Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance | -19.99% | ₹6.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.0 L+₹59,112.28 (9.24%)Admitted-Fee/PreQual/Technical/Finance BHULI E BLOCK SEC 4 BANK MORE DHANBAD | -12.60% | ₹7.0 L+₹59,112.28 (9.24%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.2 L+₹77,909.83 (12.2%)Admitted-Fee/PreQual/Technical/Finance | -10.25% | ₹7.2 L+₹77,909.83 (12.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.2 L+₹79,029.68 (12.3%)Admitted-Fee/PreQual/Technical/Finance | -10.11% | ₹7.2 L+₹79,029.68 (12.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.4 L+₹1.0 L (16.2%)Admitted-Fee/PreQual/Technical/Finance | -7.05% | ₹7.4 L+₹1.0 L (16.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.0 L
EMD Value
₹16,000
Closing Date
9 Sept 2026, 5:00 pmClosed
Exe Eng R D Spl Div, Dhanbad
Exe Eng R D Spl Div, Dhanbad
Renovation of Gortopa 4 Anganwadi Centre under Govindpur Block in Dhanbad District
2026_RDSPL_118141_1
26/2026-27/RDSD/EE/Dhanbad/Gr. 33
Open Tender
Civil Works
Percentage
90 days
Govindpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,250
₹16,000
11 Sept 2026
2 Sept 2026
11 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil(vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, Extra for earthwork in hard soil as per specification and direction of E/I. | - | CUM | 167.33 | - |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M including all lifts levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. | - | CUM | 151.82 | - |
| 3 | Providing Coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts . all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | - | CUM | 589.51 | - |
| 4 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | CUM | 1,993.04 | - |
| 5 | Fencing With Welded Steel Wire Fabric 75 mm x 50 mm (Providing 1.20 metre high fencing with angle iron posts 50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end and every 10th post to be strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.) | - | RMT | 876.1 | - |
| 6 | Fencing With Welded Steel Wire Fabric 75 mm x 50 mm (Providing 1.20 metre high fencing with angle iron posts 50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end and every 10th post to be strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.) | - | Meter | 876.1 | - |
| 7 | Dismantling patent stone floor including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | SQM | 40.75 | - |
| 8 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | SQM | 21.46 | - |
| 9 | FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | - | CUM | 128.88 | - |
| 10 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | SQM | 330.34 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.23 MB
SBD26GR33.pdf
Tender Documents • 7.56 MB
BOQ_159767.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .