Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No2(1)) dtd29/08/2024of Kurichy GP | |
| 2 | L2₹7.5 L+₹8,267.19 (1.11%)Rejected-AOC | L2 | Rejected-AOC Higher rate and hence not admitted |
Tender Value
₹6.8 L
EMD Value
₹16,912
Closing Date
14 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
Assistant Engineer Kurichy Gp
CIVIL WORKS
2024_LSGD_683419_1
04/AE/KRCY/24-25
Open Tender
Civil Works - Roads
Item Rate
180 days
Kurichy Gp
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,495
₹16,912
5 Feb 2025
5 Aug 2024
19 Aug 2024
5 Aug 2024
14 Aug 2024
5 Aug 2024
Amount
Concreting the road
OD76287/2023-2024:Filling with contractor,s own earth ( excluding rock) in open areas in layers not exceeding 20cm in depth consolidating each layer deposited by layer by ramming and watering lead upto 50m and lift upto 1.5m as per direction of engineeers in charge
OD50431/2023-2024:Filling up low lying and water logged areas with local material /quarrymuck
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
OD50796/2023-2024:Providing and fixing hand rail of approved size by welding etc. railing, balcony railing staircase railing and similar works-GI pipes Details of cost for hand rail of railing of two flights of staircase, length of hand rail=5.4m Materials : GI pipe 40mm nominal bore+5.4m add wastage@ 5%= 0.27m total= 5.67m
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD76315/2023-2024:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802,803,1202 and amp.1203 & PCC M10 grade Nominal mix (excluding formwork)
11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5)
JAMES THOMAS
Bidder Name
N. C. UTHUPPAN
JAMES THOMAS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1063258.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .