Tender Value
₹19.6 L
EMD Value
₹20,000
Closing Date
25 Aug 2026, 6:00 pmDue tomorrow
Executive Engineer, Petlad Irrigation Division Petlad
Constructing Box type V.R.B. in place of damaged Pipe type VRB at ch. 24300 ft m on Sinjiwada Distry.
332872
05 of 2026-2027
Open
Miscellaneous Works
Works
Anand
13 documents required · 10 mandatory · 3 optional
₹900
Executive Engineer Petlad Irrigation Division Petlad
₹20,000
11 Aug 2026
11 Aug 2026
11 Aug 2026
25 Aug 2026
11 Aug 2026
No. figures(Rs.)
Dismantling the existing brick masonry including sorting
out and stacking the useful material and removing the
debris and making good the damages etc. complete as
directed. In Cement Mortar
Dismantling the existing R.C.C. Pipes including sorting
out and stacking of the useful materials of the following
diameters including refilling the trenches etc. complete
as directed.1000 mm. to 1200mm
Dismantling the R.C.C. work and disposing off the stuff
3 including stacking of the useful materials etc. complete 14.00 cum 1732.80
as directed.Light Reinforcement ( Main bar upto 16 mm.
Excavation for foundation in all sorts of soil including
yellow sandy gravelly soils ,soft & hard murrum etc. in
dry condition including depositing the excavated stuff in
uniform layers in banks or as and where directed etc.
complete for lead up to 500m and all lift. (BY
MACHINERY) Including Dewatering
BILL OF QAUANTITIES
of Constructing Box type V.R.B.in place of damaged Pipe type VRB at Ch 24300 ft m on Sinjiwada Distry
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by
mass and machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding, compaction
by vibrator, curing as directed with all lead & lift etc
complete Without Dewatering and excluding cost of steel
reinforcement. (A) For Foundation concrete / General
purpose (a) C. C. Nominal Mix, M-10 and MSA-40 mm
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by
mass and machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding, compaction
5 (b) by vibrator, curing as directed with all lead & lift etc 65.00 cum 3935.00
complete Without Dewatering and excluding cost of steel
reinforcement. (A) For Foundation concrete / General
purpose (d) C. C. Nominal Mix, M-15 and MSA-20
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc complete without
dewatering and excluding the cost of steel reinforcement.
(A) For Footing of column / Abutment / Pier / Bottom
slab (e) Concrete grade M-25 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by vibrator,
6(b) curing as directed with all lead & lift etc complete without 62.00 cum 4457.00
dewatering and excluding the cost of steel reinforcement.
(B) For Pier and Abutments / Wing wall / Head wall /
Return wall / Dowel Wall etc. (g) Concrete grade M-15
and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc complete without
dewatering and excluding the cost of steel reinforcement.
(D) For Kerb / Wearing coat. (n) Concrete grade M-25
and MSA -10 to 20mm
BILL OF QAUANTITIES
of Constructing Box type V.R.B.in place of damaged Pipe type VRB at Ch 24300 ft m on Sinjiwada Distry
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by vibrator,
6(d) curing as directed with all lead & lift etc complete without 32.00 cum 5642.00
dewatering and excluding the cost of steel reinforcement.
(E) For Column / Beam / Solid Slab of Road Bridge /
Barrel / Cutoff wall etc. (q) Concrete grade M-25 and
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary
formwork, centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc complete without
dewatering and excluding the cost of steel reinforcement.
(F) For Parapet wall of Road Bridge / Structure (t)
Concrete grade M-25 and MSA -10 to 20 mm
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where
7 necessary, hooking etc. complete as per drawing for all 78.30 qtl 7194.00
lead and lifts.
Providing and laying in position 110 mm dia (6 kgf/sq
8 cm) P.V.C. Pipe for weep holes with non corroding jali in 7.00 rmt 262.50
abutments, wing walls, retaining walls etc. complete.
Providing and fixing 110 mm diameter P.V.C..Pipe (6 kgf
9 / sq cm) Water spout with necessary iron grating as per 2.00 rmt 369.20
Backfilling the foundation trenches around the
watering, ramming, compacting etc. complete. (By
Machinery)
Providing temporary all weather and fair weather
diversion suitable for traffic during the construction
period of the structure including all safty measures as
per situ situation.
BILL OF QAUANTITIES
of Constructing Box type V.R.B.in place of damaged Pipe type VRB at Ch 24300 ft m on Sinjiwada Distry
Item Rate in
Description of Item Quantity Unit Amount (Rs.)
No. figures(Rs.)
Providing drone videography on the ocassion of function
12 or for before/on going/after completion of construction 1.00 job work 4000.00
work as directed by engineer in charge
Rs. Ninteen Lac Fifty Seven Thousand Seven & Ninety Eight Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should be written in
figures and words) of the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Put to tender Estimated amount Put to tender
Deduct …………………….% Below Add ……………. % above
In Words In Words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-
In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC 10/2017
Cement Consumption /16/CDate:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Divisional Accountant
Petlad Irrigation Division Petlad Irrigation Division
Petlad Petlad
Deputy Executive Engineer Executive Engineer
Sojitra Irrigation Sub Petlad Irrigation Division
Sojitra Petlad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 05 of 2026-27 online.pdf
1 Front Page.pdf
3 Notice Inviting online Tender (1).pdf
4.SBD-Documen 24300 ft 6.08.2026.pdf
5 General item wise specification 24300 VRB 6.08.2026.pdf
BOQ.pdf
cement.pdf
DTP Letter Ch. 24300 feet Sinjiwada.pdf
Sch B 24300 ft.pdf
sreel.pdf
Standard Techanical Specification of MIC 24300 ft.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].