Tender Value
₹43.6 L
EMD Value
₹50,000
Closing Date
31 Aug 2026, 5:00 pm4d left
Chairman and Managing Director KPHCC
KERALA POLICE HOUSING AND CONSTRUCTION CORPORATION LTD CHANDRASEKHARAN NAIR STADIUM, PALAYAM, THIRUVANANTHAPURAM - 695033
XVFC SCHEME I (FY 2023-24) -Construction of New Building for JAK Chambakkulam in Alappuzha District (DSR 2021)
2026_KPHCC_866672_1
NIT No.30/KPHCC/2026-27
Open Tender
Civil Works - Buildings
Item Rate
330 days
Alappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
₹50,000
24 Aug 2026
24 Aug 2026
2 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK UP TO PLINTH LEVEL | |||||
| 1.001 | 65.7
Hydraulic excavator. | - | Day | - | - |
| 1.002 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. | 0.2 | cum | - | - |
| 1.003 | 60.64.1
Coconut Pile - Supplying and stacking well matured straight coconut post for driving
down throug various strata bellow bed level including cost coveyance labour charges
etc complete. | - | metre | - | - |
| 1.004 | 51.2.3
Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade. | - | cum | - | - |
| 1.005 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.006 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 1.007 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| 1.008 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.009 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels,beams, plinth beams, girders bressumers and cantilevers. | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tendernotice_2.pdf
PDF • 0.69 MB
tenderdocumentnew.pdf
Tender Documents • 0.64 MB
BOQ_1466904.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].