Tender ID
Tender Value
₹41.8 L
EMD Value
₹83,700
Closing Date
28 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
TRACTION
20 conditions · 5 needing a document upload
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. In case of Partnership firm / Joint Venture (JV) / Hindu Undivided Family(HUF) / Limited Liability Partnership(LLP)or Partners of Partnership firm/LLP/etc., the firm should submit the valid Power of Attorney, Partnership Deed/Article of Association/Memorandum of Association, Board of Resolution, Certificate of Incorporation along with the tender. If the firm is sole proprietor firm, the bidder should submit the supporting document of sole proprietorship firm.
tenderer should quote his offer along with GST and other taxes
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For all the tenders having advertised cost of Rs 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement. The tenderer shall affirm having read over and agreed to the terms and conditions of the LC option. ivThe above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract. (The Tenderer should be submit his/their opinion for taking payment through letter of credit (LC) arrangement).
The Bid Security shall be rounded off to the nearest 100. This Bid Security shall be applicable for all modes of tendering. Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security detailed above. Labour Cooperative Societies shall submit only 50% of above Bid Security detailed above. Subject to exemptions provided above document, the tender must be accompanied by a Bid Security as mentioned, failing which the tender shall be summarily rejected.
The tenderer shall submit along with the tender document, documents in support of his/their claim to fulfill the eligibility criteria as mentioned in the tender document. Each page of the copy of documents/certificates in support of credentials, submitted by the tenderer, shall be self-attested/digitally signed by the tenderer or authorized representative of the tendering firm. Self-attestation shall include signature, stamp and date (on each page). Only those documents which are declared explicitly by the tenderer as "documents supporting the claim of qualifying the laid down eligibility criteria", will be considered for evaluating his/their tender.
A certificate may be uploaded along with the offer that the Tenderer(s) has/have gone through all the conditions of contract and rates, specifications, etc. embodied in Indian Railway Standard General Condition of Contract-2022 with correction Slips up to the date of closing of the tender.
1.The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the Railway there under. 2.a) In case of any information submitted by tenderer is found to be false forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Bid Security besides banning of business for a period of upto five years. (b) In case of any information submitted by tenderer is found to be false forged or incorrect after the award of contract, the contract shall be terminated. Bid Security, Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto five years.
FAMILARISATION: Tenderer should visit the site of the above works and have familiarized him self/them selves of the working conditions therein in all respects and in particular the following: 1. Topography of the area, 2. Conditions at the site of work, 3. Availability of local labour, both skilled and un skilled and the prevailing labour rate, 4. Availability of Water and Electricity, 5. The existing roads and access to the site of work, 6. Availability of space for putting labour camps, offices, stores, go down, engineering yard etc. NOTE: The FAMILARISATION certificate shall be submitted by the tenderer as per format attached at Annexures.
The tenderer should go through all the eligibility conditions (like Special Technical Criteria, Standard Technical Criteria, Standard Financial criterial etc.) as mentioned in the document and submit relevant documents and fill the enclosed formats/annexures in support of the condition. All the documents should be in legible format.
TRD works at VGCB in connection with modification of OHE for both Line -10 & Line -11 tracks to carryout wagon tarpaulin covering during loading operation in Visakhapatnam & TRD works for Construction of 02 LHS at km 438/46-49 to RYD between BCHL-KRDL stations & Provision of High-level platforms at ARAKU valley station in KK-I section of Waltair Division.
WAT-TRD-12-61-79DT060126~ECOR
WAT-TRD-12-61-79DT060126
Open
Works - General
11 Months
Visakhapatnam, Andhra Pradesh
₹0
₹83,700
28 Jan 2026
6 Jan 2026
14 Jan 2026
165 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 41,82,078.23 | ||
| — | 0.20 | — | — | ||
| Preparation of Design & drawing for OHE | — | — | — | 3,869.2 | |
| — | 95.00 | — | — | ||
| Concrete for foundation & plinth in other than hard and rocky soil | — | — | — | 7,23,995 | |
| — | 10.30 | — | — | ||
| Supply of Traction Mast | — | — | — | 10,67,038.8 | |
| — | 6.00 | — | — | ||
| Erection of Traction Mast (in PB) | — | — | — | 79,404 | |
| — | 4.30 | — | — | ||
| Erection of Traction Mast (in NPB) | — | — | — | 27,838.2 | |
| — | 1.80 | — | — | ||
| Supply of Small Part Steel | — | — | — | 2,46,263.4 | |
| — | 0.95 | — | — | ||
| Erection of Small Part Steel (in PB) | — | — | — | 11,129.25 | |
| — | 0.85 | — | — | ||
| Erection of Small Part Steel (in NPB) | — | — | — | 4,802.5 | |
| — | 16.00 | — | — | ||
| Supply of single bracket assembly for conventional OHE with SPS | — | — | — | 4,32,176 | |
| — | 11.00 | — | — | ||
| Erection of single bracket assembly for conventional OHE with SPS (in PB) | — | — | — | 26,345 | |
| — | 5.00 | — | — | ||
| Erection of single bracket assembly for conventional OHE with SPS (in NPB) | — | — | — | 8,105 | |
| — | 16.00 | — | — | ||
| Porcelain Stay arm Insulator (CD 1050) | — | — | — | 45,312 | |
| — | 16.00 | — | — | ||
| Porcelain Bracket Insulator (CD 1050) | — | — | — | 45,312 | |
| — | 2.00 | — | — | ||
| Porcelain 9-Ton Insulator | — | — | — | 7,552 | |
| — | 2.00 | — | — | ||
| Supply of Solid core cut-in-Insulator : Compenent | — | — | — | 6,060 | |
| — | 1.00 | — | — | ||
| Erection of Solid core cut-in-Insulator- Component (in PB) | — | — | — | 2,610 | |
| — | 1.00 | — | — | ||
| Erection of Solid core cut-in-Insulator- Component (in NPB) | — | — | — | 1,102 | |
| — | 2.00 | — | — | ||
| Supply of Solid core suspension Insulator - Component | — | — | — | 7,896 | |
| — | 1.00 | — | — | ||
| Erection of Solid core suspension Insulator - Component (in PB) | — | — | — | 2,623 | |
| — | 1.00 | — | — | ||
| Erection of Solid core suspension Insulator - Component (in NPB) | — | — | — | 1,417 | |
| — | 2.00 | — | — | ||
| Supply of Guy rod assembly including mast anchor/guy rod attachment. | — | — | — | 32,992 | |
| — | 1.00 | — | — | ||
| Erection of Guy rod assembly including mast anchor/guy rod attachment (in PB) | — | — | — | 2,424 | |
| — | 1.00 | — | — | ||
| Erection of Guy rod assembly including mast anchor/guy rod attachment (in NPB) | — | — | — | 1,185 | |
| — | 2.00 | — | — | ||
| Supply of Component for Termination of single conductor of OHE | — | — | — | 34,860 | |
| — | 1.00 | — | — | ||
| Erection -Termination of single conductor of OHE (in PB) | — | — | — | 2,471 | |
| — | 1.00 | — | — | ||
| Erection - Termination of single conductor of OHE (in NPB) | — | — | — | 1,228 | |
| — | 30.00 | — | — | ||
| Supply of Structure Bond. | — | — | — | 21,420 | |
| — | 30.00 | — | — | ||
| Erection of Structure Bond | — | — | — | 2,220 | |
| — | 30.00 | — | — | ||
| Supply of Longitudinal Bond (C-Bond for X-over) | — | — | — | 16,620 | |
| — | 30.00 | — | — | ||
| Erection of Longitudinal Bond (C-Bond for X-over) | — | — | — | 2,010 | |
| — | 30.00 | — | — | ||
| Supply of Transverse/ Special Bond | — | — | — | 22,530 | |
| — | 30.00 | — | — | ||
| Erection of Transverse/ Special Bond | — | — | — | 2,370 | |
| — | 16.00 | — | — | ||
| Transfer of equipment from one Mast/ Support to another/ same mast or support in PB | — | — | — | 1,19,952 | |
| Each Span | 23.00 | — | — | ||
| Slewing of OHE in PB | — | — | — | 5,26,148 | |
| Each Span | 5.00 | — | — | ||
| Slewing of OHE in NPB | — | — | — | 48,485 | |
| Each Span | 33.00 | — | — | ||
| Adjustment of existing OHE | — | — | — | 17,886 | |
| Each Span | 50.00 | — | — | ||
| Tower wagon checking | — | — | — | 27,100 | |
| — | 10.00 | — | — | ||
| Supply of Contact wire splice | — | — | — | 11,330 | |
| — | 7.00 | — | — | ||
| Erection of Contact wire splice (in PB) | — | — | — | 65,856 | |
| — | 3.00 | — | — | ||
| Erection Contact wire splice (in NPB) | — | — | — | 14,550 | |
| — | 8.00 | — | — | ||
| Supply of Catenary splice | — | — | — | 5,000 | |
| — | 6.00 | — | — | ||
| Erection of Catenary splice (in PB) | — | — | — | 52,272 | |
| — | 2.00 | — | — | ||
| Erection of Catenary splice (in NPB) | — | — | — | 8,562 | |
| — | 12.00 | — | — | ||
| Dismantling of Mast/ Structure upright etc. (by cutting) In PB | — | — | — | 1,02,948 | |
| — | 2.00 | — | — | ||
| Dismantling of Mast/ Structure upright etc. (by cutting) In NPB | — | — | — | 8,594 | |
| — | 1.20 | — | — | ||
| Dismantling of Small parts steel In PB | — | — | — | 16,692 | |
| — | 0.62 | — | — | ||
| Dismantling of Small parts steel In NPB | — | — | — | 3,858.88 | |
| — | 4.00 | — | — | ||
| Retrival of Mast / TTU from Solid Core foundations without damage or leaning of Mast In PB | — | — | — | 49,152 | |
| — | 5.00 | — | — | ||
| Retrival of Mast / TTU from Solid Core foundations without damage or leaning of Mast In NPB | — | — | — | 30,365 | |
| — | 40.00 | — | — | ||
| Dismantling of any type of bond | — | — | — | 2,240 | |
| — | 1.00 | — | — | ||
| Dismantling of Guy Rod Assembly In PB | — | — | — | 2,163 | |
| — | 1.00 | — | — | ||
| Dismantling of Guy Rod Assembly In NPB | — | — | — | 1,110 | |
| — | 10.00 | — | — | ||
| Dismantling of existingcaution Boards in NPB | — | — | — | 1,890 | |
| — | 20.00 | — | — | ||
| Dismantling of C/G/ATJ/Al. Jumper with PG clamps | — | — | — | 4,400 | |
| — | 2.00 | — | — | ||
| Supply of Single Earth Electrode | — | — | — | 8,800 | |
| — | 2.00 | — | — | ||
| Erection of Single Earth Electrode | — | — | — | 5,138 | |
| — | 20.00 | — | — | ||
| Dropper wire(5 mm) | — | — | — | 3,940 | |
| — | 20.00 | — | — | ||
| Supply of 50 x 6 mm MS Flat | — | — | — | 4,600 | |
| — | 10.00 | — | — | ||
| Laying of 50 x 6 mm MS Flat in the Ground | — | — | — | 930 | |
| — | 10.00 | — | — | ||
| Laying of 50 x 6 mm MS Flat exposed | — | — | — | 860 | |
| — | 31.00 | — | — | ||
| "PVC Sleeve of 3 to 5 mm thickness suitable for Structure Bond of M.S. Flat of size 40x6 mm. IS 5831:1984" | — | — | — | 1,829 | |
| — | 15.00 | — | — | ||
| Supply of Retro reflective Caution Board for 25KV Traction | — | — | — | 11,580 | |
| — | 15.00 | — | — | ||
| Erection of Retro reflective Caution Board for 25KV Traction | — | — | — | 1,065 | |
| — | 15.00 | — | — | ||
| Supply of Retro reflective Danger Board for 25KV | — | — | — | 11,580 | |
| — | 15.00 | — | — | ||
| Erection of Retro reflective Danger Board for 25KV | — | — | — | 1,065 | |
| — | 2.00 | — | — | ||
| Supply of Retro reflective Caution Board (Un-wired Turn-out) | — | — | — | 4,516 | |
| — | 2.00 | — | — | ||
| Erection of Retro reflective Caution Board (Un-wired Turn-out) | — | — | — | 726 | |
| — | 12.00 | — | — | ||
| Supply of Retro reflective Public Caution Board. In three languages | — | — | — | 18,300 | |
| — | 12.00 | — | — | ||
| Erection of Retro reflective Public Caution Board. In three languages | — | — | — | 1,632 | |
| — | 2.00 | — | — | ||
| Supply of Retro reflective Elect.Engine Stop Board | — | — | — | 4,360 | |
| — | 2.00 | — | — | ||
| Erection of Retro reflective Elect.Engine Stop Board | — | — | — | 572 | |
| — | 5.00 | — | — | ||
| Supply of Electric Shock Treatment Chart. | — | — | — | 15,650 | |
| — | 5.00 | — | — | ||
| Erection of Shock Treatment Chart. | — | — | — | 1,235 | |
| — | 26.00 | — | — | ||
| Supply of Retro Reflective Number Plates | — | — | — | 28,990 | |
| — | 26.00 | — | — | ||
| Erection of Retro Reflective Number Plates | — | — | — | 1,586 | |
| — | 4.00 | — | — | ||
| Supply of Retro reflective Sigma Sign Board | — | — | — | 3,728 | |
| — | 4.00 | — | — | ||
| Erection of Retro reflective Sigma Sign Board | — | — | — | 188 | |
| — | 4.00 | — | — | ||
| Supply of catenary wire ending clamps | — | — | — | 2,216 | |
| — | 4.00 | — | — | ||
| Erection of catenary wire ending clamps | — | — | — | 220 | |
| — | 4.00 | — | — | ||
| Supply of Contact wire ending clamps | — | — | — | 1,228 | |
| — | 4.00 | — | — | ||
| Erection of Contact wire ending clamps | — | — | — | 124 | |
| — | 6.00 | — | — | ||
| Erection o f contact wire under FOB & splicing with catenary by means of ending clamps | — | — | — | 31,686 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Scopeofwork.pdf
ATTACHMENT
Tenderconditions.pdf
ATTACHMENT
AnnexureI.pdf
ATTACHMENT
AnnexureVVA.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .