Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 CrAccepted-AOC | ₹6.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 Cr+₹20.3 L (2.96%)Rejected-Finance S A 6 149 D 3 SHIV BIHAR COLONY AKTHA PAHADIYA VARANASI | AMBEDKAR NAGAR | UTTAR PRADESH | 224122 | ₹7.1 Cr+₹20.3 L (2.96%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.2 Cr+₹33.4 L (4.86%)Rejected-Finance | ₹7.2 Cr+₹33.4 L (4.86%) | L3 | Rejected-Finance L3 |
| 4 | L4₹7.3 Cr+₹44.8 L (6.51%)Rejected-Finance FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | ₹7.3 Cr+₹44.8 L (6.51%) | L4 | Rejected-Finance L4 |
| 5 | L5₹8.2 Cr+₹1.4 Cr (19.9%)Rejected-Finance | ₹8.2 Cr+₹1.4 Cr (19.9%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Ramesh Tiwari L2 | M/s Raja Ram Shukla Contractor L5 | RAM NARAYAN YADAV L3 | Radheshyam Dubey L1 | PRATAP CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismentaling of R.C.C.work including stacking of dismental material including all cost of labour, material, T&P, etc. complete. | 328.05 | cum | 550 ₹1,80,427.5 | 700 ₹2,29,635 | 599 ₹1,96,501.95 | 500 ₹1,64,025 Lowest | 691 ₹2,26,682.55 |
| 2.00 | Dismentaling of Brick work in cement Mortar including all cost of labour, material, T&P, etc. complete. | 835.38 | cum | 550 ₹4,59,459 | 520 ₹4,34,397.6 | 449 ₹3,75,085.62 Lowest | 500 ₹4,17,690 | 451 ₹3,76,756.38 |
| 3.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal initial lead, lift, including all cost of labour, material, T&P, etc. complete. | 7,986.86 | cum | 55 ₹4,39,277.3 | 90 ₹7,18,817.4 | 40 ₹3,19,474.4 Lowest | 50 ₹3,99,343 | 71 ₹5,67,067.06 |
| 4.00 | Laying P.C.C. work in M10 with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | 341.56 | cum | 7,347 ₹25,09,441.32 | 9,000 ₹30,74,040 | 7,800 ₹26,64,168 | 7,337 ₹25,06,025.72 Lowest | 8,551 ₹29,20,679.56 |
| 5.00 | Centering and shuttering for P.C.C work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 161.75 | Sqm | 156 ₹25,232.22 | 201 ₹32,510.75 | 180 ₹29,114.1 | 150 ₹24,261.75 Lowest | 161 ₹26,040.95 |
| 6.00 | Centering and shuttering for R.C.C including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 5,987.76 | Sqm | 775 ₹46,40,514 | 750 ₹44,90,820 | 401 ₹24,01,091.76 Lowest | 765 ₹45,80,636.4 | 801 ₹47,96,195.76 |
| 7.00 | Laying R.C.C. work in M25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 3,415.2 | cum | 9,748 ₹3,32,91,369.6 | 11,200 ₹3,82,50,240 | 9,800 ₹3,34,68,960 | 9,741 ₹3,32,67,463.2 | 9,551 ₹3,26,18,575.2 Lowest |
| 8.00 | Reinforcement with carriage, cutting, bending,binding & placing in position including cost of binding wire,labours,T&P etc all complete. | 411.46 | M.T | 57,574 ₹2,36,89,398.04 Lowest | 67,500 ₹2,77,73,550 | 67,740 ₹2,78,72,300.4 | 57,574 ₹2,36,89,398.04 Lowest | 65,371 ₹2,68,97,551.66 |
| 9.00 | Dewatering work | 1 | job | 20,00,000 ₹20,00,000 | 30,65,000 ₹30,65,000 | 19,00,000 ₹19,00,000 | 5,00,000 ₹5,00,000 Lowest | 9,00,001 ₹9,00,001 |
| 10.00 | E/w for making Road Diversion & ramp in all type of soil with initial lead, lift including all cost of labour, material, T&P, etc. complete. | 16,380 | cum | 60 ₹9,82,800 | 82 ₹13,43,160 | 40 ₹6,55,200 Lowest | 50 ₹8,19,000 | 65 ₹10,64,700 |
Tender Value
Refer Docs
EMD Value
₹18 L
Closing Date
18 Apr 2026, 11:00 amClosed
SUPERINTENDING ENGINEER, DRAINAGE CIRCLE, BALLIA
SUPERINTENDING ENGINEER, DRAINAGE CIRCLE, BALLIA
CONSTRUCTION 12 NO R.C.C BRIDGE IN PLACE OF DAMAGED V.R.B. ON CHAUDHARY CHARAN SINGH DOHARIGHAT MAIN CANAL
2026_UPIDC_1135977_1
01/S.E/2026-27
Open Tender
Civil Works
Item Wise
365 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹18 L
SUPERINTENDING ENGINEER, DRAINAGE CIRCLE, BALLIA
5 May 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of R.C.C.work including stacking of dismental material including all cost of labour, material, T&P, etc. complete. | - | cum | - | - |
| 2 | Dismentaling of Brick work in cement Mortar including all cost of labour, material, T&P, etc. complete. | - | cum | - | - |
| 3 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal initial lead, lift, including all cost of labour, material, T&P, etc. complete. | - | cum | - | - |
| 4 | Laying P.C.C. work in M10 with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | - | cum | - | - |
| 5 | Centering and shuttering for P.C.C work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | - | Sqm | - | - |
| 6 | Centering and shuttering for R.C.C including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | - | Sqm | - | - |
| 7 | Laying R.C.C. work in M25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | - | cum | - | - |
| 8 | Reinforcement with carriage, cutting, bending,binding & placing in position including cost of binding wire,labours,T&P etc all complete. | - | M.T | - | - |
| 9 | Dewatering work | - | job | - | - |
| 10 | E/w for making Road Diversion & ramp in all type of soil with initial lead, lift including all cost of labour, material, T&P, etc. complete. | - | cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
New_BID_1.pdf
Tender Documents • 0.95 MB
BOQ_2121132.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .