| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹2.5 L (1.78%)Admitted-Finance | ₹1.4 Cr+₹2.5 L (1.78%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹33.0 L (23.6%)Admitted-Finance | ₹1.7 Cr+₹33.0 L (23.6%) | L3 | Admitted-Finance |
| 4 | L4₹1.8 Cr+₹35.6 L (25.5%)Admitted-Finance | ₹1.8 Cr+₹35.6 L (25.5%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical DECLARATION NOT SUBMITTED |
| Sl No | Description | Qty | Unit | M/S MOHD MOHMAD KHAN L4 | M/S GRK ENGINEERING L2 | THERMOTECH ENTERPRISES L3 | ECO HVAC SOLUTIONS L1 |
|---|---|---|---|---|---|---|---|
| 1.00Up-gradation of Central Heating Systtem of CHC Sankoo by way of Design, Supply Installation, testing and Commissioning of all necessary and integral component / equipments (or deemed necessary) as described here after. The scope of work includes the supply of DSITC of HWGs, Hiwall unit, radiator panels, Circulation pumps/ pipes, insulations, specialized valves, including construction of cement concrete foundation blocks of all equipments to provide fully automatic system capable of producing and maintaining high precision indoor conditions inside the hospital building and staff quarter. Note While designing take into account of deration factors for atmospheric condition of Kargil @Alt: 2676m | |||||||
| 2.00 | Hot Water Generator
HSD Fired, Horizontal Fire Tube , Hot Water Generator fitted with combustion equipments, all boiler mountings- control panel, control valves, accessories including primary circulation pumps of suitable capacity, including chimney of required dia, externally mounted at 8mtr above ground level. or as recommended by OEM. It includes connection of water circulation pipe with common header of required size. Complete in all respect.
Job includes supply of spare burner assembly-01 No with each boiler
Boiler Capacity = 8 Lac- Kcal/ Hr | 2 | Job | 14,50,000 ₹29,00,000 | 8,75,000 ₹17,50,000 Lowest | 17,68,500 ₹35,37,000 | 17,00,000 ₹34,00,000 |
| 3.00Hot water Circulation Pumps Hot Water Circulation Mono-block Pump (secondary) complete with electric motor mounted common base frame duly grouted in cement concrete foundation along with control valves (Sluice valve NRVs of minimum PN 10 rating) of desired size and capacities, | |||||||
| 4.00 | Discharge: 60LPS at 25 m Head
Qty = 04 Nos. (1 w+ 3 S) | 1 | Job | 6,50,000 ₹6,50,000 | 4,75,000 ₹4,75,000 | 2,75,000 ₹2,75,000 Lowest | 4,00,000 ₹4,00,000 |
| 5.00 | Discharge: 15 LPS at 30 m Head
Qty = 02 Nos. (1 w+1 s) | 1 | Job | 1,55,000 ₹1,55,000 | 1,35,000 ₹1,35,000 | 1,30,000 ₹1,30,000 Lowest | 1,90,000 ₹1,90,000 |
| 6.00Gear Oil Transfer Pumps Gear Oil Transfer Pump with electric motor single phase rating along-with common base frame duly grouted in cement concrete foundation including control valves, piping from bulk hsd tank to day oil tank, complete | |||||||
| 7.00 | Discharge = 1 LPS(min) @ 12 mtr Head
Qty = 02 Job | 1 | Job | 25,000 ₹25,000 | 28,000 ₹28,000 | 24,900 ₹24,900 Lowest | 1,40,000 ₹1,40,000 |
| 8.00Soft water / Glycol Pumps Soft Water Pump complete with electric motor of 1-ɸ, 230 V, 50 Hz, 1 HP rating along with common base frame duly grouted in cement concrete foundation with required pipe. | |||||||
| 9.00 | Capacity 1 LPS (min) at 20 m Head
Qty= 02 No. | 1 | Job | 15,000 ₹15,000 Lowest | 16,000 ₹16,000 | 18,900 ₹18,900 | 55,000 ₹55,000 |
| 10.00 | Day Oil Tank
Day oil tank of 4 MM M.S plate complete with 6 KW heating unit, manhole dully covered, Gauge Glass and structural support for mounting oil tank and ladder made out of tubular MS Section Complete
Capacity = 1 kL x 02 Nos. = 2kL | 1 | Job | 85,000 ₹85,000 | 75,000 ₹75,000 | 55,000 ₹55,000 Lowest | 90,200 ₹90,200 |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
28 Sept 2023, 2:00 pmClosed
EXECUTIVE EINGINEER MECHANICAL DIVISION KARGIL
Office of Executive Engineer Mech Div Kargil
Up-gradation of Central Heating System of PHC Sankoo
2023_PWD_11147_1
MDK/e-NIT/16 of 2023-24
Open Tender
Machineries/ Mechanical Engg Items
Turn-key
30 days
CHC Sankoo
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,000
EXECUTIVE ENGINEER MECHANICAL DIVISION KARGIL
₹3.1 L
Office of Executive Engineer Mech Div Kargil
9 Oct 2023
21 Sept 2023
29 Sept 2023
21 Sept 2023
28 Sept 2023
21 Sept 2023
22 Sept 2023
Amount
Up-gradation of Central Heating Systtem of CHC Sankoo by way of Design, Supply Installation, testing and Commissioning of all necessary and integral component / equipments (or deemed necessary) as described here after. The scope of work includes the supply of DSITC of HWGs, Hiwall unit, radiator panels, Circulation pumps/ pipes, insulations, specialized valves, including construction of cement concrete foundation blocks of all equipments to provide fully automatic system capable of producing and maintaining high precision indoor conditions inside the hospital building and staff quarter. Note While designing take into account of deration factors for atmospheric condition of Kargil @Alt: 2676m
Hot Water Generator HSD Fired, Horizontal Fire Tube , Hot Water Generator fitted with combustion equipments, all boiler mountings- control panel, control valves, accessories including primary circulation pumps of suitable capacity, including chimney of required dia, externally mounted at 8mtr above ground level. or as recommended by OEM. It includes connection of water circulation pipe with common header of required size. Complete in all respect. Job includes supply of spare burner assembly-01 No with each boiler Boiler Capacity = 8 Lac- Kcal/ Hr
Hot water Circulation Pumps Hot Water Circulation Mono-block Pump (secondary) complete with electric motor mounted common base frame duly grouted in cement concrete foundation along with control valves (Sluice valve NRVs of minimum PN 10 rating) of desired size and capacities,
Discharge: 60LPS at 25 m Head Qty = 04 Nos. (1 w+ 3 S)
Discharge: 15 LPS at 30 m Head Qty = 02 Nos. (1 w+1 s)
Gear Oil Transfer Pumps Gear Oil Transfer Pump with electric motor single phase rating along-with common base frame duly grouted in cement concrete foundation including control valves, piping from bulk hsd tank to day oil tank, complete
Discharge = 1 LPS(min) @ 12 mtr Head Qty = 02 Job
Soft water / Glycol Pumps Soft Water Pump complete with electric motor of 1-ɸ, 230 V, 50 Hz, 1 HP rating along with common base frame duly grouted in cement concrete foundation with required pipe.
Capacity 1 LPS (min) at 20 m Head Qty= 02 No.
Day Oil Tank Day oil tank of 4 MM M.S plate complete with 6 KW heating unit, manhole dully covered, Gauge Glass and structural support for mounting oil tank and ladder made out of tubular MS Section Complete Capacity = 1 kL x 02 Nos. = 2kL
Expansion Tank Hot Water Expansion Tank of 4 mm M.S complete with manhole dully covered, necessary connections covered with 50 MM thick, 750 GSM Mikron (MikashaInternationl) insulation and finished with 24 Gauge Aluminium cladding and strucrural support for mounting the tank. Capaciy = 1 kL
Makeup tank Soft water tank of HDPE (tripple layer) with necessary connections Capacity 1000 Ltrs.
Mixing Tank Hot water mixing tank made of 6/8 MM M.S. Plate with dished ends, manhole. Suitable to withstand 6kg/cm2 operating pressure as per IOC specifications, dully covered and necessary connections covered insulated with 25mm thick nitrile foam with 26 Gauge aluminium cladding and complete with structural support to raise the tank at least 300 mm above finish FL.
Capacity: 3500 liters in cylindrical shape
Bulk HSD Tank (10kL) Bulk oil tank of 6/8 mm MS plate with require red stiffener, manhole dully covered along-with unit to be laid underground with allied Civil Works, as per IOC specifications, Complete with required piping connections and valves.
20000 litres, horizontal cylindrical
Hot Water Radiators Steel panel heating radiators conforming to EN442 with working pressure ranging from 10-13 bar having working temperature at 110°C , complete with Top grilles and side covers as standard along-with inlet valve, outlet valve, air purge valve and threaded plug as per OEM. Inlet Water Temp: 75oC Outlet Water Temp: 65oC Room Temp: 22oC
2000 Kcal/Hr (Type 22)
3000 Kcal/Hr (Type 33)
4000 Kcal/Hr (Type 33)
Hydronic Highwall unit Hydronic Highwall unit (to be installed in corridor) complete with inlet and outlet valve , Y-strainer, switch sockets, wringing complete to be controlled from the boiler room. Capacity = 1.50 TR
MS ERW pipe (resin bonded fiber glass insulation) MS C-class pipe as per IS-1239 & IS 3589 pipe of following nominal size with necessary clamps, vibration isolators and fitting (but excluding valves, stationers, gauges etc). duly insulated with 80kg/cum design resin bonded fibre glass or 144 kg/cum mineral wool (non combustible) pipe section insulation covered with alyer of 120gm/sqm polythene sheet (vapor barrier) and finally applying 0.63 aluminum sheet cladding complete with type3, grade 1 roofing feltstrip at joints and repair to the damage to building etc as per specifications as required. Including valves, strainers as per requirement.
150 mm DIA (50mm insulation)
100 mm DIA (50mm insulation)
75 mm DIA (50mm insulation)
50 mm DIA (50mm insulation)
40 mm DIA 50mm insulation)
MS ERW pipe (resin bonded fiber glass insulation) along with MS GI casing pipe of required dia. to be laid under trenches at depth of 450mm below ground level at cement concrete block at c/c 3mtr.
150 mm DIA (50mm insulation)
80 mm DIA (50mm insulation)
Heavy Duty PP-R pipe, 3-Layer, PP-R pipe for hot and cold water supply, conforming to IS 15801, DIN 8077 of PN16/SDR7.4, Complete with joints and fittings, exposed or concealed fitting including wall clamps and making good the wall as per site condition and direction of site engineer
40mm Dia
32 mm Dia
20 mm Dia
Control valves (min pn 10 rating) Industrial type Pressure Gauges Glycerine fillied as per specifications (0-20 Kg/sqcm.) = 04 Nos. Industrial type Digital Thermometer as per specifications (100 mm Dial) = 04 Nos. Air release valves = 15 Nos. Butterfly valves: 150mm = 04 Nos. 100mm= 20 Nos. 80mm = 10 Nos. 50 mm = 04 Nos. 32 mm = 04 Nos.
Electrical Control Panel & electrical Cabling Main Control Panel (2 Nos.) having separate cubicals for each equipment viz. isolation for Hot Water Generator 3 No's , DOL Starter for Hot Water Circulation Pumps 2No's , Soft Water Pumps 2 No's (1 hp each), DOL starter Softener pump 1 No and for HSD Transfer Pump 2 No's, and On-Load Change Over Switch, MCCB The control panel shall be provided with the copper bus bars dully insulated of required ratings and 3 in 1 digital Voltmeter / Ammeter / Frequency meter, indicators etc. including multi-core armored copper conductor cables of required current rating from main panel board to various equipments to be laid over cable trays with appropriate clamps and fixing arrangements as per site conditions. The current rating/sizes of electrical components of panel shall be in accordance with respective electrical loads of boilers/pumps etc.
Earthing Earthing Pit Earthing for various equipments inside boiler house using copper plate electrode of size 500 x 500x 3 mm placed in 1000 x 1000x 1800 mm pit filled with charcoal & salt by copper strip of size 20 x 3 mm alongwith perforated G.I pipe. Earthing Strip Copper strip of size 15x3 mm from earthing electrode to the Electric Panel, Stabilizer, boiler and pumps using proper fasteners concealed under floor.
Coolant Providing and filling of Nontoxic antifreeze Coolant IOCL Servo Kool Plus
Water Softener Plant Fully automated water softener plant of steel body with accessories viz softener pump and required connection. Cap: 1000-1500 ltr/Hr.
Systematic dismantling of current equipment, including boilers, pumps, tanks, panels, radiators, FCUs, circulation pipes, etc., and ensuring their transportation up-to Divisional Store at Kargil and secure storage in accordance with guidance from the site engineer including make good of all damages to existing structures.
High wall mounted Split Air Conditioner Unit (Hot & Cold) along-with its allied accessories and mountings /wirings/control switches, voltage stabilizer of required capacity complete in all respect. The units shall be equipped with advanced features like remote-controlled operation, controllable flap LCD, timers, dehumidification, and other innovative functionalities, in line with the latest trends. Cap= 1.5TR
Renovation and Repair to operator room: Operator Room (11’x12’) x 2 Nos. Install wooden paneling on walls and roof with polishing. Lay premium wooden flooring. Apply high-quality wall-to-wall carpeting. Complete electrification. Bathroom (5’x6’): Replace plumbing and fixtures. Tile walls and floor. Install washbasin Complete electrification Install a 25-liter geyser of reputed make. Kitchen: Install a new kitchen sink with cabinet. Fridge 183 ltr (LG/Samsung) Install an instant geyser.
M/S GRK ENGINEERING
THERMOTECH ENTERPRISES
M/S MOHD MOHMAD KHAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .