half sand and three aggregates) using 20mm HBG stone including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., complete and as directed by TWAD Board Officers
Supply, Delivery and fixing of RCC Manhole frame with cover of following size including cost of all materials, fixing of MS clamps, Bolt and nuts etc. complete and as directed by TWAD Board Officers. 0.60 x 0.60 (Heavy Duty)
Providing Gl pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting. threading, fixing and painting of Gl pipes with two coats of approved quality enamel paint etc., complete and as directed by TWAD Board officers
65mm Gl pipes
50mm Gl pipes
50mm GI Elbow
50mm x750mm GI Nipple
50mm x150mm GI Nipple
50mm GI Coupling
50mm x300mm Gl Nipple
50mm Ø GI Flange set
65mm Ø GI Flange set
65mm x300mm GI Nipple
65mm x150mm Gl Nipple
65mm Gl Reducer
65mm Gl coupler
65mmØGI Elbow
63 mm PVC Gate valve
63mmx 75mm PVC Reducer
75mm PVC Tee
63mm PVC Elbow
63mm PVC Mta
65mm Ø GM Gate valve
50mm Ø GM gate valve
Pipe liffting Charges
Supply and cost of 63 mm PVC pipe 6 KSC including all cost of materials and transport charges etc.,complete
Main line 90 mm PVC pipe 6 KSC
Delivery line 63 mm PVC pipe 4 KSC
Earth work excavation for in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification
Laying and jointig of P.V.C and G.I pipe into the trench with proper grading and alignment and all labour charges etc,, complete
90mm PVC Pipe
63mm PVC Pipe
Refilling the Pipe line trench with excavated earth other than sand complying the Standard specification etc,,complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_800845.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid