Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.4 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L-1 | Accepted-AOC AOC | |
| 2 | L-2₹4.4 L+₹60,892.42 (16.2%)Rejected-Finance 271 CIVIL LINE GURUGRAM GURUGRAM GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L-2 | Rejected-Finance REJECTED SINCE L-2 BIDDER | |
| 3 | L-3₹5.1 L+₹1.3 L (34.9%)Rejected-Finance AT ARGADA DISTT RAMGARH JHARKHAND | L-3 | Rejected-Finance REJECTED SINCE L-3 BIDDER | |
| 4 | L-4₹5.4 L+₹1.6 L (42.5%)Rejected-Finance JHARKHAND | LOHARDAGA | JHARKHAND | 835302 | L-4 | Rejected-Finance REJECTED SINCE L-4 BIDDER |
Tender Value
₹5.6 L
EMD Value
₹6,900
Closing Date
22 Mar 2023, 6:55 pmClosed
SO EnM
GM Unit, Kuju Area
Oil filtration and repairing/maintenance of different transformers installed at different locations of Topa Project under Kuju Area.
2023_CCL_275354_1
GM (K)/EnM/e-Tender/22-23/219
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Kuju
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,900
19 May 2023
15 Mar 2023
23 Mar 2023
15 Mar 2023
22 Mar 2023
15 Mar 2023
15 Mar 2023 - 19 Mar 2023
Amount
1.6 MVA, 11 KV/3.3 KV Power Transformer main sub-station
Filtration of transformer oil
Cost of HT bushing with stud
Cost of LT bushing with stud
Cost of Gasket
Complete painting, cleaning of transformer
Labour charge opening and fitting Sl. No. 2 to 4 @15%
1 MVA, 11 KV/3.3 KV Power Transformer main sub-station
Filtration of transformer oil
Cost of LT bushing with stud
Cost of Gasket
Complete painting, cleaning of transformer
Labour charge opening and fitting Sl. No. 2 & 3 @15%
1 MVA, 11 KV/3.3 KV Power Transformer main sub-station
Filtration of transformer oil
Cost of LT bushing with stud
Cost of Gasket
Complete painting, cleaning of transformer
Labour charge opening and fitting Sl. No. 2 & 3 @15%
630 KVA, 3.3 KV/440V Transformer installed at New miner colony
Filtration of transformer oil
Cost of tapechanger
Cost of HT bushing with stud
Cost of LT bushing with stud
Cost of Breather with silica gel
Cost of Gasket
Complete painting, cleaning of transformer
Labour charge opening and fitting Sl. No. 2 to 6 @15%
500 KVA, 3.3 KV/440V Transformer installed at B type sub-station
Filtration of transformer oil
Cost of tapechanger
Cost of HT bushing with stud
Cost of LT bushing with stud
Cost of Breather with silica gel
Cost of Gasket
Complete painting, cleaning of transformer
Labour charge opening and fitting Sl. No. 2 to 6 @15%
500 KVA, 3.3 KV/440V Transformer installed at Shiv mandir sub-station
Filtration of transformer oil
Cost of HT bushing with stud
Cost of LT bushing with stud
Cost of Breather with silica gel
Cost of Gasket
Complete painting, cleaning of transformer
Labour charge opening and fitting Sl. No. 2 to 5 @15%
315 KVA, 3.3 KV/440V transformer installed at Shiv mandir sub-station
Filtration of transformer oil
Cost of LT Bushing Insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost opening and fitting Sl. No. 2 & 3 @15%
Profit @ 10%
Total impact of GST for the purpose of CTC
Power control system
Maa Katyayani Enterprises
M/s Achal Electricals
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .